Navy

Unofficial United States Navy Information and Training Resource

Note: This is not an official United States Navy Information and Training Resource. The views expressed herein are solely those of the persons expressing them and do not represent the views of the United States, Department of Defense, or Department of the Navy.

About this Navy Page | About this webpage Podcast (14:53)
24 Years Online | 28 Sections | 410+ Subsections | 710+ Videos | 3,470+ Links

  • NEW ITEM:
  • ADVICE NEEDED: If you see anything that needs to be added, corrected, or fixed, don’t hesitate to contact me. Thank you!

SEARCH: Ctrl+F or A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z

  • SEEKING ASSISTANCE NOW, USE THIS!!! Prompt ChatGPT, Grok, Gemini, or Claude for a Navy-related response, such as,” How does the U.S. Navy assist with locating and replacing lost service awards or medals?”

Top Frequently Used Links

(Last Update: Thursday, 27FEB2025)

  1. Telework:
  2. Records:
  3. NROWS (Navy Reserve Order Writing System) (Help Desk: 800-537-4617 or 833-637-3669, or need@nesd-mail.onbmc.mil (Subject Line: Enter System Name and in the Body include UIC, Command Name, Vessel Name/Number, and Issue)); AT Waivers (RESPERSMAN 1571-010) (form)
  4. My Navy Portal (CAC MNP) | STATUS | (MNP Help Desk: 833-637-3669 or need@nesd-mail.onbmc.mil)
  5. FLTMPS (Fleet Training, Management and Planning System)
  6. Navy eLearning (Help Desk: 833-637-3669, Chat, or need@nesd-mail.onbmc.mil)
  7. MyTWMS, TWMS, or TOPS (Total Workforce Management System) – Help Desk: eas@ctirms.com (primary), TWMSAdministrator@navy.mil (secondary); or NMCI Help Desk toll 866-843-6624 and select the TWMS option.
  8. NRRM (Navy Reserve Readiness Module) Helpdesk: NRRM-Support@innovasi.com or 619-647-3177
  9. ESAMS (Enterprise Safety Application Management System) Help Desk at 865-693-0048
  10. MyNavy HR / NPC (Navy Personnel Command) – Customer Service: 866-827-5672 or askmncc@navy.mil
    • MyNavy Career Center (MNCC) – Customer Service: 833-330-6622, askmncc@navy.mil, or MNCC Chat
    • NIPRGPT – An experimental generative AI chatbot running on the secure NIPRNet to assist DoD personnel with tasks like drafting, coding, and data analysis while fostering AI experimentation and workforce training.
    • RAIN (Reserve Artificial Intelligence Navigator) – SEARCH: Current expertise is mostly confined to Navy Reserve Instructions, Notices, and All Hands messages.

Upcoming Events

(Last Update: Thursday, 24APR2025)

  1. Monthly:
  2. Semi-Annual: Use on October 1st (01OCT-31MAR) and April 1st (01APR-31SEP) (Reference), and/or change in status:
  3. Annual:
  4. Change in Assignment: RFMT (Reserve Force Manpower Tools) – A system for billet assignments.

A-Z Links

A — “Alfa” (2nd Ref)

ACRONYM

(Last Update: Saturday, 04JAN2025)

ADMINISTRATIVE (ADMIN) PROCEDURES

(Last Update: Sunday, 05JAN2025) (POC LOCATION: N1 ADMIN)

Navy Personnel Command > Support & Services > MyNavy Career Center

  • Breakout between Anniversary Dates, Retirement Dates, and Drill points.
    • Each Sailor is given 15 free points for each year of membership in a reserve component.
    • Anniversary Dates (BUPERSINST 1001.39F, Ch 20 – 2005)
      • Per DOD Instruction 1215.07, the date used to determine the anniversary year is established by the date the member entered into active service or active status in a Reserve component, whichever is earlier.
      • Members with previously established anniversary dates will retain that date as the beginning of their anniversary year.
      • A member’s anniversary year most likely does not coincide with fiscal or calendar years.
      • When a member with a break in service returns to an active Reserve status or active service, the revised anniversary year start date shall be the date of return or reentry.
    • Qualifying Year for Retirement – To have a qualifying year for retirement, a Sailor must earn 50 points during an anniversary year. (15 free points + 1 point per completed drill period)
    • Minimum Participation Requirement – Officers with fewer than 20 years are required to attain at least 27 points to remain in an active reserve status. Enlisted with fewer than 20 years do not have a minimum participation requirement
    • Criteria for Satisfactory Participation (BUPERSINST 1001.39F; Pg 11-4)
      • Has nothing to do with the Qualifying years for retirement
      • Less than 9 UA (Unauthorized Absence) per rolling 12-month period
      • Perform a minimum of 12-14 days AT (Annual Training) each FY when required (Exceptions in BUPERSINST 1001.39F; Ch 13)
      • Members must report as directed for physical and dental examinations and provide requested medical information for retention in the Navy Reserve
      • Keep the CO (Commanding Officer) informed of matters affecting mobilization readiness
      • Respond to official correspondence
      • Must comply with an involuntary recall to Active Duty
    • AT Waivers (RESPERSMAN 1571-010) (form)
      • Approved waivers satisfy requirements for Satisfactory Participation / Advancement eligibility
      • 50 points are still required to obtain a qualifying year for retirement
  • Request Your Military Service Records DD-214 Online (Source: Archives)

ADOS (ACTIVE DUTY OPERATIONAL SUPPORT)

(Last Update: Friday, 09MAY2025) (POC LOCATION: N7 TRAINING)

Navy Personnel Command > Career Management > Detailing > Augmentation > 462 ADOS

  • Active Duty Operational Support (ADOS), previously known as Active Duty for Special Work (ADSW) – A voluntary program allowing Reserve Component (RC) personnel to serve temporary active duty tours to support special projects, exercises, or unplanned operational needs for Active Component (AC) or RC programs. These assignments, typically lasting 30-179 days, provide reservists with full active duty pay and benefits while filling short-term operational gaps that regular active duty personnel cannot meet. Reservists interested in ADOS opportunities should stay informed through official Navy channels (ZipServe) and ensure they are administratively and medically prepared for service.
  • VIDEO: Navigating Navy Reserve Orders: IDT, AT, ADT, Mobilization & More! | How to Find Opportunities (17FEB2025)
  • See also the MOB (MOBILIZATION) section.
  • See also the TEMPORARY DUTY/RECALL section.

ADT (ACTIVE DUTY for TRAINING)

(Last Update: Thursday, 08MAY2025) (POC LOCATION: N7 TRAINING)

ADVANCEMENT

(Last Update: Sunday, 05JAN2025) (POC LOCATION: N1 ADMIN and CAREER COUNSELOR)

AI (ARTIFICIAL INTELLIGENCE)

(Last Update: Saturday, 26APR2025)

  • Artificial Intelligence (AI) Wikipedia – A computer science field focused on developing systems that can perform tasks like learning, reasoning, and decision-making, typically associated with human intelligence. AI powers applications such as web search engines, recommendation systems, virtual assistants, autonomous vehicles, and generative tools, with many techniques rooted in neural networks, statistics, and other disciplines. Founded in 1956, AI has seen cycles of optimism and funding challenges, but recent advances in deep learning and transformer architecture have driven rapid progress and significant investment, raising both opportunities and concerns about regulation and long-term impacts.
  • Prompt Perplexity AI Wikipedia for a Navy-related response, such as,” How does the U.S. Navy assist with locating and replacing lost service awards or medals?”
  • VIDEO: U.S. Naval Research Laboratory and Artificial Intelligence (13MAY2021)
  • See also the GAMECHANGER section.
  • See also the NIPRGPT section.
  • See also the RAIN (RESERVE ARTIFICIAL INTELLIGENCE NAVIGATOR) section.

AIRCRAFT CARRIER

(Last Update: Monday, 01SEP2025)

AIRCREW

(Last Update: Tuesday, 16APR2025)

  • Navy aircrews are enlisted personnel who serve as essential members of flight teams aboard both fixed-wing aircraft and helicopters. Their roles are diverse, ranging from operating tactical systems and performing search and rescue to maintaining avionics and managing cargo. This career path is demanding, rewarding, and offers opportunities for travel, technical training, and hands-on mission involvement.
  • VIDEO: Naval Aircrewman: MH-60 Romeo & MH-60 Sierra (19NOV2019)
  • See also the AVIATION MENTORING NETWORK (AMN) section.

ALL HANDS

(Last Update: Sunday, 05JAN2025) (POC LOCATION: MC or PAO)

ALLOTMENT

(Last Update: Thursday, 24APR2025) (POC LOCATION: RESPAY or PSD)

Navy Personnel Command > References > Pay & Benefits

ALMANAC

(Last Update: Sunday, 05JAN2025)

ANTITERRORISM (AT)

(Last Update: Sunday, 05JAN2025)

AOR (AREA OF RESPONSIBILITY)

(Last Update: Sunday, 05JAN2025)

APP

(Last Update: Sunday, 05JAN2025)

APPLY (RESERVE FORCE MANPOWER TOOLS (RFMT))

(Last Update: Sunday, 05JAN2025) (POC LOCATION: OFFICERS- CDR & CAPT)

NOTE: Remember to login before starting the research…

View Orders – View your current orders in the ‘Profile and Registration’ section under Current Assignment

ARQ (ANNUAL READINESS QUESTIONNAIRE)

(Last Update: Sunday, 05JAN2025) (POC LOCATION: N1 ADMIN/READINESS COORDINATOR)

A SCHOOL

(Last Update: Sunday, 05JAN2025) (POC LOCATION: N7 TRAINING)

ASM (ADVANCED SKILLS MANAGEMENT)

(Last Update: Sunday, 05JAN2025) (POC LOCATION: N1 ADMIN and CAREER COUNSELOR)

  • Advanced Skills Management (ASM) – A web-based training management tool that supports identifying and completing job-related tasks, provides real-time assessment, identifies training deficiencies, and provides technical training tracking and validation of a member’s knowledge and skills. It provides a structure for standardizing training requirements across an organization or platform while simultaneously allowing a component command the flexibility to address unique requirements. ASM supports training and readiness using task-based methodologies. It will enable the work center and line supervisors the ability to schedule daily maintenance activities with full visibility of up-to-date technician qualifications and give individuals the ability to see their assigned training activities and easily track their progress.
  • To establish an ASM account, contact your command ASM Coordinator or the ASM helpdesk at (360) 315-7450.

AQD (ADDITIONAL QUALIFICATION DESIGNATION)

(Last Update: Sunday, 05JAN2025) (POC LOCATION: N1 ADMIN and CAREER COUNSELOR)

ARPR/ASOSH (ANNUAL RETIREMENT POINT RECORD / ANNUAL STATEMENT OF SERVICE HISTORY)

(Last Update: Sunday, 05JAN2025) (POC LOCATION: N1 ADMIN and CAREER COUNSELOR)

AT/ADT EMUSTER

(Last Update: Sunday, 05JAN2025) (POC LOCATION: CPPA and N7 TRAINING)

  • The AT/ADT eMuster module in NSIPS (Navy Standard Information Personnel System) was created to modernize the check-in and check-out processes for Reservists with the primary goal of expediting the timely processing of pay and benefits.
  • For additional information or assistance, contact: MyNavy Career Center (MNCC): 833-330-6622 or E-mail: askmncc@navy.mil
  • NSIPS AT/ADT eMuster Location: CPPA Account > Reserve Transactions > AT/ADT Orders Check In/Out
  • Training Tools: NSIPS Training > Interactive Training > Annual Training and Active Duty for Training > eMuster
  • AT/ADT eMuster Reserve Sailor Overview (FEB2020)
  • See also the ADT (ACTIVE DUTY for TRAINING) section.
  • See also the AT (ANNUAL TRAINING) section.
  • See also the TEMPORARY DUTY/RECALL section.
  • See also the TRAINING section.

AT (ANNUAL TRAINING)

(Last Update: Sunday, 05JAN2025) (POC LOCATION: N7 TRAINING)

  • Annual Training (AT) – Selected Reserve personnel must perform 12 to 14 days AT/ADT each fiscal year (FY) as scheduled by the unit Commanding Officer (CO) and per COMNAVRESFORCOMNOTE 1001 (FY Force Execution Guidance).
  • Annual Training (AT) Wikipedia – Usually advertised as two weeks each year that personnel must attend annual training periods. This training may be conducted at the home unit, a reserve unit’s supported active duty command, a national training center, or any other appropriate location. The purpose is to maintain and improve the skill level of the individual with some real military experience of work or exercise under supervision. Training can be at given locations in the continental United States or abroad with the home unit or any other unit of the military for support. Any other additional dates will be considered another 15 days from another fiscal year and will be given back-to-back for the total amount of 30 days of annual training.
  • AT periods that exceed 14 days are known as Exceptional Annual Training (E-AT). These periods are authorized per COMNAVRESFORNOTE 1001 but must be approved by the Unit CO, OSO, and CNRFC (via waiver request). The E-AT period is approved by the Unit CO, or designated representative, in the first step of NROWS routing.
  • VIDEO: Navigating Navy Reserve Orders: IDT, AT, ADT, Mobilization & More! | How to Find Opportunities (17FEB2025)
  • VIDEO: How To Prepare For Annual Training NAVY RESERVE EDITION| Navy Transition Coach (14JUN2024)
  • See also the TEMPORARY DUTY/RECALL section.
  • See also the TRAINING section.

AUGMENTATION

(Last Update: Sunday, 05JAN2025)

AVD (AZURA VIRTUAL DESKTOP)

(Last Update: Sunday, 05JAN2025) (POC LOCATION: N6 INFORMATION PROFESSIONAL (IP) OFFICER or INFORMATION TECHNOLOGY (IT))

AWARDS

(Last Update: Monday, 27JAN2025) (POC LOCATION: N1 ADMIN, Award Officer, &/or CAREER COUNSELOR)

Navy Personnel Command > Career Management > Records Management > Decorations and Medals (Awards)


B — “Bravo”

BEAMSLEY

(Last Update: Tuesday, 07JAN2025) (POC LOCATION: LCDR Kelly Beamsley, USNR, Retired)

BERTHING (“SLEEPING / LIVING QUARTERS”)

(Last Update: Tuesday, 07JAN2025) (POC LOCATION: N4 LOGISTICS)

BIB

(Last Update: Tuesday, 07JAN2025) (POC LOCATION: CAREER COUNSELOR)

  • Navy Advancement Bibliographies (BIB) – Lists of occupational references “developed to help guide Sailors in their studies for advancement exams.” The bibliographies are specific to all ratings and updated regularly by rating subject matter experts.
  • Enlisted advancement manual instruction BUPERSINST 1430.16G
  • Go to Navy Cool > Click “Rating” next to “Go to:” > Click your rating in the list > Next > “Advancement Exam Bibliographies” > Select rank > Select the appropriate “Bibliographies” depending on your status.
  • Tip: Bibliographies are posted on Navy Cool six months before the exam date.
  • Tip: The Chief Exam is always the third Thursday in January, and Petty Officer Exams are always the first three Thursdays in March and September. If you’re up for an exam, schedule your leave for another time.
  • VIDEO: NAVY RESERVE(PRIOR Service)||How to search BIBs via Navy Cool. (18MAR2020)
  • See also the ADVANCEMENT section.

BILLET

(Last Update: Tuesday, 07JAN2025) (POC LOCATION: N1 ADMIN)

  • Billet Wikipedia – A specific military manpower space, which is assigned qualifiers, that define the duties, tasks, and functions to be performed and the specific skills and skill level required to perform the delineated functions. Also referred to as “RQMT” which means Manpower Requirement.
  • OLD System: CMS-ID now NEW System: MyNavy Assignment (MNA)
  • See also the MANPOWER (places) section.
  • See also the MYNAVY ASSIGNMENT (MNA) section.

BIOGRAPHIES

(Last Update: Tuesday, 07JAN2025)

BLUE ANGELS

(Last Update: Tuesday, 07JAN2025) (POC LOCATION: MC or PAO)

BLUEJACKET’S MANUAL (BJM)

(Last Update: Tuesday, 07JAN2025) (POC LOCATION: CHIEF)

  • Bluejacket’s Manual Wikipedia – The basic handbook for United States Navy personnel. First issued in 1902 to teach recruits about naval procedures and life and offer a reference for active sailors, it has become the “bible” for Navy personnel, providing information about a wide range of Navy topics. The current version, issued in 2023, is the 256th Edition and is given to all enlistees. (Buy Book)
  • VIDEO: The Bluejacket’s Manual | Master Chief’s Sea Chest (09JUL2020)

BLUF (BOTTOM LINE UP FRONT)

(Last Update: Tuesday, 07JAN2025) (POC LOCATION: N1 ADMIN)

  • BLUF (Bottom Line Up Front) Wikipedia – A standard in U.S. military communication whose aim is to make military messages precise and powerful. It differs from an older, more traditional style in which conclusions and recommendations are included at the end, following the arguments and considerations of facts. The BLUF concept is not exclusive to writing since it can also be used in conversations and interviews.
  • VIDEO: BLUF Email Technique (US Military uses this) (17JAN2023)
  • See also the COMMUNICATION section.

BMR (BASIC MILITARY REQUIREMENTS)

(Last Update: Tuesday, 07JAN2025) (POC LOCATION: CAREER COUNSELOR or N7 TRAINING)

BOARD

(Last Update: Tuesday, 07JAN2025) (POC LOCATION: N1 ADMIN, CAREER COUNSELOR, or NPC)

BOL (BUPERS ONLINE)

(Last Update: Tuesday, 07JAN2025) (POC LOCATION: N1 ADMIN)

BOOKS

(Last Update: Tuesday, 07JAN2025)

BOOTCAMP (A.K.A. Recruit Training Command, Great Lakes (RTC Great Lakes))

(Last Update: Tuesday, 07JAN2025) (POC LOCATION: Active Duty Enlisted Recruiter)

BREAK TIME

(Last Update: Tuesday, 07JAN2025)

BRIDGE

(Last Update: Tuesday, 07JAN2025)

  • Bridge Wikipedia – (also known as a command deck), or wheelhouse (also known as a pilothouse) – A room or platform of a ship, submarine, airship, or spaceship from which the ship can be commanded. When a ship is underway, the bridge is manned by an officer of the watch, aided usually by an able seaman acting as a lookout. During critical maneuvers, the captain will be on the bridge, often supported by an officer of the watch, an able seaman on the wheel, and sometimes a pilot, if required.
  • VIDEO: Reasons Why US Navy Sailors Never Get On The Bridge Of An Aircraft Carrier (22AUG2022)
  • See also the TRAINING section.

BRS (BLENDED RETIREMENT SYSTEM)

(Last Update: Tuesday, 07JAN2025) (POC LOCATION: CAREER COUNSELOR or N1 ADMIN or N7 TRAINING)

BUMED (BUREAU OF MEDICINE AND SURGERY)

(Last Update: Tuesday, 07JAN2025) (POC LOCATION: MEDICAL)

BUPERS (BUREAU OF NAVAL PERSONNEL) / NPC (NAVY PERSONNEL COMMAND) / PERS (PERSONNEL)

(Last Update: Tuesday, 07JAN2025) (POC LOCATION: N1 ADMIN)

BZ (BRAVO ZULU)

(Last Update: Tuesday, 07JAN2025)


C — “Charlie”

C2 (COMMAND AND CONTROL)

(Last Update: Wednesday, 16APR2025) (POC LOCATION: N6 IT)

  • Command and Control (C2) Wikipedia – A crucial concept, particularly within military and organizational contexts, representing the system through which authority and direction are exercised to achieve objectives. The definition of C2 emphasizes the integration of organizational, technical, and human resources to solve problems and accomplish missions, as highlighted by various sources, including military field manuals and NATO doctrine. Understanding the nuances of C2, including its reliance on agreed terminology for effective communication and coordination, is vital for those seeking information on strategic leadership and operational management.

C2OIX (COMMAND AND CONTROL OFFICIAL INFORMATION EXCHANGE)

(Last Update: Tuesday, 13MAY2025) (POC LOCATION: N6 IT)

  • Command and Control Official Information Exchange (C2OIX) – The DoD’s standardized approach for secure and efficient information sharing between command and control systems, ensuring interoperability across diverse military operations. This framework leverages net-centric data strategies and a C2 Information Sharing Framework (C2ISF) to facilitate robust and reliable data exchange, even in tactical and challenging environments. As a continuously modernizing system overseen by the Joint Staff J-6, C2OIX is crucial for maintaining information superiority and enabling effective decision-making in joint, coalition, and multinational missions. [More details from Perplexity research]

CAC (COMMON ACCESS CARD)

(Last Update: Thursday, 09JAN2025) (POC LOCATION: RAPIDS SITE LOCATOR MAP or N6 IT)

CANTRAC (CATALOG OF NAVY TRAINING COURSES)

(Last Update: Thursday, 09JAN2025) (POC LOCATION: N7 TRAINING)

  • Important: Log on to eNTRS FIRST before going to CANTRAC.
  • eNTRS (enterprise Navy Training Reservation System) – Provides the means for Fleet activities to view and request seats in designated Navy schools. It is the primary system for checking/acting on seats for CANTRAC courses. It contains information, such as Class Rosters, Quotas, Previous Completed Courses, Booking, etc.
  • Catalog of Navy Training Courses (CANTRAC) [Old Link]- A NAVEDTRA publication, which contains information concerning all formal Courses of instruction throughout the Navy. CANTRAC is also an output product derived from the CeTARS (Corporate enterprise Training Activity Resource Systems) database available online (Help Desk). There are 2 routes to CANTRAC: 1) The first option is to access CANTRAC via the CeTARS Menu. 2) The second option involves entry via MNP.
  • VIDEO: CANTRAC Tutorial | SAILOR 360 at NMRTC, Bethesda (02DEC2020)
  • See also the TRAINING section.

CAREER

(Last Update: Thursday, 09JAN2025) (POC LOCATION: CAREER COUNSELOR)

CAREER COUNSELOR

(Last Update: Thursday, 09JAN2025)

Navy Personnel Command > Career Management > Career Counseling

Navy Personnel Command > Career Management > Career Counseling > Resources

CAREER DEVELOPMENT BOARD (CDB)

(Last Update: Thursday, 09JAN2025) (POC LOCATION: CAREER COUNSELOR)

Navy Personnel Command > Career Counseling > Resources

  • Career Development Boards (CDB) – Essential tools in the U.S. Navy for guiding and supporting sailors’ professional growth and career progression12. There are two main types of CDBs: command-level and department-level.
    • Command-Level CDB:
      Command-level CDBs focus on broad-based Navy programs and are held at specific milestones in a sailor’s career. These include:
      Reporting CDB (within 60 days of reporting to a new command)
      Career Waypoints (C-Way) CDB
      Separation CDB
      Professional Apprenticeship Career Track (PACT) CDB at 18 and 24 months onboard1
      The command-level CDB is chaired by the Command Master Chief (CMC) and includes the Command Career Counselor, Department and/or Divisional Leading Chief Petty Officers (LCPOs), and other relevant personnel.
    • Department-Level CDB:
      Department-level CDBs are more frequent and focus on the sailor’s personal and professional goals. These are typically held:
      At 24, 48, and 60 months onboard
      For PACT sailors at 6 and 12 months onboard
      The department-level CDB is chaired by the Department LCPO and includes the Department Career Counselor and other relevant personnel.
    • CDB Process
      Preparation: Review the sailor’s career history and CDB information sheet.
      Conducting the CDB: Discuss the sailor’s goals, qualifications, and career progression.
      Reviewing the Individual Development Plan: Update and set SMART (Specific, Measurable, Attainable, Realistic, Trackable) goals.
      Documentation: Record CDB minutes, recommendations, and comments in the Career Information Management System (CIMS).
    • Importance of CDB:
      CDBs serve several crucial purposes:
      Encourage upward mobility and improve job satisfaction1
      Ensure retention of the best-qualified sailors
      Provide opportunities for sailors to express their career intentions and personal goals
      Strengthen the chain of command through mutual trust and respect
      Connect sailors with resources to enable their success within command expectations
      By conducting effective CDBs, Navy leaders can build winning teams, improve readiness, and set sailors up for success in their careers.
  • GOOGLE: Career Development Board (CDB)
  • VIDEO: Navy Career Development Board – Training Video 2024 (29APR2024)

CAREER DEVELOPMENT SYMPOSIUM (CDS)

(Last Update: Thursday, 09JAN2025) (POC LOCATION: CAREER COUNSELOR)

Navy Personnel Command > Career Management > Talent Management > CDS

CAREER TOOLS

(Last Update: Thursday, 09JAN2025) (POC LOCATION: CAREER COUNSELOR)

Navy Personnel Command > Career Management > Career Counseling > Resources

  • Career Tools – This information informs the Command Triad of a “Career Toolbox” of Navy personnel and training applications and provides recommended actions for command stakeholders.
  • See also the TRAINING section.

CHAPLAIN (CHAP)

(Last Update: Thursday, 09JAN2025) (POC LOCATION: CHAPLAIN or RELIGIOUS PROGRAM SPECIALIST (RP))

  • Chaplain Wikipedia – Their principal purpose is “to promote the spiritual, religious, moral, and personal well-being of the members of the Department of the Navy,” which includes the Navy and the United States Marine Corps. Additionally, the Chaplain Corps provides chaplains to the United States Coast Guard.
  • 24/7 Chaplain Hotline: 757-322-5650
  • Navy Chaplain Care Navy Enterprise Service Desk (NESD) (old Navy 311) – Communications are 100 percent confidential unless the service member decides otherwise (updated listing). Call 855-628-9311 to request chaplain support. Email: Navy311@navy.mil Text: navy311@navy.mil in the “to” line
  • Religious Accommodation (RA) – RAs include accommodating a Service member for an otherwise applicable military policy, practice, or duty. Per the Religious Freedom Restoration Act, if such a military policy, practice, or duty substantially burdens a Service member’s exercise of religion, accommodation can only be denied if:
    • The military policy, practice, or duty is in furtherance of compelling governmental interest (e.g., mission accomplishment, safety, force health).
    • It is the least restrictive means of furthering that compelling governmental interest.
  • VIDEO: Navy Chaplain | What is a Chaplain? What Does a Chaplain Do? | America’s Navy (20DEC2022)
  • VIDEO: What it’s like being a Navy Chaplain (11SEP2021)

CHIEF

(Last Update: Thursday, 09JAN2025) (POC LOCATION: HMMM… ENLISTED WEARING KHAKIS;) OH, & THEY ENJOY BEING CALLED “SIR” & “MA’AM” TOO;)

  • Chief Petty Officer (CPO) Wikipedia – The seventh enlisted rank Wikipedia (with the paygrade E-7) in the United States Navy is above Petty Officer First Class and below Senior Chief Petty Officer. The term “rating” is used to identify enlisted job specialties. In this way, enlisted personnel are segregated into three segments containing different enlisted ranks. Furthermore, rates are broken down into three levels: non-rated members without a designated occupation (E-1 through E-3). Advancement to E-4 and above is dependent on graduating from a specialty school that defines what the enlisted is rated for. Petty officers (E-4 through E-6) and chief petty officers (E-7 through E-9) are part of the rated force and are considered extremely knowledgeable about their particular rating. The term rating is used to identify the career field of a chief petty officer. The grade of chief petty officer was established on 1 April 1893 in the United States Navy.
  • Chief Petty Officer (CPO) Mission, Vision, & Guiding Principles (Source: Goat Locker)
  • Goat Locker – Useful CPO/Navy information and links, including history and traditions, anecdotes, graphics, cartoons, retirement info, and a private CPO-only Forum.
  • Goat Locker Chief Petty Officer Resource Links
    • CPO History and Traditions cover the gamut from changing to the khaki hat from the white hat to guidance for a CPO dining in, a custom unique to the military.
    • CPO Anecdotes vary from poems to articles, to short stories about CPOs or for CPOs. Some are humorous while others are very serious.
    • CPO Charge Book – The CPO Charge Book: A Writer’s Guide (01NOV2022) (Source: DODReads)
    • About CPOs is a section of links to information about senior leaders of the CPO communities, articles written about CPOs, articles written by CPOs, and other short sections about the values of CPOs.
    • The Download is a section that has links to a screensaver, graphics for CPOs, a CPO skin for ICQ plus, and a program that has computer sound bells on the half-hour and hour. All are in the public domain for your use, but may not be sold.
    • Memorabilia: CPO/Navy Related Items for Sale – Advancement/Retirement gifts, Shadowboxes, rings, challenge coins, clothing, etc. Please note the Goat Locker website is not a business and does not sell anything, but does allow these links for companies owned by CPOs that are active members/users of the website and CPO Forum.
    • Goat Locker Retirement Resources
      • Retirement Planning
      • Retirement Ceremony
      • Links
      • For & About Spouses
      • Other Information
      • Anecdotes for Retirement
      • Can’t Find It Here, Try
  • History of the Rank of Chief Petty Officer (Infographic)
  • Laying The Keel (18MAY2019)
  • VIDEO:

CHIT

(Last Update: Thursday, 09JAN2025) (POC LOCATION: N1 ADMIN)

CHOKE POINT

(Last Update: Thursday, 09JAN2025) (POC LOCATION: N3 OPERATIONS)

  • In military strategy, a choke point Wikipedia is a geographical feature on land such as a valley, defile or bridge, or maritime passage through a critical waterway such as a strait, which an armed force is forced to pass through to reach its objective, sometimes on a substantially narrowed front and therefore greatly decreasing its combat effectiveness by making it harder to bring superior numbers to bear. A choke point can allow a numerically inferior defending force to use the terrain as a force multiplier to thwart or ambush a much larger opponent, as the attacker cannot advance any further without first securing passage through the choke point.
  • Some choke points, with important locations in parentheses:
  • Mapping the World’s Key Maritime Choke Points
  • VIDEO: Every Global Trade Chokepoint Explained (11JAN2024)
  • VIDEO: Most Important Chokepoints In The World (06OCT2021)

Global maritime shipping lanes and key geographic choke points.

CITIBANK

(Last Update: Thursday, 09JAN2025) (POC LOCATION: N1 ADMIN or N7 TRAINING)

CIVILIAN EMPLOYMENT INFORMATION (CEI)

(Last Update: Thursday, 09JAN2025) (POC LOCATION: N1 ADMIN)

CMC (COMMAND MASTER CHIEF)

(Last Update: Thursday, 09JAN2025) (POC LOCATION: CMC)

  • Command Master Chief (CMC) Wikipedia (Chief of the Boat (COB), Command Senior Chief) – The enlisted advisor to the command on the formulation and implementation of policies pertinent to morale, welfare, job satisfaction, discipline, utilization, and training of all enlisted personnel. The CMC is superior to all other enlisted members. CMC reports directly to the commanding officer and works closely with the executive officer. The CMC ensures sailors are effectively led and developed. Specific duties and authorities are identified in OPNAVINST 1306.2 (series). (Source: OPNAVINST 3120.32D CH-1) (15MAY2017)
  • TRIAD Resources
  • TOOL: EUCFR Guide

CMS-ID (CAREER MANAGEMENT SYSTEM (CMS) INTERACTIVE DETAILING (ID))

(Last Update: Thursday, 09JAN2025) (POC LOCATION: CAREER COUNSELOR)

CNO (CHIEF OF NAVAL OPERATIONS)

(Last Update: Thursday, 09JAN2025)

CNO READING PROGRAM

(Last Update: Thursday, 09JAN2025)

  • CNO Reading Program – Reading, discussing, and understanding the ideas found through the Chief of Naval Operations (CNO) Professional Reading Program will improve our critical thinking skills and help us become better Sailors, citizens, and leaders.

CO (COMMANDING OFFICER)

(Last Update: Thursday, 09JAN2025) (POC LOCATION: COMMANDING OFFICER (CO))

CODE OF CONDUCT

(Last Update: Thursday, 09JAN2025)

  • Code of conduct Wikipedia – Standards of behavior established in Executive Order 10631, as amended, and DoDI O-3002.05 for military personnel when isolated or held against their will. The guidance serves as a moral and ethical guide for combat, captivity, and isolation across the range of military operations, including wartime situations.
  • APP: VCNO Standards of Conduct
  • VIDEO: Articles of the Code of Conduct (24MAY2021) + Doc

COFFEE

(Last Update: Thursday, 09JAN2025)

COLLEGE

(Last Update: Thursday, 09JAN2025) (POC LOCATION: NAVY COLLEGE OFFICE, CAREER COUNSELOR, and N7 TRAINING)

COLORS

(Last Update: Thursday, 09JAN2025)

    • Colors Wikipedia – The United States Navy performs the same ceremonies, called “Morning Colors” and “Evening Colors”, at 0800 and sunset each day. When “Colors” is played aboard Navy and Marine Corps bases, those outdoors must stop to render proper courtesies by saluting if in uniform or, if out of uniform, by standing at attention until “Carry On” is sounded. Marines and sailors driving on base during this time are expected to stop their vehicles and stand at attention while seated in their vehicles until the ceremony is over.
    • VIDEO: Colors | SAILOR 360 at NMRTC, Bethesda (17FEB2021)

COMMAND

(Last Update: Thursday, 09JAN2025) (POC LOCATION: COMMANDING OFFICER (CO))

COMMAND CAREER COUNSELOR (CCC)

(Last Update: Thursday, 09JAN2025) (POC LOCATION: N1 ADMIN or N7 TRAINING)

COMMANDER’S INTENT

(Last Update: Thursday, 09JAN2025)

  • Commander’s Intent Wikipedia – “Commander’s intent is a clear and concise expression of the purpose of the operation and the military end state.” and continues with “It also includes where the commander will accept risk during the operation. The initial intent statement normally contains the purpose and military end state as the initial inputs for the planning process.”
  • VIDEO: What is the Military Commander’s Intent? (20OCT2023)

COMMON MILITARY TRAINING (CMT)

(Last Update: Friday, 21NOV2025) (POC LOCATION: N7 TRAINING)

COMMUNICATION

(Last Update: Wednesday, 04JUN2025)

CONFERENCE

(Last Update: Thursday, 09JAN2025)

  • Conference Wikipedia – A meeting of two or more experts to discuss and exchange opinions or new information about a particular topic. Conferences can be used as a form of group decision-making, although discussions, not always decisions, are the main purpose of conferences.
  • See also the DCS (DEFENSE COLLABORATION SERVICES) section.

COUNSELING

(Last Update: Thursday, 09JAN2025) (POC LOCATION: CAREER COUNSELOR)

  • Counseling – Navy counseling is a structured process used to guide and support sailors in their professional and personal development, addressing performance, career progression, and personal issues.
    • INFORMAL: Most military leaders can accomplish their mission and correct personnel deficiencies with simple verbal counseling.
    • FORMAL: Counseling involves formal written communications to identify and address specific undesirable behaviors in personnel, providing them with opportunities to improve before any separation proceedings are initiated.
  • Examples of Negative and Positive Counseling
  • Counseling and Rehabilitation (MILPERSMAN 1910-202)
  • See also the CAREER COUNSELOR section.
  • See also the MID-TERM COUNSELING section.

COURT MARTIAL

(Last Update: Thursday, 09JAN2025) (POC LOCATION: JAG or LN)

CPPA (COMMAND PAY/PERSONNEL ADMINISTRATOR)

(Last Update: Thursday, 24APR2025) (POC LOCATION: RESPAY or PSD)

Navy Personnel Command > Support & Services > MyNavy Career Center > Pers Pay Support > CPPA Resources

Navy Personnel Command > References > Pay & Benefits

CROSS ASSIGNMENT

(Last Update: Thursday, 09JAN2025) (POC LOCATION: N1 ADMIN and N7 TRAINING)

Operational, Administrative, and Cross AssignmentSource: Operational, Administrative, and Cross Assignment

CRUISER

(Last Update: Monday, 13JAN2025)

  • Cruiser Wikipedia – A type of warship. Modern cruisers are generally the largest ships in a fleet after aircraft carriers and amphibious assault ships, and can usually perform several operational roles from search-and-destroy to ocean escort to sea denial.
  • VIDEO: The History of Cruisers (06SEP2024)
  • See also the SHIP section.

C SCHOOL

(Last Update: Thursday, 09JAN2025) (POC LOCATION: CAREER COUNSELOR or N7 TRAINING)

CVR (COMMERCIAL VIRTUAL REMOTE)

(Last Update: Thursday, 09JAN2025) (POC LOCATION: N6 or N7 TRAINING)

C-WAY (CAREER WAYPOINT)

(Last Update: Thursday, 09JAN2025) (POC LOCATION: N1 ADMIN or CAREER COUNSELOR)

Navy Personnel Command > Career Management > Career Counseling > C-WAY

  • C-WAY (Career Waypoint) – An Information Technology (IT) system that provides a mechanism for matching personnel inventory to requirements with the best-performing Sailors. It serves as a service continuum system and is designated as a long-term force management tool, balancing manning across rates, ratings, Active Component (AC), Training and Administration of the Reserve (TAR) (was Full-Time Support (FTS)), and Reserve Component (RC) through the Bureau of Naval Personnel (BUPERS) control of the reenlistment and enlistment contract extension quotas. (C-WAY Help Desk: (901) 874-2102 or career_waypoints@navy.mil)
  • C-WAY (Career Waypoints) User Guide BUPERS-33 (27AUG2019)
  • VIDEO: Career Waypoints Designed to Further U.S. Navy Sailors’ Careers (28JUL2016)
  • See also the CAREER COUNSELOR section.

CYBERSECURITY

(Last Update: Thursday, 09JAN2025) (POC LOCATION: N6 or N7 TRAINING)

    • Cybersecurity Wikipedia – Computer security, also known as cybersecurity or IT security, is the protection of computer systems from theft or damage to the hardware, software, or the information on them, as well as from disruption or misdirection of the services they provide.
    • Department of the Navy Chief Information Officer – Cybersecurity

D — “Delta”

DCO (DIRECT COMMISSION OFFICER) (RESERVE OFFICER) (DIRCOM)

(Last Update: Monday, 13JAN2025) (POC LOCATION: RECRUITER (ZIPCODE LOCATOR))

  • DCO Wikipedia – A U.S. uniformed officer who has received a commission without the typical prerequisites for achieving a commission, such as a four-year service academy, a four-year or two-year college ROTC program, or one of the officer candidate school or officers training school programs.
  • Unofficial Processing Training: Reserve Officer Direct Commission Officer (DCO) package
  • Find a Navy Reserve Officer Recruiter
  • An Enlisted to Officer needs a minimum of 8 years of Officer commission service to retire. – Officer To Lose 1/3 Of Retirement Pay
  • The DCO Onboarding Instruction (COMNAVRESFORINST 1120.3C) (11MAY2020) – Are details management and training requirements of Direct Commission Officers. This triggered the implementation of the newest MAS code: “DCO.”
    The DCO code will be applied to Direct Commission Officers to ensure they complete the Direct Commission Officer Indoctrination Course within their first year in the Navy Reserve. Additionally, the DCO code will ensure those members are not selected for mobilization. It is important to note that a Direct Commissioned Officer MUST use their first AT period to attend DCOIC, as no other orders will be approved until that member has attended the school.
  • Navy Reserve Onboarding Website
  • Direct Commission Officer (DCO) Cancellation / Transition: On 1 October 2019, the Reserve Officer Direct Commissioning Officer Indoctrination Course (DCOIC) was consolidated with the 5-week Officer Development School (ODS). (Source: NAVADMIN 101/19
  • ODS Student Required Knowledge Sheet (February 2020)
  • Navy Reserve Direct Commission Officer (DCO) Handbook (JUN2023) [Old DCO Handbook]
  • Officer Development School (ODS) – The course is both comprehensive and intense and is designed to facilitate the introduction to your responsibilities as a naval officer, where you learn about different aspects of the United States Navy, including military structure, traditions and customs, the legal system, and finally, military etiquette. Contact the ODS Deputy Director at (401) 841-3345, Mon. – Fri. from 0800-1600 for ODS matters only, or email OTC_Admin@navy.mil. For emergency issues or problems with check-in after hours and on weekends, contact the Command Duty Officer (CDO) at (401) 862-4321. Location: Officer Training Command Newport (OTC).
  • See also the EDUCATION / SCHOOL / TRAINING section.
  • See also the NEW TO THE NAVY section.

DCS (DEFENSE COLLABORATION SERVICES)

(Last Update: Monday, 13JAN2025)

DD FORM 214

(Last Update: Monday, 04AUG2025) (POC LOCATION: RAPIDS SITE LOCATOR)

DECK

(Last Update: Monday, 13JAN2025)

  • Deck Wikipedia -A deck is a permanent covering over a compartment or the hull of a ship. On a boat or ship, the primary or upper deck is the horizontal structure that forms the “roof” of the hull, strengthening it and serving as the primary working surface. Vessels often have more than one level, both within the hull and in the superstructure above the primary deck, similar to the floors of a multi-story building, that are also referred to as decks, as are certain compartments and decks built over specific areas of the superstructure.
  • VIDEO: Why Did Sailors Swab The Deck? – Naval History Animated (16JUN2018)

DEERS (DEFENSE ENROLLMENT ELIGIBILITY REPORTING SYSTEM)

(Last Update: Monday, 13JAN2025) (POC LOCATION: RAPIDS SITE LOCATOR)

DEFENSE ACQUISITION UNIVERSITY (DAU)

(Last Update: Monday, 13JAN2025)

  • Defense Acquisition University (DAU) Wikipedia – A corporate university of the United States Department of Defense offering “acquisition, technology, and logistics” (AT&L) training to military and Federal civilian staff and Federal contractors. DAU is headquartered in Fort Belvoir, Virginia, and is accredited by the American Council on Education (ACE), the International Association for Continuing Education and Training (IACET), and the Council on Occupational Education (COE).
  • VIDEO: CHANNEL: Defense Acquisition University Media
  • See also the DEFENSE LOGISTICS AGENCY (DLA) section.
  • See also the LOGISTIC section.
  • See also the SUPPLY section.

DEFENSE INDUSTRY

(Last Update: Monday, 13JAN2025)

DEFENSE LOGISTICS AGENCY (DLA)

(Last Update: Monday, 13JAN2025) (POC LOCATION: N4 LOGISTICS)

DENTAL

(Last Update: Monday, 18AUG2025) (POC LOCATION: MEDICAL)

DEPLOYMENT HEALTH ASSESSMENTS

(Last Update: Monday, 13JAN2025) (POC LOCATION: MEDICAL)

DEPLOYMENT SUPPORT

(Last Update: Monday, 13JAN2025)

DESTROYER

(Last Update: Thursday, 09JAN2025)

DETAILER

(Last Update: Monday, 13JAN2025) (POC LOCATION: CAREER COUNSELOR)

Navy Personnel Command > Career Management > Detailing

DETAILING MARKETPLACE ASSIGNMENT POLICY (DMAP)

(Last Update: Monday, 13JAN2025) (POC LOCATION: CAREER COUNSELOR)

Navy Personnel Command > Career Management > Detailing > Enlisted > Detailing Marketplace

  • Detailing Marketplace Assignment Policy (DMAP) – A new set of personnel policies replacing the current Sea Shore Flow policy. DMAP aims to enhance Fleet manning by rewarding Sailors in sea-intensive ratings who commit to extended sea duty. Sailors completing an initial 4-year Apprentice (E4 and below) Sea Tour, followed by a 3-year Journeyman (E5) Sea Tour (DMAP 4+3) will receive monetary and nonmonetary incentives, along with early advancement opportunities.
  • Senior Enlisted Marketplace (SEM)
  • VIDEO: DMAP Phase IV | A Discussion (23FEB2024)
  • VIDEO: CNP Requests Detailing Marketplace Assignment Policy Feedback (28APR2021)

DFAS (DEFENSE FINANCE & ACCOUNTING SERVICE)

(Last Update: Thursday, 24APR2025) (POC LOCATION: RESPAY or PSD)

DICTIONARY

(Last Update: Monday, 13JAN2025)

DISCOUNTS

(Last Update: Monday, 13JAN2025)

DJRS (DIVE JUMP REPORTING SYSTEM)

(Last Update: Monday, 13JAN2025)

DOD SAFE (DEPARTMENT OF DEFENSE SECURE ACCESS FILE EXCHANGE)

(Last Update: Monday, 13JAN2025) (POC LOCATION: N6 INFORMATION PROFESSIONAL (IP) OFFICER or INFORMATION TECHNOLOGY (IT))

DON (DEPARTMENT OF NAVY) ISSUANCES

(Last Update: Monday, 13JAN2025) (POC LOCATION: N1 ADMIN)

  • DON Issuances – View the official digital collection of unclassified instructions, publications, and manuals from SECNAV and OPNAV.

DON TRACKER (DEPARTMENT OF NAVY TASKING, RECORDS, AND CONSOLIDATED KNOWLEDGE ENTERPRISE REPOSITORY)

(Last Update: Monday, 13JAN2025)

DRONE

(Last Update: Monday, 13JAN2025)

DSCATS (DEFENSE SUPPORT OF CIVIL AUTHORITIES TRACKING SYSTEM)

(Last Update: Monday, 13JAN2025)

DTS (DEFENSE TRAVEL SYSTEM)

(Last Update: Monday, 13JAN2025) (LOCATION: N7 TRAINING or PSD)

  • DTS (Defense Travel System) (New DTS) Wikipedia – A fully integrated, electronic, end-to-end travel management system that automates temporary duty travel (TDY) for the Department of Defense. It allows travelers to create authorizations (TDY travel orders), prepare reservations, receive approvals, generate travel vouchers, and direct deposit payments to themselves and the government charge card vendor, all via a single web portal available 24 hours a day, seven days a week.
  • Let users know they MAY need to re-register their CAC. For questions, they can email the help desk at don_ccpmd_training@us.navy.mil
  • GSA City Pair Program (CPP) – Procures and manages discounted air passenger transportation services for federal government travelers.
  • VIDEO CHANNEL: Defense Travel Management Office
  • VIDEO: DTS Voucher Guide (19APR2019)
  • VIDEO: How To Create a DTS Authorization (08JUN2021)
  • VIDEO: How To Create A DTS Voucher (10JUN2021)
  • Customer Support
    • Help Accessing DTS (New Help Desk: don_ccpmd_training@us.navy.mil)
    • Travel Assistance Center (TAC) assists the Defense travel community before, during, and after official travel. A team of analysts answers questions on various travel-related topics including DTS, DoD travel cards, travel policy, commercial travel services and programs, and allowances and entitlements.
    • Travel Explorer (TraX) – A web solution that offers a centralized source of travel information. TraX functions as an extension on the TAC and allows users to submit a call center ticket, and track the progress of open tickets. Users are encouraged to explore the self-help features for instant access to hundreds of frequently asked questions, as well as discover training opportunities like DTS and GTCC and trip planning tools. Users must register for a TraX account through the Defense Travel Management Office‘s portal.
  • SATO Air Travel Expense Receipt
    • Step 1: Go to https://www.cwtsatotravel.com/home.html
      Step 2: Find “My Travel Office” on the left side of the screen
      Step 3: Choose “Civilian Govt” or “Military/Dept of Defense”
      Step 4: Type NAVY in the text box and click “Search” (The “Advanced Location Search” link
      may also be selected below the Search button of the Travel Office locator)
      Step 5: Select the appropriate office from the list of available links to be automatically directed
      to the CWT SATO webpage (selecting the incorrect office will delay processing). All
      FTS (TAR)/Active Duty personnel will select their local TMC and all Navy Reservists will
      select their ORGANISATION.
      Step 6: Select the “Itinerary/Invoice Request” box
      Step 7: Provide the required information on the form, including a government email address,
      then select “Submit”
  • See also the TRAINING section.

DWE (DRILL WEEKEND)

(Last Update: Monday, 13JAN2025)


E — “Echo”

EBENEFITS

(Last Update: Friday, 17JAN2025) (LOCATION: VA)

  • EBenefits Wikipedia – A web portal managed jointly by the United States Department of Veterans Affairs (VA) and the DoD to provide Service members, Veterans, and eligible dependents the ability to manage their VA and DoD benefits (including Post-9/11 GI Bill), claims, and military documents online.
  • VIDEO: eBenefits Shortcut & MyHealtheVet (28SEP2022)

EDM (ENHANCED for DRILL MANAGEMENT) / RESCHED

(Last Update: Friday, 17JAN2025) (LOCATION: IN ADMIN AREA – RESPAY)

EDUCATION / SCHOOL / TRAINING

(Last Update: Thursday, 27FEB2025) (POC LOCATION: N7 TRAINING)

EIWS (ENLISTED INFORMATION WARFARE SPECIALIST)

(Last Update: Friday, 17JAN2025) (POC LOCATION: ANY ENLISTED IN THE IWC Wikipedia)

  • Enlisted Information Warfare Specialist (EIWS) insignia Wikipedia – A United States Navy badge awarded to enlisted personnel who demonstrate advanced knowledge and proficiency in information warfare. This qualification recognizes Sailors who have acquired specialized skills and a deep understanding of the Information Warfare Community (IWC), enhancing their effectiveness in warfighting, mission execution, and command survivability.
  • Enlisted Information Warfare Specialist (EIWS) Study Guide
  • COMNAVIFORINST 1414.1A
  • GOOGLE: EIDWS
  • While the CPR course is required, you are not required to use the online certification. Any CPR qualification will work; however, this is the only acceptable online alternative.

ELEAVE

(Last Update: Friday, 17JAN2025) (POC LOCATION: N1 ADMIN)

  • Leave – A sailor’s sanctioned time away from duty, akin to civilians earning vacation hours through work. Sailors accumulate leave time each month (2.5 days per month or 30 days per year), which they can utilize by requesting time off from their duties. This authorized absence is charged against the individual’s leave account, allowing them to take breaks from their responsibilities as needed.
  • E-Leave (Electronic Leave) – A web-based program that Sailors can access through their Electronic Service Record (ESR). The new method allows sailors to electronically route leave chits through the chain of command for approval. It automates the command’s leave control log and ensures pay and entitlements are properly credited. NOTE: While Navy E-leave is currently accessed through NSIPS, it will soon migrate over and be accessible through My Navy Portal (CAC MNP). Help Desk: 833-637-3669 or email: nesd@nesd-mail.onbmc.mil
  • FORM: Special Request/Authorization Form (NAVPERS Form 1336/3 (Rev. 10-2011)) – A legal document used to communicate the desire for items listed in the form (leave, special liberty, commuted rations, etc.) or some other special authorization or consideration.
  • Navy E-Leave Login
  • VIDEO: How to Request Leave in the Navy (25MAY2022)
  • VIDEO: Navigating NSIPS: E-Leave Requests (17MAR2021)
  • VIDEO: Taking Navy Leave or Vacation (08SEP2016)
  • See also the ESR (ELECTRONIC SERVICE RECORD) section.
  • See also the LIBERTY section.

ELECTRONIC HEALTH ASSESSMENTS (EHA)

(Last Update: Friday, 17JAN2025) (POC LOCATION: MEDICAL)

EMAIL

(Last Update: Friday, 31JAN2025) (POC LOCATION: N6 INFORMATION PROFESSIONAL (IP) OFFICER or INFORMATION TECHNOLOGY (IT))

Disclaimer: These are all public-facing Outlook email Web Access (OWA) servers that are located in a DeMilitarized Zone (DMZ is a location between firewalls Wikipedia where most web servers are virtually located.) on a government computer network and require your CAC to access the site. So, the links will not help anyone if they do not have a CAC and an email account on that particular network.

Navy East Lock https://webmail.east.nmci.navy.milhttps://webmail.east.cloud.navy.mil
Navy West Lock https://webmail.west.nmci.navy.milhttps://webmail.west.cloud.navy.mil
Navy Office 365 Lock https://webmail.cloud.navy.mil
Navy Europe Lock https://mail.eu.navy.mil/owa
Navy Far East Lock https://mail.fe.navy.mil/owa
Navy Middle East Lock https://mail.me.navy.mil/owa
Navy Continuous Training Env (NCTE) Lock https://webmail.ncte.hpc.mil/owa
NMCI-ISF Lock https://webmail.isf.nmci.navy.mil
NADSUSEA NCIS COI (Navy NCIS) Lock https://webmail.ncis.nmci.navy.mil
NAVSOC / Navy Special Warfare Lock https://sofwebmail.socom.mil
PADS (Navy PADS) Lock https://webmail.pacom.mil
PADS (Navy PACOM SMR Users) Lock https://webmail.exceptions.pacom.mil
[X] Navy Medical Lock https://webmail.mil
DoD Mail Lock https://web.mail.mil/owa

EMERGENCY RESPONSE

(Last Update: Friday, 17JAN2025)

EMPLOYER RELATIONS

(Last Update: Friday, 17JAN2025)

ENAVFIT

(Last Update: Tuesday, 27MAY2025) (POC LOCATION: N1 ADMIN)

  • Effective 1 May 2025, eNavFit will no longer be available for Fleet use.
  • Commands should not start any evaluations or fitness reports in eNavFit after 15 March 2025 and must ensure all eNavFit performance appraisals are completed and submitted to the Performance Evaluations Division Director (PERS-32) before 15 April 2025.
  • Beginning 1 April 2025, all evaluations and fitness reports are to be completed in NAVFIT98A.
  • See NAVADMIN 012/25 for more information.
  • See also the EVAL (EVALUATION) section.
  • See also the FITREP (FITNESS REPORT) / EVAL (EVALUATION) section.

ENLISTED

(Last Update: Friday, 17JAN2025)

  • Enlisted Rate Wikipedia – The term can be inclusive of non-commissioned officers or warrant officers, except in the United States military usage, where warrant officers/chief warrant officers are a separate officer category ranking above enlisted grades and below commissioned officer grades. In most cases, enlisted service personnel perform jobs specific to their occupational specialty, as opposed to the more generalized command responsibilities of commissioned officers.
  • VIDEO: U.S. NAVY ENLISTED RATINGS (23APR2023)
  • VIDEO: Enlisted vs. Officers in the U.S. Military (What’s the difference?) (02JUN2023)
  • VIDEO: U.S. Navy Enlisted Rate & Rating Insignia (WW2) (26DEC2020)
  • Enlisted Permanent Personnel Record MILPERSMAN 1000-020 Pay and Personnel Record Maintenance Responsibilities
    • Policy
    • Records Responsibilities
    • Recall/ Mobilization Responsibilities

    MILPERSMAN 1070-080 Enlisted Permanent Personnel Record

    • Policy
    • Document Categories
    • Updating the OMPF
    • Record Correction/Change Requirements
    • Record Review/Access
    • Documents provided to Selection Boards

ENLISTED ADVANCEMENT PROFILE SHEET

(Last Update: Friday, 17JAN2025) (POC LOCATION: N1 ADMIN, CAREER COUNSELOR, ESO)

ENLISTED LEADER DEVELOPMENT (ELD)

(Last Update: Friday, 17JAN2025) (POC LOCATION: TRAINING)

ENLISTED SEPARATIONS

(Last Update: Thursday, 21MAR2024)

Navy Personnel Command > Career Management > Personnel Conduct & Sep > Enlisted Separations

ESAMS (ENTERPRISE SAFETY APPLICATION MANAGEMENT SYSTEM)

(Last Update: Wednesday, 04JUN2025) (POC LOCATION: TRAINING)

  • Enterprise Safety Applications Management System (ESAMS) – A web-based platform designed to streamline safety, occupational health, and emergency management for large organizations, particularly within the U.S. DoD, by centralizing data management and ensuring compliance with OSHA and DoD safety standards. Key features include real-time analytics, role-based access, and automated reporting, which enhance decision-making, reduce administrative burdens, and foster a proactive safety culture. By enabling supervisors, safety officers, and leadership to track incidents, analyze hazards, and monitor compliance, ESAMS supports actionable insights and continuous safety improvements across organizational levels. Help Desk at 865-693-0048
  • VIDEO: How to update audiograms in ESAMS (15MAR2023)
  • VIDEO: How to Navigate ESAMS + Driving for Life (16APR2020)
  • VIDEO: Adding ESAMS USERS (30MAR2023)

ESR (ELECTRONIC SERVICE RECORD)

(Last Update: Friday, 17JAN2025) (POC LOCATION: N1 ADMIN or CAREER COUNSELOR)

Navy Personnel Command > Record Management > Electronic Service Record (ESR)

  • ESR (Electronic Service Record) – It provides an online view and updates capability for personnel clerks and other authorized users at Personnel Support Detachments and Reserve Centers. It also provides an administrative user capability for command military personnel offices to perform updates of a member’s record, along with a member’s self-serve capability for sailors to view and perform limited updates of their data. The ESR application is available via the NSIPS (Navy Standard Integrated Personnel System) ESR Quick Start for all Sailors
  • To access or establish your “Self-Service” ESR Account, go to: https://www.nsips.navy.mil. Additional assistance can be obtained by contacting the NSIPS Helpdesk at 877-589-5991 or emailing nsipshelpdesk@navy.mil
  • Note: Commands will use the Electronic Submission Application (eSubmission) to submit the required documents to PERS-313 for inclusion into the OMPF on the date of occurrence, see MILPERSMAN 1070-111.
    • Personnel Records Review – a step-by-step inventory of your OMPF and ESR for completeness and accuracy. (Updated 02NOV2022)
  • See also the CAREER COUNSELOR section.

ETJ (ELECTRONIC TRAINING JACKET)

(Last Update: Thursday, 27FEB2025) (POC LOCATION: TRAINING)

EVAL (EVALUATION)

(Last Update: Tuesday, 26AUG2025) (POC LOCATION: N1 ADMIN)

Navy Personnel Command > Career Management > Performance Evaluation

Navy FITREP evaluation tracker

A similar tracker can be found in 1610.10H Navy Performance Evaluation System 12/1/2021.


F — “Foxtrot”

FAMILY ADVOCACY PROGRAM (FAP)

(Last Update: Saturday, 18JAN2025) (POC LOCATION: FLEET AND FAMILY SUPPORT CENTERS)

Navy Personnel Command > Support & Services > Culture & Resilience > Family Advocacy

FAMILY CARE PLAN (NPC LINK)

(Last Update: Saturday, 18JAN2025) (POC LOCATION: N1 ADMIN)

Navy Personnel Command > Support & Services > Culture & Resilience > Family Readiness > Family Care Plan

FAMILY EMPLOYMENT

(Last Update: Saturday, 18JAN2025) (POC LOCATION: FLEET AND FAMILY SUPPORT CENTERS)

Navy Personnel Command > Support & Services > Culture & Resilience > Family Readiness > Fleet Family Support

FAMILY READINESS

(Last Update: Saturday, 18JAN2025)

Navy Personnel Command > Support & Services > Culture & Resilience > Family Readiness > Fleet Family Support

FISCAL YEAR

(Last Update: Saturday, 18JAN2025) (POC LOCATION: N7 TRAINING)

Fiscal Year CalendarCalendar Year, Fiscal Year

Fiscal Year Calendar Wikipedia – A fiscal year (or financial year, or sometimes budget year) is the period used by governments for accounting and budget purposes.

VIDEO: Happy Fiscal New Year! (18SEP2023)

FITREP (FITNESS REPORT) / EVAL (EVALUATION)

(Last Update: Tuesday, 26AUG2025) (POC LOCATION: N1 ADMIN)

Navy Personnel Command > Career Management > Performance Evaluation

Navy Personnel Command > Career Management > Performance Evaluation > FITREP EVAL Reports RSCA

Navy FITREP evaluation tracker

A similar tracker can be found in 1610.10H Navy Performance Evaluation System 12/1/2021.

FLAG

(Last Update: Saturday, 18JAN2025)

Flag of the United Stats Navy

  • Flag Wikipedia – The flag of the United States Navy consists of the seal of the U.S. Department of the Navy in the center, above a yellow scroll inscribed “United States Navy” in dark blue letters, against a dark blue background.
  • First Navy Jack Wikipedia – The naval jack of the United States from 1975 to 1976 and again from 2002 to 2019. It was authorized by the U.S. Navy and was flown from the jackstaff of commissioned vessels of the U.S. Navy while moored pierside or at anchor. Since then, it has been used only as a naval jack by the oldest active warship in the U.S. Navy.
  • VIDEO: How to arrange Military flags in order for presentation (17MAR2022)
  • VIDEO: Continental Navy Jack (10OCT2017)
  • VIDEO: How to fold a U.S. flag for military funeral ceremony (29NOV2022)

FLANK SPEED (FS)

(Last Update: Saturday, 18JAN2025) (POC LOCATION: N6 INFORMATION PROFESSIONAL (IP) OFFICER or INFORMATION TECHNOLOGY (IT))

FLEET AND FAMILY SUPPORT PROGRAM (FFSP)

(Last Update: Saturday, 18JAN2025)

Navy Personnel Command > Support & Services > Culture & Resilience > Family Readiness > Fleet Family Support

FLEET ENGAGEMENT TEAM

(Last Update: Saturday, 18JAN2025) (POC LOCATION: CAREER COUNSELOR)

  • Fleet Engagement Team – Consists of professional personnel who can help sailors navigate the process. A Fleet Engagement Team Event focused on providing career counseling, designating ratings, and negotiating orders on-site.
  • EDUCATION: Education Counselor Fleet Engagement Teams who can help Sailors navigate their higher education process. These teams are based out of the Navy College Virtual Education Center (NCVEC) in Little Creek, Virginia.
  • VIDEO: Navy Personnel Command (NPC) Deploys Fleet Engagement Team (04SEP2013)
  • VIDEO: Great Green Fleet Gets Underway; NPC Fleet Engagement Team to visit San Diego (17JUL2012)

FLEET WEEK

(Last Update: Saturday, 18JAN2025) (POC LOCATION: MC or PAO)

FLTMPS (FLEET TRAINING, MANAGEMENT, AND PLANNING SYSTEM)

(Last Update: Saturday, 18JAN2025) (POC LOCATION: N7 TRAINING)

  • FLTMPS (Fleet Training, Management, and Planning System) – A flexible, Web-based system that allows approved Internet users to quickly access many of the training, manpower, and personnel reports currently available in the NTMPS system. Training Officers view and document command personnel and training information, view Fleet training requirements, and generate training management reports.
  • See also the TRAINING section.

FORCE CONNECT

(Last Update: Saturday, 18JAN2025) (POC LOCATION: N6 INFORMATION PROFESSIONAL (IP) OFFICER or INFORMATION TECHNOLOGY (IT))

FORMS

(Last Update: Saturday, 18JAN2025) (POC LOCATION: N1 ADMIN)

FRIGATE

(Last Update: Monday, 13JAN2025)

  • Frigate Wikipedia – A versatile naval warship traditionally designed as a medium-sized, fast, and maneuverable vessel capable of independent operations across multiple maritime missions. Historically evolving from sail-powered ships carrying 24-56 guns to modern multi-role combat platforms, frigates serve critical roles in naval warfare, including reconnaissance, escort, and defensive operations. In contemporary naval forces, frigates are sophisticated surface combatants equipped with advanced technological systems for anti-submarine, surface, and air defense missions, representing a crucial component of maritime strategic capabilities.
  • See also the SHIP section.

FUNERAL

(Last Update: Saturday, 18JAN2025) (POC LOCATION: N1 ADMIN)


G — “Golf”

GALLEY

(Last Update: Tuesday, 10JUN2025)

  • Galley Wikipedia – A ship’s galley is a compact, efficient kitchen tailored for cooking at sea, equipped with space-saving designs, gimbapled stoves for safety, and stainless steel for hygiene. Evolving from basic hearths in wooden ships to advanced setups, modern galleys on large vessels manage thousands of meals daily with sophisticated appliances and large crews. These kitchens ensure safe, reliable food service despite the challenges of limited space and constant ship movement.
  • Mess Cranking – The process where junior enlisted sailors (usually those at the E-3 (Seaman) rank or below) are temporarily assigned to work in the ship’s galley as Food Service Attendants (FSAs). This duty is a rite of passage for new sailors and is widely regarded as one of the toughest but most formative experiences in early Navy life.
  • VIDEO: INSIDE SEA GALLEY: USS Enterprise Aircraft Carrier Makes 17,300 MEALS A DAY (15NOV2023)

GAMECHANGER

(Last Update: Tuesday, 27MAY2025)

  • Gamechanger – An artificial intelligence (AI) and natural language processing (NLP) application developed by the Department of Defense to transform how policymakers navigate, analyze, and understand relationships across the DoD’s vast universe of tens of thousands of policies and requirements. Launched in 2020, it provides a single authoritative centralized repository that allows policymakers to efficiently search and quickly identify relevant policies, understand relationships between them, pinpoint conflicts or gaps, and analyze potential impacts of new or revised policies. Key features include intelligent keyword searching, visualizations depicting connections between documents, and continual improvement of the NLP/AI models to refine the capabilities over time.
  • Gamechager Factsheet 2024
  • GAMECHANGER: Where policy meets AI by DIA Public Affairs (07FEB2022)
  • VIDEO: Large Language Models: Game Changer – The Government Policy Repository (May 22, 2025)
  • See also the AI (ARTIFICIAL INTELLIGENCE) section.

GENERAL MILITARY TRAINING (GMT)

(Last Update: Friday, 17JAN2025) (POC LOCATION: N7 TRAINING)

GENERAL ORDERS OF A SENTRY

(Last Update: Friday, 17JAN2025)

  • General Orders of a Sentry Wikipedia – The official title of a set of rules governing sentry (guard or watch) duty in the United States Armed Forces. While any guard posting has rules that may go without saying (“Stay awake,” for instance), these orders are carefully detailed and particularly stressed in the U.S. Navy. Also known as the 11 General Orders, the list covers any scenario a sentry might encounter on duty.
  1. Take charge of this post and all government property in view.
  2. Walk my post in a military manner, keeping always on the alert and observing everything that takes place within sight or hearing.
  3. Report all violations of orders I am instructed to enforce.
  4. Repeat all calls from posts more distant from the guardhouse than my own.
  5. Quit my post only when properly relieved.
  6. Receive, obey, and pass on to the sentry who relieves me all orders from the commanding officer, officer of the deck, officers, and noncommissioned officers of the guard only.
  7. Talk to no one except in the line of duty.
  8. Give the alarm in case of fire or disorder.
  9. Call the officer of the deck in any case not covered by instructions.
  10. Salute all officers and all colors and standards not cased.
  11. Be especially watchful at night and during the time for challenging, to challenge all persons on or near my post, and allow no one to pass without proper authority.

GI BILL

(Last Update: Friday, 17JAN2025) (POC LOCATION: VA)

Career Management > Education > GI Bill

GLOBAL DIRECTORY SERVICE (GDS)

(Last Update: Sunday, 23FEB2025) (POC LOCATION: N6 INFORMATION PROFESSIONAL (IP) OFFICER or INFORMATION TECHNOLOGY (IT))

  • DoD Global Directory Service (GDS) – A Department of Defense (DoD) enterprise-wide search engine. It allows DoD personnel’s names, e-mail addresses, and DoD PKI email encryption certificates to be searchable via the web. GDS pulls information from PKI directories and Designated Data Sources (DDSs) within the Combatant Commanders/Services/Agencies (C/S/As). GDS also provides an enterprise user directory called DoD 411, where users may search and download contact records that include the contact’s public encryption certificate. This allows users to encrypt emails to DoD recipients who do not exist in their local email directory. DoD 411 is available via both HTTPS (web browser) and LDAP interfaces and can be configured as an address book within Microsoft Outlook. (Source: DoD Cyber Exchange)
  • DEAS Account Password Reset Tool
  • How to send encrypted emails using DOD-411
  • See also the COMMUNICATION section.
  • See also the EMAIL section.

GOVERNMENT TRAVEL CHARGE CARD (GTCC)

(Last Update: Friday, 17JAN2025) (POC LOCATION: N1 ADMIN or N7 TRAINING)

GROUND TRUTH

(Last Update: Friday, 17JAN2025)

  • Ground Truth Wikipedia – US military slang uses “ground truth” to refer to the facts comprising a tactical situation, as opposed to intelligence reports, mission plans, and other descriptions reflecting the conative or policy-based projections of the industrial-military complex.

H — “Hotel”

HIGH YEAR TENURE (HYT)

(Last Update: Tuesday, 14JAN2025) (POC LOCATION: N1 ADMIN and CAREER COUNSELOR)

Navy Personnel Command > Career Management > Enlisted Career Admin > High Year Tenure

HISTORY (NAVY)

(Last Update: Tuesday, 14JAN2025)

HUMAN PERFORMANCE RESOURCES BY CHAMP (HPRC)

(Last Update: Tuesday, 14JAN2025) (POC LOCATION: MEDICAL)

HUMAN RESOURCES

(Last Update: Tuesday, 14JAN2025) (POC LOCATION: N1 ADMIN, CAREER COUNSELOR, or HR OFFICER)

Navy Personnel Command > Career Management > Detailing > Pers-44 Staff-RL > Human Resources

  • Human Resources (HR) Wikipedia – The set of people who make up the workforce of an organization, business sector, industry, or economy. A narrower concept is human capital, the knowledge and skills which individuals command. Similar terms include manpower, labor, or personnel.
  • Navy Human Resources Community Reserve Component Officer Guide (NOV2013)
  • See also the ADMINISTRATIVE (ADMIN) PROCEDURES section.
  • See also the CAREER COUNSELOR section.

HUMOR

(Last Update: Tuesday, 14JAN2025)


I — “India”

ID CARD

(Last Update: Saturday, 18JAN2025) (POC LOCATION: RAPIDS SITE LOCATOR)

IDT (INACTIVE DUTY for TRAINING)

(Last Update: Saturday, 18JAN2025)

IDTT (INACTIVE DUTY for TRAINING TRAVEL)

(Last Update: Saturday, 18JAN2025) (POC LOCATION: N7 TRAINING)

INDOC (INDOCTRINATION)

(Last Update: Saturday, 18JAN2025)

  • INDOC ensures proper check-in and awareness of Navy Reserve Centers (NRC) and Reserve policies and lays the foundation and expectations for all SELRES, in addition to providing invaluable information and resources. Plan for this event accordingly.
  • In addition to the introductory briefs, Sailors are allowed to receive other mandatory trainings that are due throughout the year. All new Sailors must attend their command’s INDOC course.
  • Indoctrination (INDOC) occurs at least once a quarter at every NRC. It may fall on the day you check in, or not be planned for another couple of months.
  • All newly reported SELRES must attend INDOC within 90 days of their check-in. This includes members who are new to the Navy Reserves as well as those who are transferring from another NRC.
  • See also the ALMANAC section.
  • See also the ONBOARDING section.

INFORMATION TECHNOLOGY (IT)

(Last Update: Saturday, 18JAN2025) (POC LOCATION: N6 INFORMATION PROFESSIONAL (IP) OFFICER or INFORMATION TECHNOLOGY (IT))

INFOSEC (INFORMATION SECURITY)

(Last Update: Saturday, 18JAN2025) (POC LOCATION: N6 INFORMATION PROFESSIONAL (IP) OFFICER or INFORMATION TECHNOLOGY (IT))

INSURANCE

(Last Update: Wednesday, 15JAN2025)

  • Military insurance encompasses programs like Servicemembers’ Group Life Insurance (SGLI) and Veterans’ Group Life Insurance (VGLI), offering affordable coverage options to active-duty personnel and veterans, ensuring financial protection for themselves and their families.
    • Servicemembers’ Group Life Insurance (SGLI) Wikipedia – Active-duty service members are automatically enrolled in SGLI, which offers coverage up to $500,000 in $50,000 increments. SGLI provides 120 days of free coverage after leaving the military and can be extended for up to 2 years if disabled.
    • Veterans’ Group Life Insurance (VGLI) Wikipedia – Former service members can convert their SGLI to VGLI within 1 year and 120 days of discharge, maintaining coverage between $10,000 and $500,000. VGLI allows for coverage increases every 5 years up to age 60.

INTELLIGENCE (INTEL)

(Last Update: Saturday, 18JAN2025) (POC LOCATION: INTEL OFFICER or INTELLIGENCE SPECIALIST (IS))

IRR (INDIVIDUAL READY RESERVE)

(Last Update: Sunday, 05JAN2025) (POC LOCATION: IRR COUNSELOR)

Navy Personnel Command > Career Management > Reserve Personnel Mgmt > IRR

IRR (Individual Ready Reserve) – The Navy Reserve Forces Command manages this. This command operates under the overall leadership of the Navy Reserve.
The IRR is a component of the Navy Reserve and consists of two main groups (GRAPHIC):
* Active Status Pool (ASP): This includes individuals who have had training and previously served in the active force or Selected Reserve (SELRES) but are now serving in a non-pay, non-drill status.
* Voluntary Training Unit (VTU): Members of the VTU participate in monthly drills for retirement credit but are not paid.
The Navy IRR serves as a crucial mobilization asset, with members subject to recall to active duty in the event of a national emergency or contingency. The management of IRR members involves maintaining up-to-date contact information, civilian employment information, and ensuring members are aware of their obligations and available benefits.

Contact: IRR counselor at 1-800-535-2699, or email irr_counselor@navy.mil. Available Monday–Friday, 0800-1600 (CST).

ITP (INDIVIDUAL TRAINING PLAN)

(Last Update: Saturday, 18JAN2025) (POC LOCATION: CAREER COUNSELOR and N7 TRAINING)

  • ITP (Individual Training Plan) – A personalized framework designed to guide sailors’ career development, align training with operational readiness, and ensure billet-specific requirements are met. Tailored to each sailor, the ITP includes assigned duties, career goals, training requirements, and timelines for achieving milestones. The plan is regularly updated by unit leadership and tracked through systems like T-Ready, ensuring sailors remain on track for both immediate duties and long-term career progression.
  • See also the T-READY section.

J — “Juliett

JOAPPLY (JUNIOR OFFICER APPLY) (RESERVE FORCE MANPOWER TOOLS (RFMT))

(Last Update: Friday, 06JUN2025) (POC LOCATION: O1-O4 OFFICERS)

NOTE: Remember to login before starting the research…

  • Reserve Force Manpower Tools (RFMT) – A system for billet assignments.
  • Junior Officer APPLY (JOAPPLY) – Integrated within the Reserve Force Manpower Tools (RFMT) platform, enables Navy Reserve junior officers (O-4 and below) to apply for billet assignments through a quarterly cycle accessible via the Navy Reserve Homeport. Officers can browse and prioritize up to seven billets per cycle, with selections made by assignment coordinators, while non-participation may result in transfer to the Volunteer Training Unit or Individual Ready Reserve. To optimize success, officers should log into RFMT, review the Quickguide, submit applications before deadlines, and consult assignment coordinators for guidance.
  • VIDEO: Navigating Junior Officer Apply (04APR2020)

JOINT KNOWLEDGE ONLINE (JKO)

(Last Update: Friday, 06JUN2025) (POC LOCATION: CAREER COUNSELOR)

  • Joint Knowledge Online (JKO) – Managed by the Joint Staff J-7, is the DoD’s official online learning platform, providing 24/7 access to thousands of courses to enhance joint operation proficiency for military, DoD civilians, and select partners. JKO offers self-paced, multimedia-rich courses, virtual classrooms, and progress tracking through its user-friendly Learning Management System. To maximize benefits, users should register, explore role-specific training, monitor progress via the LMS dashboard, and utilize JKO’s 24/7 help desk for support.
  • VIDEO: JKO – Joint Knowledge Online (08JUN2022)
  • See also the CAREER COUNSELOR section.
  • See also the TRAINING section.

JOINT QUALIFICATION SYSTEM (JQS)

(Last Update: Friday, 06JUN2025) (POC LOCATION: CAREER COUNSELOR)

Navy Personnel Command > Career Management > Detailing > Officer > Joint > Joint Quals

  • Joint Qualification System (JQS) – Established under the Goldwater-Nichols Act of 1986, is a DoD framework that develops and credentials military officers in joint matters for senior leadership roles. Officers progress through four qualification levels by completing Joint Professional Military Education (JPME) and earning points through Standard Joint Duty Assignments (SJDA), Experience-based Joint Duty Assignments (E-JDA), or a combination, tracked via the JQS portal. To optimize career advancement, officers should prioritize early JPME completion, seek joint assignments, and actively manage their progress through the JQS portal.

JOINT SERVICES TRANSCRIPT (JST)

(Last Update: Monday, 13JAN2025) (POC LOCATION: CAREER COUNSELOR and N7 TRAINING)

  • Joint Service Transcript (JST/SMART), formerly SMART documents the number of potential college credits the American Council on Education (ACE) recommends for formal military training and occupational experience. The primary purpose of the JST/SMART is to assist service members in obtaining college credit for their military experience.
  • Joint Services Transcript (JST) includes how to read the document, what it contains, and how to contact JST for various issues. (Reference: Navy College Program)
  • VIDEO: Joint Service Transcript Tutorial (18NOV2020)
  • See also the CAREER COUNSELOR section.
  • See also the EDUCATION / SCHOOL / TRAINING section.
  • See also the TRAINING section.

JOHN PAUL JONES

(Last Update: Thursday, 24APR2025)

JPME (JOINT PROFESSIONAL MILITARY EDUCATION)

(Last Update: Monday, 13JAN2025) (POC LOCATION: O3-O5 OFFICERS)

Navy Personnel Command > Career Management > Detailing > Officer > Joint > JPME


K — “Kilo”

KNIFE

(Last Update: Monday, 03OCT2025)


L — “Lima”

LAW

(Last Update: Friday, 06JUN2025) (POC LOCATION: JAG or LN)

  • Military Law Wikipedia -A distinct legal system that governs the conduct of service members, operating under the framework of the Uniform Code of Military Justice (UCMJ). It is designed to uphold military discipline by addressing both unique military infractions and standard criminal offenses through its court-martial process. This legal code applies continuously to all military personnel, including active, reserve, and retired members, regardless of their on or off-duty status.
  • United States Code (USC) – Title 10 – Armed Forces
  • History of U.S. Military Policy – Evolution of U.S. Military Policy, 1775-Present (Source: Rand)
  • See also the UNIFORM CODE OF MILITARY JUSTICE (UCMJ) section.

LEADERSHIP

(Last Update: Sunday, 19JAN2025) (POC LOCATION: OFFICERS)

LDO (LIMITED DUTY OFFICER) / CWO (CHIEF WARRANT OFFICER)

(Last Update: Sunday, 19JAN2025) (POC LOCATION: CWO / LDO OFFICERS)

Navy Personnel Command > Career Management > Community Management > Officer > Active OCM > LDO CWO

Navy Personnel Command > Career Management > Boards > Administrative > LDO/CWO

LEAVE

(Last Update: Sunday, 19JAN2025) (POC LOCATION: ADMIN)

LEGAL

(Last Update: Sunday, 19JAN2025) (POC LOCATION: JAG or LN)

LES (LEAVE AND EARNINGS STATEMENT)

(Last Update: Thursday, 24APR2025) (POC LOCATION: RESPAY or PSD)

Navy Personnel Command > References > Pay & Benefits

LIBERTY

(Last Update: Monday, 13JAN2025) (POC LOCATION: ADMIN)

  • Liberty (Liberty Call) – A sailor’s sanctioned break from duty, offering respite from the usual working environment. It’s typically granted on weekends and holidays, allowing personnel some time off. This authorized absence isn’t counted as leave and is available after regular working hours. Additionally, special liberty may be given for emergencies, religious observances, or as a reward for exceptional performance.
  • FORM: Special Request/Authorization Form (NAVPERS Form 1336/3 (Rev. 10-2011)) – A legal document used to communicate the desire for items listed in the form (leave, special liberty, commuted rations, etc.) or some other special authorization or consideration.

LIBRARY

(Last Update: Sunday, 19JAN2025)

LIFE INSURANCE

(Last Update: Sunday, 19JAN2025) (POC LOCATION: N1 ADMIN)

LINEAL / PRECEDENCE NUMBER

(Last Update: Sunday, 19JAN2025) (POC LOCATION: OFFICERS)

  • Navy lineal and precedence numbers establish an officer’s seniority and position on the Active Duty or Reserve Active Status Lists, critical for promotions and hierarchy. These numbers are determined by rank, date of rank, and other factors like academy or training performance. Officers can find their assigned numbers on official Navy platforms such as MyNavy Portal or BUPERS Online.
  • Get in Line (Source: AUSN/NRA CAPT (Ret) G. Mark Hardy)
  • Naval Register – The register Number (xxxxxxxx) assigned is the number that indicates the officer’s relative seniority on the Active-Duty Lists or the Reserve Active Status List. The Active-Duty List register number is the lineal number. The Reserve Active-Status list register number is the precedence number.
    • Lineal and precedence numbers are assigned per SECNAVINST 1427.2 according to seniority.
    • Training and Administration of the Reserve (TAR) officers are assigned both lineal numbers and precedence numbers.
    • Officers on the Retired and the Inactive-Status Lists are not assigned register numbers.
  • Selection Boards Information
  • VIDEO: How to find your lineal number (29JAN2022)
  • VIDEO: Board Life: Officer Boards – How does the NAVY’s Officer Promotion Board process work? | Navy Personnel Command (28SEP2021)

LOG

(Last Update: Sunday, 19JAN2025)

LOGISTIC

(Last Update: Wednesday, 04JUN2025)

  • Military logistics Wikipedia – The discipline of planning and carrying out the movement, supply, and maintenance ofMilitary logistics is the discipline of planning and carrying out the movement, supply, and maintenance of military forces. In its most comprehensive sense, it is those aspects or military operations that deal with:
    • Design, development, acquisition, storage, distribution, maintenance, evacuation, and disposition of materiel.
    • Transport of personnel.
    • Acquisition or construction, maintenance, operation, and disposition of facilities.
    • Acquisition or furnishing of services.
    • Medical and health service support.
  • Single Mobility System (SMS) – A web-based computer system that provides visibility of air, sea, and land transportation assets and provides aggregated reporting of cargo and passenger movements. SMS does this by collecting plane, ship, and truck movement data from other computer systems such as IGC, CAMPS, GDSS, JALIS, DTTS, and ANGMU.
  • VIDEO: Inside US Navy’s Fastest Ships Transporting Billion $ Worth of Military Hardware (23OCT2024)
  • VIDEO: Naval Logistics – Keeping your fleet in fuel, food and guns (25NOV2020)
  • See also the DEFENSE LOGISTICS AGENCY (DLA) section.
  • See also the SUPPLY section.

M — “Mike”

MA (MASTER-AT-ARMS)

(Last Update: Wednesday, 21MAY2025) (POC LOCATION: SECURITY)

  • Master-at-Arms (MA) Wikipedia – Serves as the Navy’s police force, ensuring safety and enforcing regulations on ships and bases through law enforcement, security, and anti-terrorism efforts. Their diverse responsibilities include patrolling, investigating crimes, protecting personnel and property, and sometimes involve K-9 operations or deployments to high-threat areas. Becoming an MA requires enlisting in the Navy, completing basic training, and attending specialized “A” School, making them crucial for maintaining order and security within the Navy.
  • Defense Homeland and Readiness Training (DHART) – System used by Navy Security Force personnel at Commander, Navy Installations Command (CNIC) units to manage, document, and ensure compliance for all required training and qualifications, ultimately enhancing readiness for critical security missions.
  • VIDEO: The Truth About U.S. Navy Master At Arms (13JAN2024)
  • VIDEO: Navy Master-at-Arms – MA (16AUG2018)
  • VIDEO: U.S. Navy Master at Arms “A” School | The Complete Guide (04AUG2023)

MAC

(Last Update: Sunday, 12JAN2025) (POC LOCATION: N6 IT)

MANPOWER (places)

(Last Update: Sunday, 12JAN2025) (POC LOCATION: N1 ADMIN)

MARITIME

(Last Update: Thursday, 15MAY2025)

  • Maritime History Wikipedia – A multidisciplinary study of human interactions with the sea, encompassing a global perspective on activities like shipping, navigation, trade, and naval history, while also exploring related fields such as oceanography, maritime law, and the cultural impact of seafaring communities.
  • MarineTraffic – Provides global ship tracking intelligence through a live map and a database of over 550,000 active and decommissioned vessels, allowing users to discover vessel positions and port locations in near real-time.

MAS (MANPOWER AVAILABILITY STATUS) CODE

(Last Update: Sunday, 12JAN2025) (POC LOCATION: N1 ADMIN)

  • Manpower Availability Status (MAS) Code (23MAR2020) – This is used to assist in determining and tracking the pre-mobilization administrative and medical status of Selected Reservists.
  • Decoder for US Navy app – android and ios it has the AMD, Enlisted Rating Codes (NEC), IMS Codes, MAS Codes, Navy Reserve Activity (NRA) Codes, NOBC Codes (Subspecialty Codes), Officer Billet Codes, Officer Designators, Officer Paygrade Codes, RBSC Billet Codes, Reserve Program Codes, Reserve Unit Identification Codes (UIC), RFAS Codes, RUAD, and other valuable items.
  • Quick Reference to MAS Codes
  • RESPERSMAN 3060-010
  • See also the MOB (MOBILIZATION) section.

MEDICAL

(Last Update: Monday, 15SEP2025) (POC LOCATION: MEDICAL)

  • The Reserve Sailors who complete medical requirements on time each year are the ones who stop by and talk with their medical representatives regularly. An ongoing conversation about upcoming requirements enables sailors to stay ahead of deficiency lists for mandatory tasks, such as immunizations and blood draws.
  • The top two requirements:
    • Complete your annual Electronic Periodic Health Assessment (ePHA)
    • Complete an annual dental exam.
  • PHA (Physical Health Assessment) (via (ePHA) (Old Link)) – A scheduled physical examination that provides medical information and documentation to Commander Navy Reserve Forces Command (COMNAVRESFORCOM) N14 to determine physical qualification for retention in the Navy Reserve and mobilization readiness.
  • Temporarily Not Physically Qualified (TNPQ): This status is assigned to Sailors who have an illness or injury of a limited duration (6 months or less) and are determined by the Medical department to fully recover. This status allows members to maintain their billet within their unit during their recovery period.
  • Medical Retention Review (MRR): This status is assigned to Sailors to provide disposition of an illness or injury that will affect the ability of the Sailor to perform within the Navy Reserve.
  • NOTE: Sailors with overdue medical requirements are not physically qualified to perform Annual Training (AT), Active Duty training (ADT), or Active Duty Operational Support (ADOS – formerly Active Duty for Special Work (ADSW)). These sailors’ orders will be put on a hard hold status until ALL medical/dental readiness components have been completed and the Sailor is determined to be medically ready.
  • Medical Record – [] Verify the next ePHA Due Date
  • Dental Record – [] Verify the next Dental Exam Due Date
  • IMR (Individual Medical Readiness) status online: Application that displays medical info in a report card format. It contains the Physical Health Assessments (PHA), laboratory results, dental readiness, and any medical conditions that may prohibit or limit deployment and post-deployment health assessments. It also shows when immunizations should be administered and when upcoming assessments should be completed.
  • VIDEO: OPNAVINST 6100 3A Deployment Health Assessment Process (20FEB2017)
  • MRRS (Medical Readiness Reporting System) (Old) Help Desk: 800-537-4617
  • EDHA (Electronic Deployment Health Assessment) (via (eHA) (Old Link))
  • If you are a member of the Reserve Component, to complete this Assessment, you must contact the PDHRA CALL CENTER for a health care provider review: 888-PDHRA-99. Quick Reference Guide.
    • The compliance timeframe for each Deployment Health Assessment is:
      • DD 2795 Pre-Deployment Health Assessment (Pre-Deployment)
        To be completed no earlier than 120 days before the start of deployment
      • DD 2796 Post-Deployment Health Assessment (Post-Deployment)
        To be completed between 30 days before and 30 days after return from deployment
      • DD 2900 Post Deployment Re-Assessment (PDHRA) (Post Deployment Reassessment)
        To be completed between 90-180 days after returning from deployment
      • DD 2978 Deployed Mental Health Assessment (DMHA)
        Two surveys are to be completed between 181-545 days and 546-910 days after returning from deployment
      • Tactical Combat Casualty Care (TCCC or TC3) Training Wikipedia – Guidelines for trauma life support in prehospital combat medicine, designed to reduce preventable deaths while maintaining operational success.
  • Tricare Wikipedia – Tricare (styled TRICARE), formerly known as the Civilian Health and Medical Program of the Uniformed Services (CHAMPUS), was a United States Department of Defense Military Health System health program. Tricare provided civilian health benefits for U.S Armed Forces military personnel, military retirees, and their dependents, including some members of the Reserve Component.USNS BETHESDA
  • NEWS: Navy’s newest medical ship will bear a familiar hospital name (10JAN2024)
  • VIDEO: Which is better, VA Health Care or TRICARE | VA Health Care and TRICARE Comparison (12AUG2022)
  • DS Logon
  • VIDEO: EXPLORE the WORLD’S LARGEST Floating Hospital Ship: USNS Mercy! (19DEC2024)
  • VIDEO: Navy Medicine Training Support Center (NMTSC) (18JAN2024)
  • VIDEO: See what happens aboard the hospital ship USNS Comfort (18NOV2020)
  • See also the HUMAN PERFORMANCE RESOURCES BY CHAMP (HPRC) section.
  • See also the MHS GENESIS PATIENT PORTAL section.

MEDICAL PERSONNEL

(Last Update: Monday, 18AUG2025) (POC LOCATION: MEDICAL)

Navy Personnel Command > Career Management > Community Management > Officer > Reserve OCM > Selected Reservists > RC Medical

Navy Personnel Command > Career Management > Community Management > Enlisted > Medical

MENTAL HEALTH

(Last Update: Sunday, 12JAN2025) (POC LOCATION: CHAPLAIN RELIGIOUS PROGRAM SPECIALIST (RP), or MEDICAL)

Navy Personnel Command > Support & Services > Culture & Resilience > Leaders Toolkit > Mental Health Playbook

  • Mental Health Wikipedia – Encompasses emotional, psychological, and social well-being, influencing cognition, perception, and behavior. According to the World Health Organization (WHO), it is a “state of well-being in which the individual realizes his or her abilities, can cope with the normal stresses of life, can work productively and fruitfully, and can contribute to his or her community”. It likewise determines how an individual handles stress, interpersonal relationships, and decision-making.
  • Navy’s Mental Health Playbook (July 2023) – Provides comprehensive resources and guidance to promote mental wellness, prevent suicide, and support Sailors and their families in addressing mental health issues through various strategies and tools.
  • Self-Initiated referral process for mental health evaluations of service members – the Brandon Act (NAVADMIN 166/23 27JUL2023)
  • RESOURCE: Mental Health | Military OneSource
  • CHATBOT: Mindsum Bot – A UK-based non-profit AI chatbot that provides evidence-based mental health information and guidance using Cognitive Behavioral Therapy (CBT), Interpersonal Therapy (IPT), and Dialectical Behavior Therapy (DBT) techniques.
  • VIDEO: How the Navy is taking steps to address service members’ mental health (26DEC2023)
  • VIDEO: We’re In This Together – Importance of Mental Health (31DEC2019)
  • VIDEO: What Are Elite Athletes Teaching Us About Mental Health? | Day 4 of The Game Inside The Games (29JUL2024)

MENTORSHIP

(Last Update: Saturday, 17MAY2025)

  • Aviation Mentoring Network (AMN) – Empower Reserve Naval Aviation members and Navy Reserve members from all communities to grow personally and professionally through a culture of mentorship guided by senior aviation leaders. How to Join:
    • Join us on Flank Speed:
      • Log into Flank Speed Teams
      • Click the “+” symbol to “Create and Join Teams and Channels.”
      • Select “Join a Team” and enter Join Code: 84mgwfa.
  • Navy Reserve CareerCompass – A mentor is a trusted counselor or guide who is involved in the development and support of one who is less experienced. A Mentee is a more junior person being mentored. The Mentor/Mentee relationship will remain professional at all times so as not to create a perception of favoritism or fraternization. The act of mentoring focuses on the Mentee and the Mentee’s personal and career goals. Both work together to set career goals and address any questions, big or small, that the Mentee may have about the Navy Reserve. Mentors are E6–E9, LDOs and CWOs, and O4–O6 members. VIDEOS
  • Career Compass Resource Center
  • Facebook: CareerCompass by Navy Reserve Mentorship Network
  • Navy Reserve Mentorship Network (NRMN) One Page Flyer SEP2016
  • Navy Reserve Mentorship Network Handbook – Overview of the NRMN Program
  • VIDEO: Mentorship in the Navy (31JUL2022)
  • VIDEO: Mentorship in the United States Navy (16APR2021)

See also the MOB (MOBILIZATION) section.

  • WELCOME TO THE NAVY RESERVE

• Leading in an all-volunteer, professional force – See also the ADMINISTRATIVE (ADMIN) PROCEDURES section.
• Different types of orders/drills (e.g. IDTs, ATPs, RMPs, IDTT, AT, ADT, ADOS) – See also the TEMPORARY DUTY/RECALL section.
• Drilling at a Navy Reserve Center (NRC) (NRC Locations) vs. supported command (pros and cons)
• Ethics in the Reserves (i.e., Line of Duty timing, Conflicts of Interest with a day job)
See also the MOB (MOBILIZATION) section.

  • NEW CO / OIC/NOSC Department Head / XO / Unit LCPO

• CO Preparation
• Diversity (how to be intentionally inclusive along various vectors of diversity
• Writing EVAL/FITREPS with impact – See also the FITREP (FITNESS REPORT) / EVAL (EVALUATION) section.
• NAVFIT – tips and how to use – See also the FITREP (FITNESS REPORT) / EVAL (EVALUATION) section.
NRRM (Navy Reserve Readiness Module) Helpdesk: NRRM-Support@innovasi.com or 619-647-3177 – See also the NRRM (NAVY RESERVE READINESS MODULE) section.
• Awards – See also the AWARDS section.

MEPS (MILITARY ENTRANCE PROCESSING STATIONS)

(Last Update: Tuesday, 02SEP2025)

  • United States Military Entrance Processing Command (USMEPCOM) Wikipedia – A DoD command that oversees 65 MEPS stations across the nation to screen and process enlisted recruits for the Armed Forces through rigorous tests like the ASVAB, medical exams, and background checks, serving as “Freedom’s Front Door” to military careers while also handling select officer candidates without prior service.
  • Military Entrance Processing details information.

MHS GENESIS PATIENT PORTAL

(Last Update: Monday, 18AUG2025)

MID-TERM COUNSELING

(Last Update: Sunday, 12JAN2025)

Navy Personnel Command > Career Management > Performance Evaluation > MidTerm_Counseling

MILCONNECT

(Last Update: Sunday, 12JAN2025)

MILITARY CHILD CARE

(Last Update: Sunday, 12JAN2025)

MILITARY ONESOURCE

(Last Update: Sunday, 12JAN2025)

  • Military OneSource Wikipedia – A US DoD program that provides resources and support to active-duty and Guard and Reserve service members and their families anywhere in the world. The program is available 24 hours a day, 7 days a week at no cost to users.
  • Confidential non-medical counseling is available to service members and families can call 800-342-9647.
  • VIDEO CHANNEL: Military OneSource
  • VIDEO: My Military OneSource Virtual Tour (18NOV2020)

MILITARY SPOUSES RESIDENCY RELIEF ACT (MSRRA)

(Last Update: Sunday, 12JAN2025) (POC LOCATION: N1 ADMIN)

MOB (MOBILIZATION OR AUGMENTATION )

(Last Update: Sunday, 12JAN2025) (POC LOCATION: N1 ADMIN)

Navy Personnel Command > Career Management > Detailing > Augmentation > IA Guidance

Navy Personnel Command > Career Management > Detailing > Augmentation > IA Guidance > Mobilization Law Policy

Navy Manpower Augmentation Guide (OPNAVINST 3060.7C) 17AUG2018

1. Pre-Deployment
2. Man / Train / Equip
    • OLD: ECRC (Expeditionary Combat Readiness Center) Wikipedia Disestablishment of ECRC, which transferred to the Navy Reserve Forces Command (CNRFC) in January 2022.
    • NEW: Mobilization and Deployment Support Command (MDSC) oversees Navy Reserve mobilizations and Active Component Individual Augmentee (IA) mobilizations, embracing Adaptive Mobilization for rapid, agile responses, enhancing readiness for strategic competition and multi-domain warfare. It replaces the ECRC, emphasizing decentralization [Source].
      • Navy Individual Augmentee Combat Training (NIACT) – Under the “Training” tab
3. Boots on Ground (BOG)
4. Re-Deployment / Demobilization

See also the DEPLOYMENT SUPPORT section.

1st MOB – LT Beamsley – August 2009-December 2009 > LCDR Beamsley – January 2010-September 2010

2nd MOB – LCDR Beamsley – April 2012 – August 2013

MONTGOMERY GI BILL-SELECTED RESERVE (MGIB-SR)

(Last Update: Sunday, 12JAN2025) (POC LOCATION: VA)

MOTORCYCLE SAFETY

(Last Update: Monday, 09JUN2025

  • Navy’s Motorcycle Safety Program – Mandates comprehensive training for all military riders, requiring Level I training before riding and refresher courses every five years, while civilians must comply with base registration and safety gear rules. Essential personal protective equipment includes DOT or UNECE-compliant helmets and high-visibility gear, with commands responsible for maintaining training records and fostering a safety culture through mentorship and regular briefs. These measures, supported by success stories of zero accidents, enhance rider safety, morale, and operational readiness across Navy installations.
  • VIDEO: Navy Region Mid-Atlantic Motorcycle Safety Courses (10AUG2017)

MOVIE

(Last Update: Thursday, 24APR2025

MPT&E (MANPOWER, PERSONNEL, TRAINING & EDUCATION)

(Last Update: Sunday, 12JAN2025)

Navy reserve information resourceMPT&E (Manpower, Personnel, Training & Education) – The organizational framework responsible for managing the human resources aspect within the Navy. It encompasses the processes and systems of recruiting, training, retaining, and developing personnel. MPT&E focuses on optimizing manpower utilization, ensuring personnel readiness through effective training programs, and providing continuous educational opportunities for Navy personnel. This comprehensive approach aims to maintain a skilled and capable workforce capable of meeting the Navy’s operational needs now and in the future.

 

MURDER BOARD

(Last Update: Sunday, 12JAN2025)

  • Murder Board Wikipedia – Etymology: Of US military origin. Murder refers to a group of crows. Petty Officers in the US Navy have a bird on their rank insignia commonly referred to as a “crow”, and the petty officers are sometimes called crows. A murder board is when a junior sailor goes through a rigorous questioning session by a group of more experienced petty officers (crows, or a murder) to prepare them for a further oral examination conducted by higher-ranked military personnel to attain a professional qualification or some other purpose.

MUSEUMS (NAVY)

(Last Update: Sunday, 12JAN2025)

MUSIC

(Last Update: Sunday, 12JAN2025)

MUSTANG

(Last Update: Sunday, 12JAN2025)

MUSTER

(Last Update: Sunday, 12JAN2025)

  • Muster – The term sailors is used interchangeably for meeting and roll call.

MYPAY

(Last Update: Thursday, 24APR2025) (POC LOCATION: RESPAY or PSD)

Navy Personnel Command > References > Pay & Benefits

MYNAVY ASSIGNMENT (MNA)

(Last Update: Sunday, 12JAN2025) (POC LOCATION: CAREER COUNSELOR)

Navy Personnel Command > Career Management > Detailing > MyNavy Assignment

MY NAVY CENTER (MNCC)

(Last Update: Sunday, 12JAN2025)

Navy Personnel Command > Support & Services > MyNavy Career Center

  • MyNavy Career Center (MNCC) – Year-round 24/7 HR services delivery system. This NPC service answers questions about pay, personnel, and career needs (For example, LETTERS TO THE BOARD (LTB)). Customer Service: 833-330-6622, askmncc@navy.mil, or MNCC Chat green bubble on the bottom right-hand side of the page.
  • Top Reasons to Call MNCC
    • Electronic Service Record Inquiries and Submissions
    • Selection Board Correspondence
    • Pay/Travel Claim Inquiries
    • Written Employment Verification
    • CPPA Support (VIDEO)
    • electronic Personnel Action Request (ePAR)/1306 (VIDEO)
    • Records Management
    • Reserve Retirement Processing
    • General Inquiries
    • Voluntary Education Support
    • NFAAS Muster Support
  • VIDEO CHANNEL: Navy Personnel Command
  • VIDEO: MyNavy Career Center | askmncc@navy.mil | 833.330.MNCC (24SEP2018)
  • VIDEO: MyNavy HR MNCC Full Film (11MAR2020)

MYNAVY EDUCATION

(Last Update: Sunday, 12JAN2025) (POC LOCATION: CAREER COUNSELOR and N7 TRAINING)

MYNAVY HR

(Last Update: Sunday, 12JAN2025) (POC LOCATION: N1 ADMIN)

  • MyNavy HR (MNHR) – Read official policy messages (NAVADMIN), link to Career Development Symposium (CDS) resources, and view career information for Officers and Enlisted, including Selection Board Review, Detailing, Community Management, Performance Evaluation, 21st Century Sailor, and Navy Career Tools.
  • Sailor to Sailor – The Official Newsletter of MyNavy HR, is dedicated to ensuring Sailors have the most up-to-date information about Personnel, Pay, Education, Training, Retention, and MyNavy HR transformation.
  • VIDEO CHANNEL: MyNavy HR
  • See also the NEWS section.

MY NAVY PORTAL (MNP)

(Last Update: Sunday, 12JAN2025) (POC LOCATION: HR)

  • My Navy Portal (CAC MNP) | STATUS | (MNP Help Desk: 833-637-3669 or need@nesd-mail.onbmc.mil) (formerly Navy Knowledge Online – NKO) – A single point of entry for Sailors to manage their careers within an intuitive, self-service human resources (HR) environment. The portal is a key component of MyNavy Career Center (MNCC), an HR service delivery model that ensures the web-based, self-service capabilities of MNP are matched with 24/7 customer service support and access to subject matter experts who handle unique and complex situations.
  • What is My Navy Portal?
  • My Navy Portal (MNP) Quick Tour (June 2021)
  • VIDEO: My Navy Portal (02APR2018)
  • VIDEO: My Navy Portal CAC Problems (14NOV2019)(aka 46+ times to get on MNP) (Kb Note: This is exactly why I made this website to help people… Try 7 times then restart the computer, check the STATUS then try again… If that does not work, contact the Help Desk)
    1. My Navy Portal (CAC MNP) – A system organized around 11 Career & Life Event (CLE) categories encompassing the most common personnel, training, and education tasks Sailors perform throughout their careers.
    2. New to the Navy – See information on A Schools and C Schools and reporting to your first command.
    3. Advancement & Promotion – Verify eligibility for advancement, prepare for the advancement exam, and selection board review.
    4. Assignment / Leave / Travel – Link to official Navy systems to negotiate orders, submit job applications, negotiate with detailers, understand and execute military travel, and execute a PCS transfer.
      NOTE: The assignment section has introductory content in the initial release.
    5. Career Continuation – View CWAY information and see the Career Development Board and reenlistment resources.
    6. Collateral Duty – See information on Command programs.
    7. Deployment – Prepare for deployment, complete required training, understand and manage operational stress, and return from deployment.
    8. Pay & Benefits – Access myPay and understand military pay and benefits.
    9. Performance – See PRT scores, fill out and print PARFQ, track FEP progress, and learn how to establish and maintain physical readiness.
    10. Sailor & Family Support – View information, help, and assistance available for Sailors and their families.
    11. Retirement & Separation – Request separation and transfer to Fleet Reserve or retirement, and schedule and complete tasks required for transition.
    12. Training / Education / Qualifications – View information on formal training; information on licenses, certifications, qualifications, education programs, military colleges and universities, and preparing for college.

NAVY RESERVE HOMEPORT (NRH)

(Last Update: Sunday, 12JAN2025)


N — “November”

NATIONAL PERSONNEL RECORDS CENTER (NPRC)

(Last Update: Friday, 10JAN2025) (POC LOCATION: N1 ADMIN)

NATIONAL SECURITY STRATEGIC FRAMEWORK

(Last Update: Friday, 10JAN2025)

NAUTILUS VIRTUAL DESKTOP (NVD)

(Last Update: Sunday, 27APR2025) (POC LOCATION: N6 IT)

NAVADMIN (NAVY ADMINISTRATIVE)

(Last Update: Friday, 10JAN2025) (POC LOCATION: N1 ADMIN)

Navy Personnel Command > References > Messages

  • ALNAVs – Messages directed to all Navy units and Marine Corps
  • NAVADMINs – Navy-specific administrative messages

NAVAL AIR SYSTEMS COMMAND (NAVAIR)

(Last Update: Friday, 10JAN2025)

NAVAL AIR TECHNICAL DATA AND ENGINEERING SERVICES COMMAND (NATEC)

(Last Update: Friday, 10JAN2025)

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND (NAVFAC)

(Last Update: Friday, 10JAN2025)

NAVAL INFORMATION WARFARE SYSTEMS COMMAND (NAVWAR)

(Last Update: Friday, 10JAN2025)

  • Naval Information Warfare Systems Command (NAVWARSYSCOM) Wikipedia – The Navy’s technical authority and acquisition command for C4ISR (Command, Control, Communications, Computers, Intelligence, Surveillance, and Reconnaissance), business information technology, and space systems. In June 2019, the Space and Naval Warfare (SPAWAR) Systems Command was renamed the Naval Information Warfare (NAVWAR) Systems Command.
    • NAVWARSYSCOM supports over 150 programs managed by the Program Executive Office (PEO) for Command, Control, Communications, Computers, and Intelligence (C4I), as well as the programs of PEO for Enterprise Information Systems (PEO EIS) and PEO Space Systems. These PEOs are located in the greater Washington, D.C. area. The Naval Information Warfare Center (NIWC) Atlantic is located in Charleston, SC, and includes facilities in Norfolk, VA, New Orleans, and Stuttgart, Germany. NIWC Pacific is located in San Diego and includes facilities in Japan, Guam, and Hawaii.
  • VIDEO CHANNEL: Naval Information Warfare Systems Command – NAVWAR
  • VIDEO: SPAWAR Capabilities (11JUN2010)

NAVAL LEADERSHIP AND ETHICS CENTER (NLEC)

(Last Update: Friday, 10JAN2025)

NAVAL POSTGRADUATE SCHOOL (NPS)

(Last Update: Friday, 10JAN2025) (POC LOCATION: CAREER COUNSELOR and N7 TRAINING)

  • Naval Postgraduate School (NPS) Wikipedia – A public graduate school operated by the United States Navy and located in Monterey, California. It offers master’s and doctoral degrees in more than 70 fields of study to the U.S. Armed Forces, DoD civilians, and international partners. Established in 1909, the school also offers research fellowship opportunities at the postdoctoral level through the National Academies’ National Research Council research associateship program.
  • VIDEO CHANNEL: Naval Postgraduate School
  • VIDEO: Welcome to the Naval Postgraduate School (17APR2017)
  • VIDEO: NPS Video (04SEP2014)

NAVAL SAFETY COMMAND (NAVSAFECOM)

(Last Update: Friday, 10JAN2025)

  • Naval Safety Command (NAVSAFECOM) Wikipedia – The Naval Safety Command (NAVSAFECOM) is an echelon II command. Its purpose encompasses overseeing safety programs across aviation, surface ships, submarines, and shore activities, aiming to enhance combat readiness, preserve resources, and prevent mishaps within the Navy and Marine Corps. NAVSAFECOM’s structure includes four directorates, six departments, and five special staff divisions, alongside oversight of Echelon III commands, ensuring comprehensive safety management throughout naval operations.
  • VIDEO: Naval Safety Command Establishment (04FEB2022)
  • See also the DJRS (DIVE JUMP REPORTING SYSTEM) section.

NAVAL SEA SYSTEMS COMMAND (NAVSEA)

(Last Update: Friday, 10JAN2025)

  • Naval Sea Systems Command (NAVSEA) Wikipedia – The primary objective is to engineer, build, buy, and maintain the U.S. Navy’s fleet of ships and its combat systems.
    • The largest of the United States Navy’s five “systems commands,” or materiel (not to be confused with “material”) organizations. From a physical perspective, NAVSEA has four shipyards for shipbuilding, conversion, and repair, ten “warfare centers” (two undersea and eight surface), the NAVSEA headquarters, located at the Washington Navy Yard, in Washington, D.C., and other locations in 15 states and 3 overseas continents.
  • VIDEO CHANNEL: NAVSEApa
  • VIDEO: I am NAVSEA. I am the Force Behind the Fleet. (31MAY2017)

NAVAL SUPPLY SYSTEMS COMMAND (NAVSUP)

(Last Update: Friday, 10JAN2025) (POC LOCATION: N4 LOGISTICS)

  • Naval Supply Systems Command (NAVSUP) Wikipedia – The United States Navy’s supply command provides the Navy and the United States Marine Corps with supplies, services, and quality-of-life support.
    • Headquartered in Mechanicsburg, Pennsylvania, the NAVSUP/Navy Supply Corps team oversees a diverse portfolio including supply chain management for material support to the Navy and Marine Corps, supply operations, conventional ordnance, contracting, resale, fuel, transportation, security assistance, and quality of life issues for naval forces, including food service, postal services, Navy Exchanges, and movement of household goods.
  • VIDEO CHANNEL: NAVSUPHEADQUARTERS
  • VIDEO: Naval Supply Systems Command: What We Do (16MAR2021)
  • See also the DEFENSE LOGISTICS AGENCY (DLA) section.
  • See also the LOGISTIC section.
  • See also the SUPPLY section.

NAVAL WAR COLLEGE (NWC OR NAVYWARLCOL)

(Last Update: Friday, 10JAN2025) (POC LOCATION: CAREER COUNSELOR and N7 TRAINING)

NAVALX

(Last Update: Friday, 10JAN2025)

NAVOSH (NAVY OCCUPATIONAL SAFETY & HEALTH)

(Last Update: Friday, 10JAN2025)

NAVY

(Last Update: Friday, 10JAN2025)

NAVY APP LOCKER

(Last Update: Friday, 10JAN2025)

  • Navy App Locker – An app version of the U.S. Navy’s associated website, that provides Navy Sailors, civilians, and family members a central location to view mobile applications, review detailed information about Navy-developed apps, and have streamlined access to their device’s appropriate app store. HelpDesk: navyapps@navy.mil
  • VIDEO: Navy App Locker Tutorial (31MAR2021)

NAVY COLLEGE

(Last Update: Friday, 10JAN2025) (POC LOCATION: CAREER COUNSELOR and N7 TRAINING)

NAVY COOL (CREDENTIALING OPPORTUNITIES ONLINE)

(Last Update: Friday, 10JAN2025) (POC LOCATION: CAREER COUNSELOR and N7 TRAINING)

NAVY CORE VALUES

(Last Update: Friday, 10JAN2025)

NAVY DEPARTMENT OF AWARDS WEB SERVICE (NDAWS)

(Last Update: Friday, 10JAN2025) (POC LOCATION: N1 ADMIN and CAREER COUNSELOR)

Navy Personnel Command > Career Management > Records Management > Decorations and Medals (Awards)

NAVY DIGITAL LIBRARY

(Last Update: Friday, 10JAN2025)

NAVY DRUG POLICY

(Last Update: Friday, 10JAN2025)

Navy Personnel Command > Support & Services > Culture & Resilience > Drug Alcohol Deterrence

  • The Navy’s policy on drug use is simple: ZERO TOLERANCE. This policy extends to illicit/illegal drugs as well as improper usage of prescription medications. Every command shall test a minimum of fifteen percent of all assigned personnel monthly. Every command shall conduct a unit sweep of all personnel assigned twice per year.
  • Policies and OPGUIDES
  • Systems (N173C)
  • Training

NAVY ELEARNING (NEL)

(Last Update: Thursday, 27FEB2025) (POC LOCATION: N7 TRAINING)

NAVY EMPLOYEE

(Last Update: Friday, 10JAN2025)

Civilian Pay and Holiday Schedule

OPM Operating Status

OPM Data Breach Fact Sheet

DON CIO FAQs and Additional Information

Furlough Guidance

Benefits & GRB Platform Access

Benefits Line: 888-320-2917
Hours: Monday-Friday, 7:30 a.m.-7:30 p.m., Eastern Time, except on federal holidays
Email: navybenefits@navy.mil. Emailers must include their full name, pay plan, grade, contact telephone number, and the best time to call. Do not include Privacy Act Information such as date of birth or social security number. Please allow two business days for a response (business days are Monday through Friday, except for Federal holidays).

GRB Platform (Formerly EBIS)

GRB Platform Login – An automated, secure, self-service Web application that allows employees to make health insurance, life insurance, and Thrift Savings Plan contribution elections, review general and personal benefits information, and calculate retirement estimates. In 2012 to protect personally identifiable information, employees could only access EBIS from a .mil, .edu, or .gov environment and using their DoD Common Access Card (CAC). Problems with accessing the GRB Platform can be sent to donchrportal@navy.mil

DONCEAP – Department of the Navy Civilian Employee Assistance Program

Department of the Navy employees are busy juggling work and family and it is not unusual to encounter difficulties with stress, family, relationships, alcohol, work, or other issues that impact their quality of life. DONCEAP has partnered with the Department of Health and Human Services Federal Occupational Health (FOH) to provide a new centralized employee assistance and work/life program for employees and their families. Employees can access services 24/7 through the DONCEAP website or by phone. A professionally staffed call center (844-366-2327) can provide answers to questions, research information, link employees to a wide variety of qualified local services, and provide licensed confidential support to help with difficult issues. (The DONCEAP fact sheet provides an overview of the program). DONCEAP Health and Wellness Presentation Guide International 888-262-7848

Travel

Travel Assistance Center (TAC) – Available to all DoD travelers 24 hours a day, seven days a week. Staffed by a team of trained analysts, the TAC offers assistance on the spectrum of DoD travel including DTS, Government Travel Charge Cards, Commercial Travel Programs, Travel Policy, and 24-hour Recruit Assistance. 888-435-7146.

Helpful Links

NAVY EMPLOYER RECOGNITION EVENT (NERE)

(Last Update: Friday, 10JAN2025)

NAVY ENTERPRISE SERVICE DESK (NESD)

(Last Update: Friday, 10JAN2025) (POC LOCATION: N6 INFORMATION PROFESSIONAL (IP) OFFICER or INFORMATION TECHNOLOGY (IT))

NAVY FAMILY ACCOUNTABILITY AND ASSESSMENT SYSTEM (NFAAS)

(Last Update: Friday, 10JAN2025) (POC LOCATION: N1 ADMIN)

NAVY FLEET AND FAMILY READINESS

(Last Update: Friday, 10JAN2025)

Navy Personnel Command > Support & Services > Culture & Resilience > Family Readiness > Fleet Family Support

NAVY GENERAL LIBRARY PROGRAM (NGLP)

(Last Update: Friday, 10JAN2025)

NAVY GOLD STAR PROGRAM

(Last Update: Friday, 10JAN2025)

Navy reserve information resourceNavy Gold Star Program – Provides support to surviving family members of Sailors who died while on active duty, regardless of your loved one’s military branch, location, or manner of death. Coordinators strive to be a resource and embody the program’s mission of connecting with surviving family members of active duty deaths through engagement, creating a culture of remembrance. Coordinators are located all over the United States and are here to serve as the trusted connection to the Navy for as long as family members desire.

NAVY-MARINE CORPS RELIEF SOCIETY

(Last Update: Friday, 10JAN2025)

  • Navy-Marine Corps Relief Society Wikipedia – A non-profit organization was created “to provide, in partnership with the Navy and Marine Corps, financial, educational, and other assistance to members of the Naval Services of the United States, eligible family members, and survivors when in need, and to receive and manage funds to administer these programs.”
  • VIDEO CHANNEL: Navy-Marine Corps Relief Society
  • VIDEO: NMCRS Our Mission (12JUN2023)

NAVY ORGANIZATIONAL STRUCTURE

(Last Update: Friday, 10JAN2025)

N1 MANPOWER (Places) & PERSONNEL (Faces)

– ADMINISTRATION (ADMIN)

N2 INTELLIGENCE (INTEL)
N3 OPERATIONS (OPS)
N4 LOGISTICS (LOG)
N5 PLANS & STRATEGY
N6 COMMUNICATION & INFORMATION TECHNOLOGY (IT)
N7 TRAINING
N8 FINANCE/RESOURCES

NAVY PERSONNEL COMMAND (NPC)

(Last Update: Friday, 10JAN2025) (POC LOCATION: N1 ADMIN)

NAVY RECRUITING COMMAND (NRC)

(Last Update: Friday, 10JAN2025) (POC LOCATION: Recruiter)

Navy Personnel Command > Career Management > Detailing > Enlisted > Shore Special > Recruiting

NAVY RESERVE E-LODGING (NREL)

(Last Update: Friday, 10JAN2025) (POC LOCATION: N4 LOGISTICS)

NAVY RESERVE

(Last Update: Friday, 08AUG2025)

  • Navy Portal (NRH)
  • Navy Reserve (NR) organization and components Structure – Purpose of reserve components (Source: 10 USC CHAPTER 1003 Sec. 10102). The purpose of each reserve component is to provide trained units and qualified persons available for active duty in the armed forces, in times of war or national emergency, and at such other times as the national security may require, to fill the needs of the armed forces whenever more units and persons are needed than are in the regular components. The NR is the Reserve Component (RC) of the U.S. Navy and is broken down into several categories based on service responsibilities and commitment status in contributing to the overall mission. It comprises the Ready Reserve, Standby Reserve, and Retired Reserve-Inactive.
  • VIDEO: Navy Reserve History (30MAY2014)
  • VIDEO: The Navy Reserve | Your Opportunity To Grow (10JUN2021)
  • VIDEO: The 7 Things You Need To Know About The Navy Reserves (01DEC2019)

Navy reserve information resourceSource: BUPERS INSTRUCTION 1001.39F (Chapter 1 – Figure 1-1) and Categories (Chapter 1 – Figure 1-2)

  • Ready Reserve – The Ready Reserve provides a pool of trained servicemembers who are ready to step in and serve whenever and wherever needed. It is made up of the Selected Reserve, which includes Drilling Reservists/Units as well as Full-Time Support (FTS)/(TAR) personnel, and the Individual Ready Reserve (IRR).
  • Selected Reserve (SELRES) – This group – the largest and most relied upon of the Ready Reserve – consists of:
    Drilling Reservists/Units – These are designated Reservists who are available for recall to Active Duty status. They serve as the Navy’s primary source of immediate manpower. They typically fulfill the traditional service commitment of one weekend a month and two weeks a year. They receive many of the same benefits and perform many of the same duties as their Active Duty counterparts. This includes persons on initial Active Duty for training.
  • Training and Administration of the Reserve (TAR) (was Full Time Support (FTS)) – These are designated Reservists who perform full-time Active Duty service that relates to the training and administration of the Navy Reserve program. They may be assigned to shore activities and commands or operational units. They typically are not reassigned to different locations as often as those on regular Active Duty. And they receive the same pay, allowances, and benefits as Active Duty members.
  • See also the TRAINING AND ADMINISTRATION OF THE RESERVE (TAR) section.
  • Individual Ready Reserve (IRR) – This group consists of individuals who have had training or have previously served in an Active Duty component or the Selected Reserve.
    • Inactive status – These members of the IRR do not drill, are not obligated to take part in military activities, and receive no pay or benefits.
    • Active status – Individuals assigned to the IRR may be eligible to receive pay or benefits for voluntarily performing specific types of Active Duty (AD) service.

Echelon I Chief of Naval Operations/Chief of Navy Reserve
Echelon II Commander, Navy Reserve Force (00072) (CNRF)
Echelon III Commander, Navy Reserve Forces Command (3447B) (CNRFC)
Echelon III Commander, Naval Air Force Reserve (00071) (CNAFR)
Echelon IV Reserve Component Commands (RCC)/Readiness and Mobilization Command (RMC)
Echelon V Navy Reserve Center (NRC)

Office of Navy Reserve: Appointment of Chief, Echelon I – The Chief of Navy Reserve (CNR) is the office within the executive part of the Department of the Navy, subject to the authority, who direction, and control of the Secretary of the Navy and the Chief of Naval Operations is responsible for the preparation, justification, and execution of the personnel, operation and maintenance, and construction budgets for the Navy Reserve. As such, the Chief of Navy Reserve is the director and functional manager of appropriations made for the Navy Reserve in those areas.

Navy Reserve Force, Echelon II
(a) Establishment of Command – The Secretary of the Navy, with the advice and assistance of the Chief of Naval Operations, shall establish a Navy Reserve Force. The Navy Reserve Force shall be operated as a separate command of the Navy.
(b) Commander – The Chief of Navy Reserve shall be the commander of the Navy Reserve Force. The commander of the Navy Reserve Force reports directly to the Chief of Naval Operations.

Commander, Navy Reserve Forces Command (CNRFC), Echelon III –
CNRFC is a 2-star responsible for establishing and managing the Navy Reserve policy. CNRFC, also known as “ResFor” (Reserve Forces), is located in Norfolk, Virginia.

Reserve Component Command (RCC) / Readiness and Mobilization Command (RMC) (Also referred to as… REaDiness COMmand (REDCOM), Echelon IV –
Most RMCs are commanded by a Navy O-6. (REDCOM Locations)

Navy Reserve Center (NRC) Echelon V –
They provide administrative oversight and coordination of Navy Reserve Units (NRU). The rank of the NRC CO varies between O-4 and O-6, based on the number of SELRES assigned to a given NRC. NRCs are also referred to as Naval Reserve Activities (NRA). (NRC Locations)

Naval Reserve Unit (NRU) Echelon VI –
Naval Reserve Units support operational commands while also monitoring the mobilization readiness of respective Reserve personnel. NRUs are also referred to as Naval Reserve Activity Unit (NRAU)/Navy Reserve Readiness Unit (NRRU).

NAVY RESERVE ACTIVITY

(Last Update: Friday, 10JAN2025)

  • NAVY RESERVE ACTIVITY (NRA) Overarching terms include Navy Reserve Centers (NRC), CNAFR Squadrons, or NSW commands totaling over 140 commands across the country. NRAs are self-sufficient to provide all administrative support to attached Reserve Units, including processing Drill pay and personnel transactions. Each NRA is responsible for a specific group of RUICs.
  • RESERVE UNIT IDENTIFICATION CODE (RUIC) Reserve Billets are grouped and assigned to RUICs for a common unit/mission. RUIC is an overarching term that includes UMUICs and TRUICs. A single RUIC could be considered either a UMUIC or a TRUIC, depending on the perspective being used. The difference in perspectives depends on the relationship of where the SELRES member chooses to drill (often at an NRA closest to home) and to which NRA their billet/RUIC is assigned. If an SELRES lives near the NRA to which their Billet/RUIC is assigned, then the UMUIC and TRUIC may be the same. If the SELRES lives far from the NRA to which their billet/RUIC is assigned, then often the UMUIC and TRUIC are different RUICs assigned to different NRAs.
  • UNIT MOBILIZATION UIC (UMUIC) The RUIC to which Mobilization Billets are assigned. Each UMUIC is assigned to a single NRA. The UMUIC Commanding Officer is the Reporting Senior for all SELRES assigned to the UMUIC’s billets. When an SELRES applies for a billet, the billet is associated with the UMUIC.
  • TRAINING UIC (TRUIC) The RUIC to whom a SELRES is attached for Administrative Support to include drill pay processing, PFA, medical/ dental, and CMTs. When not traveling to their gaining command and/or to their UMUIC drill site, the SELRES would drill with their TRUIC (often closer to home).

The Navy Reserve model is a hybrid of the Active Duty Navy and National Guard models in that:
1. Like Active Navy, the Billets are set; they are colocated with one of 140 nationwide NRAs.
2. Like the National Guard, SELRES are not PCS’d; they choose where to live.

Given that SELRES may apply to any Rating/Designator appropriate billets (regardless of billet location), there is often a case of SELRES and billets differing in location. In these cases, a member may be assigned to a billet at a distant NRA and attached to an NRA closer to home for administrative support; this is the basis for ‘Locally Assigned’ vs ‘Non-Locally Assigned’. A ‘Locally Assigned’ SELRES’s lives near their billet, and thus their UMUIC and TRUIC are the same RUIC. Whereas a ‘Non-Locally-Assigned’ SELRES lives distant from their billet and thus has a different UMUIC (Billet located far away) and TRUIC (RUIC located at NRA close to home).

  • NON-LOCALLY-ASSIGNED-IN (NLAI) VS NON-LOCALLY-ASSIGNED-OUT (NLAO) A SELRES member who is “Non-Locally-Assigned” has two different RUICs with whom to coordinate: Their TRUIC with whom they are attached for administrative support, and their UMUIC with whom their mobilization billet is attached.
  • NON-LOCALLY-ASSIGNED-IN (NLAI) NLAI is the UMUIC CO’s perspective. The member is assigned to one of their UMUIC billets, but Drills with another UIC (the member’s TRUIC).
  • NON-LOCALLY-ASSIGNED-OUT (NLAO) NLAO is the TRUIC CO’s perspective. A SELRES member, who is not assigned to any of the RUIC’s billets but drills with the RUIC for Administrative Support, is NLAO.

NAVY RESERVE CENTER (NRC)

(Last Update: Friday, 10JAN2025)

  • Navy Reserve Center (NRC) – The mission of the NRC is to provide mission-capable units and individuals to active duty. “Ready Now. Anytime, Anywhere.”
  • NRC Locations
  • Navy Reserve Center (NRC) – A Navy Reserve Organization Echelon V Command
  • NRC OFFICE ROLES AND RESPONSIBILITIES: NRC staff levels vary depending on the number of Reservists supported. The following roles exist at all NRCs but may be supported by a single NRC staff member or an independent department of many staff members, depending on the NRC. This is not a total list of the department’s duties, but it will ensure you know where to go to address any issues described.

Command Career Counselor: Responsible for managing the Navy Enlisted Retention and Career Development Program and serves as the critical link between an individual Sailor, his or her command, and supporting Navy organizations, including Navy Personnel Command (NPC).
Command Services/Administration: Responsible for maintaining Service Records, Evaluations, Awards, and other services.
Reserve Pay: Responsible for muster and adjudication of the sailors’ drills in the Enhanced Drill Management (EDM) module of the Navy Standard Integrated Personnel System (NSIPS) website.
Manpower: Responsible for Officer and Enlisted billet management, including gains and losses.
Mobilization: Responsible for initial notification and processing of reservists for mobilization, de-mobilization, and Active Duty Operational Support (ADOS – formerly Active Duty for Special Work (ADSW)).
Supply: Responsible for providing berthing, meals, and uniforms to applicable Sailors.
Medical: Manages the Sailor’s medical and dental records and tracks medical readiness.
Operations / Travel: Assists the Sailor in their execution of Annual Training (AT)/Active Duty for Training (ADT)/Inactive Duty for Training Travel (IDTT) orders through NROWS, management of the Government Travel Charge Card (GTCC) program, and the tracking and processing the Sailor’s travel claims.
Training: Responsible for managing the Sailor’s training, including the annually directed Common Military Training (CMT) and school requirements, assisting the Sailor in gaining quotas for other required courses.
Information Technology: Managed the sailors’ NMCI access.
Security Manager: Assists the Sailor in meeting the requirements to gain and maintain a security clearance.

NAVY RESERVE HOMEPORT

(Last Update: Friday, 10JAN2025)

NAVY RESERVE VISION

(Last Update: Friday, 10JAN2025)

NAVY SPOUSE NAVIGATION

(Last Update: Friday, 10JAN2025) (POC LOCATION: OMBUDSMAN)

  • See also the SPOUSE section.

NAVY WARFARE DEVELOPMENT COMMAND (NWDC)

(Last Update: Friday, 10JAN2025)

NAVY WARFARE LIBRARY

(Last Update: Friday, 10JAN2025)

Navy reserve information resource

  • Navy Warfare Library (CAC login) (NTTP 1-01EDITION APRIL 2005) – A compilation of doctrinal, tactical, and reference publications. It defines the organization and procedures governing naval doctrine publications (NDPs), Navy warfare publications (NWPs), Navy tactics, techniques, and procedures (NTTPs), Navy tactical reference publications (NTRPs); fleet exercise publications (FXPs), and tactical memoranda (TACMEMOs). It defines relationships among commands and programs involved in tactics development, assigns responsibilities for developing and maintaining tactical and doctrinal publications, and contains guidance for maintaining the NWL. Where applicable, NTTP 1-01 addresses procedures on multiservice publications; Allied publications (APs); multinational publications (MPs); joint publications (JPs); and the Navy Lessons Learned System (NLLS) used by U.S. Navy forces.
    • Commands requiring technical assistance or information should contact the Navy Warfare Development Command NWEL coordinator at nwdc_nrfk_fleetpubs@navy.mil or 757-341-4339 or DSN 948-1856. For distribution or requirement issues, contact the Distribution Division at the same address or (401) 841-6412 or DSN 341-4339.
  • Navy Warfare Electronic Library (NWEL) – A product of the Navy Warfare Development Command. It contains Naval Doctrine Publications (NDPs), Navy Warfare Publications (NWPs), Navy Tactics, Techniques, and Procedures (NTTPs), Navy Tactical Reference Publications (NTRPs), Fleet Exercise Publications (FXPs), EXTAC1000 series, Multinational Manuals, selected TACMEMOs, selected Operations and Tactics Guides (OTGs), and selected Air Standardization Coordinating Committee (ASCC) documents. NWEL publications are distributed in PDF format and can be obtained from the NWDC SIPRNET website (https://ndls.nwdc.navy.mil). CDs are sent to the ship’s CIC Officer and are stowed in combat.
  • Reference Library
  • VIDEO: The Need for U.S. Seapower in a Challenging World — Seapower Conversations (09JUN2022)
  • See also the LIBRARY section.

NAVY WEEK

(Last Update: Friday, 10JAN2025) (POC LOCATION: NAVY OFFICE OF COMMUNITY OUTREACH (NAVCO))

  • Navy Week – The program served as the Navy’s principal outreach effort into areas of the nation without a significant Navy presence, with over 250 Navy Weeks held in 80 different U.S. cities. The program is designed to share with Americans how their Navy is deployed around the world, and why a strong Navy is vital to protecting the American way of life.
    • Navy Weeks focuses on a variety of outreach assets, equipment, and personnel in a single city for a week-long series of events with key influencers and organizations across the market. During Navy Week, 75-100 outreach events occur in partnership with corporate, civic, government, education, media, veterans, community service, and diversity organizations throughout the city.
    • The Blue Angels, the Navy Parachute Team, Navy bands, Navy divers, namesake ship and submarine crews, hometown Sailors, medical personnel, Naval environmental, USS Constitution Sailors and equipment, and Navy recruiting all participate in the Navy Week program.
  • Contact: Navy Week Department (901) 874-7048 NavyOutreach@navy.mil
  • VIDEO: Navy Week Preview (19JUN2024)
  • VIDEO: ICYMI: New York Fleet Week (12JUN2023)
  • VIDEO: New York Fleet Week 2021 – May 26 -30 (24MAY2021)
  • See also the FLEET WEEK section.

NAVY WOUNDED WARRIOR (NWW)

(Last Update: Friday, 10JAN2025)

NETC (NAVAL EDUCATION AND TRAINING COMMAND)

(Last Update: Thursday, 27FEB2025) (POC LOCATION: CAREER COUNSELOR and N7 TRAINING)

NEWS

(Last Update: Friday, 10JAN2025) (POC LOCATION: MC or PAO)

NEW TO THE NAVY

(Last Update: Friday, 10JAN2025)

NIF (NAVY INFORMATION FORCES)

(Last Update: Friday, 10JAN2025) (POC LOCATION: INTEL OFFICER or INTELLIGENCE SPECIALIST (IS))

NIPR (NON-CLASSIFIED INTERNET PROTOCOL)

(Last Update: Friday, 10JAN2025) (POC LOCATION: N6 INFORMATION PROFESSIONAL (IP) OFFICER or INFORMATION TECHNOLOGY (IT))

NIPRGPT

(Last Update: Saturday, 26APR2025)

  • NIPRGPT – An experimental generative AI chatbot developed by the Air Force Research Laboratory and the Department of the Air Force operates on the secure NIPRNet, enabling CAC-authorized DoD personnel to perform tasks like drafting documents, coding, and data analysis. It serves as a testing platform to gather feedback, train the workforce, and drive modernization within the Dark Saber initiative, achieving rapid adoption with over 80,000 users in its first three months. Despite its productivity benefits, NIPRGPT faces limitations in critical thinking, potential biases, and criticisms over redundancy and cybersecurity concerns, requiring users to review outputs carefully and stay updated on evolving DoD AI policies.
  • RESEARCH: NIPRGPT Perplexity AI
  • VIDEO: NIPRGPT vs. CAMOGPT: Which DoD AI Tool Is Better in 2025? (15APR2025)
  • See also the AI (ARTIFICIAL INTELLIGENCE) section.
  • See also the RAIN (RESERVE ARTIFICIAL INTELLIGENCE NAVIGATOR) section.

NMCI (NAVY/MARINE CORPS INTRANET)

(Last Update: Friday, 31JAN2025) (POC LOCATION: N6 INFORMATION PROFESSIONAL (IP) OFFICER or INFORMATION TECHNOLOGY (IT))

NOBC (NAVY OFFICER BILLET CLASSIFICATION)

(Last Update: Friday, 10JAN2025) (POC LOCATION: N1 ADMIN)

Navy Personnel Command > Career Management > Reserve Personnel Mgmt > Officers > NOBC AQD

NON-JUDICIAL PUNISHMENT (NJP) (AKA CAPTAIN’S MAST)

(Last Update: Friday, 10JAN2025) (POC LOCATION: JAG or LN)

NON-PROFIT FOUNDATION

(Last Update: Friday, 10JAN2025)

  • Honor Flight Network Wikipedia – A non-profit organization created to honor America’s veterans for all their sacrifices by transporting our heroes to Washington, D.C. to visit their memorials.
  • Navy SEAL Foundation – Provides critical support for the warriors, veterans, and families of Naval Special Warfare.
  • Warrior Dog Foundation Wikipedia – A non-profit organization that provides care and comfort to dogs that have ended their service supporting American troops.
  • Wounded Warrior Project (WWP) Wikipedia – A nonprofit 501(c)(3) organization charity and veterans service organization that offers a variety of programs, services, and events for wounded veterans of the military actions following September 11, 2001.
  • U.S. Naval Institute Wikipedia – A nonprofit professional military association, established in 1873, that seeks to offer independent, nonpartisan forums for debate on national defense and security issues.

NON-RESIDENT TRAINING COURSES (NRTC)

(Last Update: Thursday, 27FEB2025) (POC LOCATION: N7 TRAINING)

Navy Personnel Command > Support & Services > MyNavy Career Center > Pers Pay Support > Sailor Self Service > Training Education

  • Nonresident Training Courses (NRTCs) – Formerly known as “Rate Training Manuals” or “TRAMANs” – are Navy nonresident training program material. (Source: Global Security)
  • Sailors often study Navy Non-Resident Training Courses (NRTC) and Rate Training Manuals (RTM) to prepare for advancement exams or expand their rating knowledge. NRTC and RTM self-study packages are now on the Navy eLearning and My Navy Portal (CAC MNP) websites.
    Formal course enrollment is required for assessments. On NeL, select the course catalog tab near the top of the page, and within the Learning Category, select “Navy Rate Training Courses.” NRTC and RTMs are segmented by chapter, and Sailors can choose to either save or launch the chapter. After each chapter is launched and completed, the subsequent assessment is available. All NRTC/RTM individual assessments within each chapter must be accomplished in this manner to record completion.
    One of the perks is that NeL will grade, offer certificates, and record completions automatically, entering them into a Sailor’s ETJ (Electronic Training Jacket).
  • See also the EDUCATION / SCHOOL / TRAINING section.
  • See also the NAVY ELEARNING (NEL) section.

NOSC (NAVY OPERATIONAL SUPPORT COMMAND) / NAVY RESERVE CENTER (NRC)

(Last Update: Friday, 10JAN2025)

NP2 (NAVY PERSONNEL AND PAY)

(Last Update: Friday, 10JAN2025)

NPC (NAVY PERSONNEL COMMAND)

(Last Update: Friday, 10JAN2025) (POC LOCATION: N1 ADMIN)

NRA (NAVY RESERVE ACTIVITIES)

(Last Update: Friday, 10JAN2025)

  • NRA (Navy Reserve Activities) – All commands that have administrative control of reserve command sailors (i.e., Navy Reserve Center (NRC), squadrons, etc.). NRAs are responsible for the verbal notification, activation, and processing of members identified for mobilization. Additionally, NRAs assist the Expeditionary Combat Readiness Center (ECRC) Wikipedia in completing the demobilization process.

NRAU (NAVY RESERVE AUGMENT UNIT)/NAVY RESERVE READINESS UNIT (NRRU) CO/OIC QUALIFICATION PROGRAM

(Last Update: Friday, 10JAN2025) (POC LOCATION: N7 TRAINING)

NROWS (NAVY RESERVE ORDER WRITING SYSTEM) (TRAVEL)

(Last Update: Friday, 10JAN2025) (POC LOCATION: N7 TRAINING)

NRRM (NAVY RESERVE READINESS MODULE)

(Last Update: Friday, 10JAN2025) (POC LOCATION: N1 ADMIN and N7 TRAINING)

  • Navy Reserve Readiness Module (NRRM)NRRM (Navy Reserve Readiness Module) Helpdesk: NRRM-Support@innovasi.com or 619-647-3177 – A comprehensive data viewing system designed to consolidate, store, and manage readiness information for the Navy Reserve. This web-based program provides the capability for displaying and analyzing readiness data at various levels of detail to give the user a clear picture of current readiness.

NRRQ (NAVY RESERVE QUALIFICATION QUESTIONNAIRE)

(Last Update: Friday, 10JAN2025) (POC LOCATION: N1 ADMIN)

Navy Personnel Command > Career Management > Reserve Personnel Mgmt > Officers > NRQQ

  • NRQQ (Navy Reserve Qualification Questionnaire) Form from NPC – It provides current information on your experience, education, and skills for determining mobilization assignments. It includes information on your foreign language proficiency, civilian education, and professional achievements to boards considering you for selection to the next higher grade, or to disposition boards considering you for retention in or release from the Navy Reserve. NAVPERS 1200/2 (Rev. 08-2010)
  • Ready Reserve Screening Questionnaire (NAVPERS 1001/3 Rev 05-04)

NSIPS (NAVY STANDARD INTEGRATED PERSONNEL SYSTEM)

(Last Update: Friday, 10JAN2025) (POC LOCATION: N1 ADMIN)

About MyNavy HR > Commands > Navy Personnel Command > Organization > NPC Internal> Information Management > Corporate Systems > NSIPS


O — “Oscar”

OATH OF ENLISTMENT

(Last Update: Sunday, 19JAN2025)

OATH OF OFFICE

(Last Update: Sunday, 19JAN2025)

  • Oath of office Wikipedia – All officers of the eight uniformed services of the United States swear or affirm an oath of office upon commissioning. It differs from that of the oath of enlistment that enlisted members recite when they enter the service. It is required by statute, the oath being prescribed by Section 3331, Title 5, United States Code. It is traditional for officers to recite the oath upon promotion, but as long as the officer’s service is continuous, this is not required.
  • “I, [name], do solemnly swear (or affirm) that I will support and defend the Constitution of the United States against all enemies, foreign and domestic; that I will bear true faith and allegiance to the same; that I take this obligation freely, without any mental reservation or purpose of evasion; and that I will well and faithfully discharge the duties of the office on which I am about to enter. So help me God.”
  • VIDEO: PS24 SwearIn Ceremony (28JUN2024)
  • VIDEO: Class of 2012 – Oath of Office (25MAY2012)
  • VIDEO: Removing the Military from Politics: Military Oath of Enlistment and Officer’s Oath of Office (19OCT2021)
  • See also the PROMOTION / COMMISSIONING section.

OCS (OFFICER CANDIDATE SCHOOL)

(Last Update: Sunday, 19JAN2025)

ODC (OFFICER DATA CARD), OSR (OFFICER SUMMARY RECORD), PSR (PERFORMANCE SUMMARY RECORD)

(Last Update: Sunday, 19JAN2025) (POC LOCATION: N1 ADMIN)

  • ODC (Officer Data Card) (via BOL), NAVPERS 1301/51, is a report containing personal information for active Officers and is created from the Officer Personnel Information System (OPINS) database. The ODC contains personal data, education data, service school data, assignment history, promotion history, etc., for the active officer.
  • Officer Data Card (ODC) – Point of Contact Listing
  • Manual of Navy Officer Manpower and Personnel Classifications (APR2023)
    Volume II Officer Data Card NAVPERS 15839
  • PSR (Performance Summary Record) (via BOL) consists of three separate documents:
    • Part I – also known as the Officer Summary Record (OSR), OSR ‘Top Sheet’ or NAVPERS 1070/123. This report contains much of the same data as that on the Officer Data Card (ODC). Both the OSR and the ODC are generated from the Officer Personnel Information System (OPINS) database. Since most of the fields are the same, instructions in the online ODC will be used for the correction of the OSR fields as well.
    • Part II – also known as the Officer Summary Record (OSR) ‘Bottom Sheet’, pre-96 PSR or NAVPERS 1070/50, contains performance fitness and evaluation history before 1 January 1996.
    • Part III – also known as the Performance Summary Report (PSR) or post-96 PSR contains performance fitness and evaluation history since 1 January 1996.
  • VIDEO: How to Read Your Performance Summary Report (PSR) (23MAY2016)
  • VIDEO: It’s Your Record (It’s Your Career Series Playbook #1, Ep. 2) (01FEB2022)
  • See also the ADVANCEMENT section.
  • See also the SELECTION BOARD section.

OFFICER

(Last Update: Sunday, 19JAN2025)

  • Officer Wikipedia – A member of an armed force or uniformed service who holds a position of authority.
  • Officer Record Management (February 2020)
  • The Armed Forces Officer (2017) by Richard M. Swain and Albert C. Pierce
  • Officer Permanent Personnel Record
    • MILPERSMAN 1000-020 Pay and Personnel Record Maintenance Responsibilities
      • Policy
      • Records Responsibilities
      • Recall/ Mobilization Responsibilities

      MILPERSMAN 1070-020 Officer Permanent Personnel Record

      • Policy
      • Document Categories
      • Updating the OMPF
      • Record Correction/Change Requirements
      • Record Review/Access
      • Documents provided to Selection Boards

      MILPERSMAN 1070-030 Creating the Officer Permanent Personnel Record

      • Policy
      • Documents Used to Create a Record
      • Where and How to Send Documents
      • Interservice Transfers

      MILPERSMAN 1070-111 Submission of NSIPS and ESR Documents to the OMPF

      • Policy
      • NSIPS/ESR Documents
      • Best Practice

      MILPERSMAN 1070-180 Officer Photographs

      • Policy
      • Uniform Requirements
      • Photograph Requirements
      • Title Board Specifications)
      • Submission (Note: the correct PERS code is PERS-313 versus PERS-312C)
  • Decoder for US Navy app – android and ios it has the AMD, Enlisted Rating Codes (NEC), IMS Codes, MAS Codes, Navy Reserve Activity (NRA) Codes, NOBC Codes (Subspecialty Codes), Officer Billet Codes, Officer Designators, Officer Paygrade Codes, RBSC Billet Codes, Reserve Program Codes, Reserve Unit Identification Codes (UIC), RFAS-Officer Codes, RUAD, and other useful items.
  • VIDEO: Path to Commissioning | How to Become a Navy Officer (10JUN2021)
  • VIDEO: Your Navy Role | What’s the Difference Between Officers and Enlisted Sailors? (10JUN2021)

OIC (OFFICER IN CHARGE)

(Last Update: Sunday, 19JAN2025)

OJT (ON-THE-JOB TRAINING)

(Last Update: Sunday, 19JAN2025) (POC LOCATION: Supervisor)

  • On-the-job training (OJT) Wikipedia – The practical instruction of personnel in the performance of maintenance tasks by demonstration and simulation. OJT is conducted under the supervision of designated personnel in the shop or on the operating line. The experienced personnel of the activity are used as fully as possible in instructing, demonstrating, and imparting their skills to the less experienced. As to equipment, only the job and tools are required. The vital ingredient is an individual who has an interest in the job, the skill to do it well, and the capability to instruct. The striker or trainee learns by seeing the job done and gains experience by participating in the work. The nature of this type of training makes regular scheduling impractical. (Source)
  • See also the EDUCATION / SCHOOL / TRAINING section.

OMBUDSMAN

(Last Update: Sunday, 19JAN2025)

About MyNavy HR > Commands > Navy Personnel Command > Organization > NPC Internal > Ombudsman

  • Ombudsmen – An official representative of the Commanding Officer (CO) who plays a vital role in establishing and maintaining current and accurate communication between the command and its family members.
  • Ombudsman Registry – The registry allows CNIC to deliver real-time communication and information to Commanders, Ombudsman, Wikipedia and Ombudsman Coordinators. Commands are required to register their ombudsman and ensure that the required worksheet data is submitted per OPNAVINST 1750.1 series. NOTE: Use the Contact Your Ombudsman button to locate your ombudsman and send an email to the registered command ombudsman.
  • VIDEO: COE 2.0: Navy Programs and Resource for Setting the Foundation (19JUL2024)
  • VIDEO: Ombudsman Indoc (16FEB2023)
  • VIDEO: OMBUDSMEN Interviews (06MAR2014)

OMPF (OFFICIAL MILITARY PERSONNEL FILE)

(Last Update: Sunday, 19JAN2025) (POC LOCATION: N1 ADMIN or CAREER COUNSELOR)

Navy Personnel Command > Record Management > OMPF My Record

ONBOARDING

(Last Update: Saturday, 24MAY2025) (POC LOCATION: N1 ADMIN or CAREER COUNSELOR)

OODA LOOP

(Last Update: Sunday, 19JAN2025)

OPERATIONS

(Last Update: Sunday, 27APR2025)

  • The US Navy’s operations encompass a wide range of activities, from conventional warfare at sea to special operations, with a focus on maintaining maritime dominance and global security. Naval operations can be broadly categorized by their location (brown-water, blue-water, and green-water) and their purpose, including combat, support, and deterrence. The Navy’s operations are critical for maintaining maritime dominance, projecting power globally, and supporting national security objectives, according to the U.S. DoD.
  • Key aspects of Navy operations include:
    • Strategic and Tactical Operations: The Navy engages in both strategic-level planning and tactical operations at sea, including warfare, surveillance, and maritime security.
    • Fleet Operations: The Navy operates various fleets, including the Pacific Fleet, Fleet Forces Command, and others, each with specific areas of responsibility and operational capabilities.
    • Special Operations: The Naval Special Warfare Command (NAVSO) conducts covert and unconventional operations, working in conjunction with other special operations units within the US Armed Forces.
    • Support Operations: The Navy also provides logistical support through the Military Sealift Command, which transports essential supplies and equipment to deployed forces.
    • Naval Aviation: The Navy employs naval aviation for a variety of missions, including air support, intelligence gathering, and maritime patrol.
    • Distributed Maritime Operations (DMO): The Navy’s Distributed Maritime Operations (DMO) concept emphasizes the use of a wide range of platforms and capabilities to maintain sea control and distribute resources effectively, according to a Congressional Research Service document.
    • Cyber Warfare: The Navy also engages in cyber warfare operations through the Fleet Cyber Command/10th Fleet.
  • Examples of Navy operations include:
    • Anti-surface warfare (ASW): Utilizing ships and aircraft to engage surface threats.
    • Anti-air warfare (AAW): Defending against aerial threats, including aircraft and missiles.
    • Anti-submarine warfare (ASW): Tracking and engaging submarines.
    • Amphibious warfare: Deploying troops and equipment from ships onto land. [VIDEO]
    • Freedom of Navigation Operation (FONOP): Conducting operations to challenge excessive maritime claims and assert the rights, freedoms, and lawful uses of the sea recognized in international law.
    • Mine warfare: Deploying and clearing mines.
    • Naval gunfire support: Providing artillery support to land forces.
    • Search and rescue: Responding to maritime incidents and providing aid to those in distress.
    •  

OPERATIONAL RISK MANAGEMENT (ORM)

(Last Update: Sunday, 19JAN2025)

Risk Matrix

ORDERS

(Last Update: Sunday, 19JAN2025) (POC LOCATION: N1 ADMIN)

11 GENERAL ORDERS OF A SENTRY Wikipedia – Orders to Sentry is the official title of a set of rules governing sentry (guard or watch) duty in the United States Armed Forces.

    1. To take charge of this post and all government property in view.
    2. To walk my post in a military manner, keeping always on the alert, and observing everything that takes place within sight or hearing.
    3. To report all violations of orders I am instructed to enforce.
    4. To repeat all calls from posts more distant from the guard house than my own.
    5. To quit my post only when properly relieved.
    6. To receive, obey, and pass on to the sentry who relieves me all orders from the Commanding Officer, Command Duty Officer, Officer of the Deck, and Officers and Petty Officers of the Watch only.
    7. To talk to no one except in the line of duty.
    8. To give the alarm in case of fire or disorder.
    9. To call the Officer of the Deck in any case not covered by instructions.
    10. To salute all officers and colors and standards not cased.
    11. To be especially watchful at night and during the time for challenging, to challenge all persons on or near my post, and to allow no one to pass without proper authority.

OSO (OPERATIONAL SUPPORT OFFICE)

(Last Update: Sunday, 19JAN2025)

  • OSO (Operational Support Office) – OSO/Reserve Program Director (RPD) liaises between Regional Reserve Component Commanders, Navy Reserve Center (NRC)/, Reserve Units, individual Selected Reservists, and Active Commands. OSO/Reserve Program Director (RPD) improves the effectiveness of the Navy’s Total Force policy and enhances Active-Reserve Integration by facilitating access to Reserve assets and maximizing operational support. This includes the planning, budgeting, and execution of funds to meet Active Component requirements for Navy Reserve employment.

OSPADES (OPERATIONAL SUPPORT PLANNING AND EXECUTION SYSTEM)

(Last Update: Sunday, 19JAN2025) (POC LOCATION: N1 ADMIN)

  • OSPADES 3.0 (NGen) (Operational Support Planning and Execution System) – A critical system used by the Navy Reserve to manage extra training periods and funding. It provides different levels of access for Commanding Officers, Operational Support Officers, and EXCOM users to track and distribute drills and allocate resources. This system ensures efficient management of training activities and funds within the Navy Reserve.

OSR (OFFICER SUMMARY RECORD)

(Last Update: Sunday, 19JAN2025) (POC LOCATION: N1 ADMIN)

  • PSR (Performance Summary Record) (via BOL) consists of three separate documents:
    • Part I – also known as the Officer Summary Record (OSR), OSR ‘Top Sheet’ or NAVPERS 1070/123. This report contains much of the same data as that on the Officer Data Card (ODC). Both the OSR and the ODC are generated from the Officer Personnel Information System (OPINS) database. Since most of the fields are the same, instructions in the online ODC will be used for the correction of the OSR fields as well.
    • Part II – also known as the Officer Summary Record (OSR) ‘Bottom Sheet’, pre-96 PSR or NAVPERS 1070/50, contains performance fitness and evaluation history before 1 January 1996.
  • VIDEO: How to Read Your Performance Summary Report (PSR) (23MAY2016)
  • VIDEO: Quick Review of How to Update Your Record (18OCT2017)

P — “Papa”

PAGE 2 (DEPENDENCY APPLICATION/RECORD OF EMERGENCY DATA) NAVPERS 1070/602

(Last Update: Wednesday, 15JAN2025) (POC LOCATION: N1 ADMIN)

PARENTHOOD

(Last Update: Wednesday, 15JAN2025) (POC LOCATION: OMBUDSMAN)

Navy Personnel Command > Support & Services > Culture & Resilience > Parenthood Pregnancy

PAY

(Last Update: Friday, 08AUG2025) (POC LOCATION: RESPAY or PSD)

Navy Personnel Command > References > Pay & Benefits

PAY / PERSONNEL / TRAVEL SOPs

(Last Update: Wednesday, 15JAN2025) (POC LOCATION: N1 ADMIN or CPPA or RESPAY, or N7 TRAINING)

PCS (PERMANENT CHANGE of STATION)

(Last Update: Wednesday, 15JAN2025) (POC LOCATION: LOCAL TRANSPORTATION OFFICE)

PDF (PORTABLE DOCUMENT FORMAT)

(Last Update: Wednesday, 15JAN2025) (POC LOCATION: N6 INFORMATION PROFESSIONAL (IP) OFFICER or INFORMATION TECHNOLOGY (IT))

  • Portable Document Format (PDF) Wikipedia – A file format developed by Adobe in 1992 to present documents, including text formatting and images, in a manner independent of application software, hardware, and operating systems.
  • Fixing a PDF Error (Source):
    • Browsers other than Internet Explorer are not initially configured to open PDF forms with Adobe as the default and cause of the error. Here is the guidance on how to use the default browser of your choice.
      • Google Chrome: Open any PDF file saved on your computer > Click Edit > Select Preferences > Select Internet > Uncheck Allow Fast Web View
      • MS Edge: When the file opens in the browser window with the error message, click the save icon (right, upper corner) to save it to your computer and open it from the saved location.

PERSONAL FINANCIAL SUPPORT PROGRAM

(Last Update: Wednesday, 15JAN2025) (POC LOCATION: COMMAND FINANCIAL SPECIALIST (CFS))

PFA (PHYSICAL FITNESS ASSESSMENT) / PRT (PHYSICAL READINESS TEST)

(Last Update: Wednesday, 15JAN2025) (POC LOCATION: COMMAND FITNESS LEADER (CFL), MEDICAL or N7 TRAINING)

Navy Personnel Command > Support & Services > Culture & Resilience > Physical Readiness

PHA (PHYSICAL HEALTH ASSESSMENT)

(Last Update: Wednesday, 15JAN2025) (POC LOCATION: MEDICAL)

PHOTO

(Last Update: Wednesday, 15JAN2025) (POC LOCATION: N1 ADMIN)

Navy Personnel Command > Career Management > Detailing > Officer > Pers-41 SWO > Battle Admin > Official Photo

POC (POINT OF CONTACT)

(Last Update: Wednesday, 15JAN2025)

  • POC (Point Of Contact) Wikipedia – A person or department serving as the coordinator or focal point of information concerning an activity or program. A POC is used in many cases where information is time-sensitive and accuracy is important.

POINTS

(Last Update: Wednesday, 15JAN2025) (POC LOCATION: N1 ADMIN)

POLITICS

(Last Update: Wednesday, 15JAN2025) (POC LOCATION: SENIOR LEADERSHIP)

POST 9/11 GI BILL

(Last Update: Wednesday, 15JAN2025) (POC LOCATION: VA)

Career Management > Education > GI Bill > Post 9/11 GI Bill

POW (PRISONERS OF WAR)

(Last Update: Thursday, 09JAN2025)

PQS (PERSONNEL QUALIFICATION STANDARD)

(Last Update: Thursday, 27FEB2025) (POC LOCATION: N7 TRAINING)

  • Personnel Qualification Standard (PQS) – A systematic means for qualifying officers and enlisted personnel to perform assigned duties. A PQS is a written compilation of the knowledge and skills required by a person to qualify for a specific watch station, to maintain a particular equipment or system, or to perform as a team member within the assigned unit. PQS is an element of a unit’s overall training program. A PQS is in the format of a qualification guide that asks the questions a trainee must answer to verify his/her capability to perform a given task. It provides a systematic procedure to assist the individual in tracking and documenting the knowledge and qualifications required for increased professional responsibilities, additional technical skills, and eventual advancement in rating. The specific goal of the PQS program is to serve as a vehicle for the continuous qualification of the individual through school and on-the-job experience and to complement and support formal training programs. Further detailed information regarding PQS can be found in NAVEDTRA 43100-1, and the latest edition of OPNAVINST 3500.34.
  • ARTICLE – Navy PQS: Personnel Qualification Standards (09FEB2025)
  • Navy eLearning> Sailors should look under “Professional Resources,” and then select “Personnel Qualification Standard (PQS).” Downloadable PDFs provide assessment questions similar to the course completion assessment format in NeL and allow Sailors to accomplish all learning/study offline if necessary; however, credit for NRTC/RTM completion can only be accomplished now within NeL.
    Contact My Navy Career Center (MNCC) Help Desk via MNP under “Help & Info” or through the green chat button in the bottom right-hand corner, by calling (833) 330-6662, or emailing askmncc@navy.mil for NeL enrollment questions.
    NOTE: There is no workaround to accessing online training through Navy eLearning without a CAC.
    For any questions on NRTCs and RTMs, please send a message through our “Contact Us” page; use the contact form and choose “NETC PQS/RTM/NRTC Program Manager” as the recipient.
  • See also the EDUCATION / SCHOOL / TRAINING section.
  • See also the NAVY ELEARNING (NEL) section.

PRIMS-2 (PHYSICAL READINESS INFORMATION MANAGEMENT SYSTEM TWO)

(Last Update: Wednesday, 15JAN2025) (POC LOCATION: COMMAND FITNESS LEADER (CFL), MEDICAL or N7 TRAINING)

Navy Personnel Command > Support & Services > Culture & Resilience > Physical Readiness

PROCESS QUIK

(Last Update: Wednesday, 15JAN2025)

PROMOTION / COMMISSIONING

(Last Update: Wednesday, 15JAN2025) (POC LOCATION: SENIOR OFFICERS)

Navy Personnel Command > Boards > Reserve Officer

PSD (PERSONNEL SUPPORT DETACHMENT)

(Last Update: Wednesday, 15JAN2025) (POC LOCATIONS: CONUS and OCONUS)

  • PSD – Maintain pay accounts and personnel records of officer and enlisted Navy personnel attached to commands and activities of naval shore establishment, as assigned.
  • Or provides one-stop pay, personnel, administrative, and passenger transportation support. Support is also provided to military dependents of assigned personnel, retirees, and passenger transportation to Department of the Navy civilians.

PTSD (POST-TRAUMATIC STRESS DISORDER)

(Last Update: Wednesday, 15JAN2025) (POC LOCATION: MEDICAL)

PUBLIC AFFAIRS

(Last Update: Wednesday, 15JAN2025) (POC LOCATION: MC or PAO)

  • Public Affairs Wikipedia – A term for the formal offices of the branches of the United States Department of Defense whose purpose is to deal with the media and community issues. The term is also used for numerous media relations offices that are created by the U.S. military for more specific limited purposes. Public affairs offices are staffed by a combination of officers, enlisted personnel, civilian officials, and contract professionals. Public Affairs offices play a key role in contingency and deployed operations. The typical Public Affairs office is led by an officer who is in charge of planning, budgeting for, executing, and evaluating the effectiveness of public affairs programs, and provides public affairs advice, counsel, and support for commanders and senior staff members.
  • U.S. Navy Office of Information (703-697-5342)
  • VIDEO: Life as a Navy Public Affairs Officer (Gabe Wahl) (10DEC2023)

Q — “Quebec”

QUALITY REVIEW BOARD (QRB)

(Last Update: Sunday, 05JAN2025) (POC LOCATION: N1 ADMIN or CAREER COUNSELOR)

  • Quality Review Board (QRB) – A process used to evaluate and rank sailors for performance evaluations (evals) and promotions. The QRB process plays a crucial role in a sailor’s career progression, affecting promotions and future assignments. It aims to support the Navy’s objective of selecting and detailing the best-qualified individuals for positions of increased responsibility.
  • Ranking Process:
    Department-level ranking: E6/LPOs conduct initial QRBs to rank evals within their departments.
    Chain of command review: The rankings are then reviewed and adjusted by LCPOs, DIVOs, DLCPOs, and DHs.
    Command-wide ranking: Representatives from each division present their top sailors to a command-wide board.
    Evaluation criteria: Sailors are ranked based on job performance, qualifications, collateral duties, education, community service, and physical fitness.
    Forced distribution: The number of top evaluations (EPs and MPs) is limited based on the total number of sailors being evaluated.
  • Evaluation Scoring:
    Reporting Senior’s Cumulative Average (RSCA) is used to determine the overall evaluation scores.
    Top performers may receive scores above the RSCA, while others may receive lower scores to maintain the average.
    Evaluation scores are historical and based on performance over the past evaluation period, typically 12-15 months.
  • VIDEO: How To Conduct A Navy Ranking Board (QRB) | Step By Step (18FEB2024)

QUARTERDECK

(Last Update: Wednesday, 21MAY2025)

  • Quarterdeck Wikipedia – A raised deck behind the main mast of a sailing ship. Traditionally, it was where the captain commanded his vessel and where the ship’s colors were kept. This led to its use as the main ceremonial and reception area on board, and the word is still used to refer to such an area on a ship or even in naval establishments on land. Many such facilities have areas decorated like shipboard quarterdecks.
  • VIDEO: The Quarterdeck Watch (24OCT2014)
  • VIDEO: Permission to Come Aboard! (29AUG2023)

QUOTES

(Last Update: Sunday, 12JAN2025)

  • Google Image Search – Quotes
  • LCDR Beamsley’s favorite quote… “Never embarrass or surprise your leadership.”
  • Best Army Company Commander Quote in a warzone overheard by LCDR Beamsley, “I have an Open Door Policy. Please, DO NOT USE IT;)”

R — “Romeo”

RAIN (RESERVE ARTIFICIAL INTELLIGENCE NAVIGATOR)

(Last Update: Friday, 08AUG2025) (POC LOCATION: N1 ADMIN)

RANK / RATE / NEW RANK

(Last Update: Tuesday, 14JAN2025) (POC LOCATION: N1 ADMIN or CAREER COUNSELOR)

RAPIDS APPOINTMENT SCHEDULER

(Last Update: Tuesday, 14JAN2025) (POC LOCATION: RAPIDS SITE LOCATOR MAP)

  • RAPIDS Appt. Scheduler – A website that allows any CAC or ID card customer may schedule an appointment for card services.

RE (REENLISTMENT ELIGIBILITY) CODE

(Last Update: Saturday, 11JAN2025) (POC LOCATION: N1 ADMIN)

  • Readiness Wikipedia – A condition of the armed forces and their constituent units and formations, warships, aircraft, weapon systems, or other military technology and equipment to perform during combat military operations, or functions consistent with the purpose for which they are organized or designed, or the managing of resources and personnel training in preparation for combat.
  • Reenlistment Eligibility (RE) Codes are used to determine a sailor’s eligibility for reenlistment. Here are the main categories:
  • Eligible for Reenlistment:
    * RE-1: Eligible for reenlistment1
    * RE-R1: Recommended for preferred reenlistment
    * RE-1E: Eligible for reenlistment, but not reenlisted due to Career Waypoints (C-WAY) regulations
    * RE-1J: Eligible to reenlist but elected to separate
    * RE-5, RE-7: Also eligible for reenlistment
  • Ineligible for Immediate Reenlistment:
    * RE-2: Ineligible due to status (e.g., Fleet Reservist, retired, commissioned officer)
    * RE-3: Otherwise eligible except for disqualifying factors
  • RE-3 Subcategories:
    * RE-3A: Non-citizen, discharged per MILPERSMAN 1910-127
    * RE-3B: Restricted assignment due to parenthood, pregnancy, or childbirth
    * RE-3C: Conscientious objector
    * RE-3E: Inducted, enlisted, extended, or reenlisted in error
    * RE-3F: Failed the physical fitness assessment (PFA)
  • Depending on the specific circumstances, sailors with RE-3 codes may be eligible for reenlistment with a waiver. Those with RE-4 codes are typically ineligible for reenlistment without a change to their code.
  • VIDEO: Navy Reserve (Prior Service) RE Codes (17OCT2019)

READINESS

(Last Update: Tuesday, 14JAN2025)

  • Readiness Wikipedia – A condition of the armed forces and their constituent units and formations, warships, aircraft, weapon systems, or other military technology and equipment to perform during combat military operations, or functions consistent with the purpose for which they are organized or designed, or the managing of resources and personnel training in preparation for combat.

READY RESERVE SCREENING QUESTIONNAIRE

(Last Update: Tuesday, 14JAN2025) (POC LOCATION: N1 ADMIN)

READY TO SERVE (R2S)

(Last Update: Tuesday, 14JAN2025) (POC LOCATION: N6 INFORMATION PROFESSIONAL (IP) OFFICER or INFORMATION TECHNOLOGY (IT))

  • Ready to Serve (R2S) – The goal is to enable SELRES to report for duty across the globe and return to the home of record, receive broadcasts, access pay, and personnel information, and send/receive official e-mail using only an approved mobile device. [NOTE: Program began in 2016 and sunset on 15OCT2023.]
  • See also the NAUTILUS VIRTUAL DESKTOP (NVD) section.

RECALL

(Last Update: Tuesday, 14JAN2025) (POC LOCATION: MOB OFFICER)

RECORD MANAGEMENT

(Last Update: Tuesday, 14JAN2025) (POC LOCATION: N1 ADMIN)

Navy Personnel Command > Record Management > Electronic Service Record (ESR)

Navy Personnel Command > Record Management > OMPF My Record

RECORD OF EMERGENCY DATA/DEPENDENCY APPLICATION (RED/DA) (PAGE 2) NAVPERS 1070/602

(Last Update: Tuesday, 14JAN2025) (POC LOCATION: N1 ADMIN)

RECRUITING

(Last Update: Tuesday, 14JAN2025)

REFLECTIVE BELT

(Last Update: Tuesday, 14JAN2025)

RELIGIOUS ACCOMMODATIONS (RA)

(Last Update: Tuesday, 14JAN2025)

Navy Personnel Command > Support & Services > Religious Accommodations

  • Religious Accommodations (RA) – This includes accommodating a service member for an otherwise applicable military policy, practice, or duty. In accordance with The Religious Freedom Restoration Act, if such a military policy, practice, or duty substantially burdens a service member’s exercise of religious accommodation can only be denied if: 1. The military policy, practice, or duty is in furtherance of a compelling governmental interest (e.g. mission accomplishment, safety, force health).
    2. It is the least restrictive means of furthering that compelling governmental interest.
  • VIDEO: Religious Accommodations In The Military (22FEB2023)

RESCHEDULE / RESCHED

(Last Update: Tuesday, 14JAN2025) (POC LOCATION: SENIOR LEADER or N1 ADMIN)

RESERVE AFFILIATION

(Last Update: Tuesday, 02SEP2025)

Navy Personnel Command > Career Management > Transition

RESERVE FORCE MANPOWER TOOLS (RFMT) (APPLY/JOAPPLY)

(Last Update: Tuesday, 14JAN2025) (POC LOCATION: N1 ADMIN or CAREER COUNSELOR)

RESERVE PAY (RESPAY)

(Last Update: Tuesday, 14JAN2025) (POC LOCATION: N1 ADMIN or RESPAY)

  • See also the PAY section.

RESERVE RETIREMENT POINTS

(Last Update: Tuesday, 14JAN2025) (POC LOCATION: N1 ADMIN or CAREER COUNSELOR)

Navy Personnel Command > Career Management > Reserve Personnel Mgmt > IRR > Courses/Reserve Retirement Points FAQ

RESERVE TO ACTIVE DUTY

(Last Update: Tuesday, 14JAN2025) (POC LOCATION: CAREER COUNSELOR)

Navy Personnel Command > Community Managers > Enlisted > Selected Reserves > RC to AC

RESERVIST

(Last Update: Tuesday, 14JAN2025)

RETIREMENT

(Last Update: Thursday, 27FEB2025) (POC LOCATION: N1 ADMIN and CAREER COUNSELOR)

Career Management > Reserve Personnel Mgmt > Reserve Retirements

Navy Personnel Command > Support & Services > Culture & Resilience > Retired Activities

Navy reserve information resource - retirement information

TABLE: Military Compensation – Reserve Retirement Pay

  • Comparison of 401(k) and IRA accounts – This is a comparison between 401(k), Roth 401(k), Traditional Individual Retirement Account, and Roth Individual Retirement Account accounts, four different types of retirement savings vehicles.
  • How do I apply for a reserve retirement? (Note: Applying for Retirement with Pay / Applying for Retirement without Pay / Benefits for Gray Area Retirees and Recipients of Retired Pay)
  • Who do I contact for the status of a reservist’s retirement request?
    The retirement request of a reservist may be obtained by calling My Navy Career Center (MNCC) at 833-330-6622.
  • How do I calculate my reserve monthly retired pay?
    Monthly retired pay = (Points/360) x .025 x (Avg of highest 36 months of Base Pay) (using future pay scale in the year you turn 60 years old)
  • Who do I contact for the status of an active duty officer’s retirement request?
    PERS-835 (Officer Retirements) may be contacted by e-mail at pers_835_retirements@navy.mil for statuses on active duty/FTS/TAR retirements
  • Who do I contact for the status of an active-duty enlisted retirement request?
    PERS-836 (Enlisted Retirements) may be contacted by e-mail at enlisted_active_duty_retirements@navy.mil.

RISK

(Last Update: Saturday, 11JAN2025)

  • Risk Wikipedia – The possibility of something bad happening. Risk involves uncertainty about the effects/implications of an activity concerning something that humans value (such as health, well-being, wealth, property, or the environment), often focusing on negative, undesirable consequences. Many different definitions have been proposed. One international standard definition of risk is the “effect of uncertainty on objectives”.
  • See also the OPERATIONAL RISK MANAGEMENT (ORM) section.

ROE (RULES OF ENGAGEMENT)

(Last Update: Tuesday, 14JAN2025)

RUAD (RESERVE UNIT ASSIGNMENT DOCUMENT)

(Last Update: Tuesday, 14JAN2025) (POC LOCATION: N1 ADMIN)

  • My Navy Portal (CAC MNP) (Quick Links) > Navy Reserve Readiness Module (NRRM) > Smart RUAD
  • Reserve Unit Assignment Document (RUAD) – The official manning document and manpower authorization for Selected Reserve units. RUADs contain specific billet requirements for pay grade, designator/rating, and required Naval Officer Billet Classification (NOBC)/Navy Enlisted Classification (NEC) codes. Since exact paygrade, designator/rating, or NOBC/NEC matches are not always possible, RUADs list Reserve Functional Area and Sex (RFAS) codes that identify allowable substitutions. A unit’s current RUAD shows who is assigned to an authorized billet, those who are cross-assigned, and those who are assigned to a unit in an In Assignment Processing (IAP) status. The RUAD also contains IMS/MAS codes, PRD/NEC information, and mobilization data for each individual on the RUAD.
  • RUAD (Source: RESPERMAN 1001-010)
  • Decoder for US Navy app – android and ios it has the AMD, Enlisted Rating Codes (NEC), IMS Codes, MAS Codes, Navy Reserve Activity (NRA) Codes, NOBC Codes (Subspecialty Codes), Officer Billet Codes, Officer Designators, Officer Paygrade Codes, RBSC Billet Codes, Reserve Program Codes, Reserve Unit Identification Codes (UIC), RFAS Codes, RUAD, and other valuable items.
  • See also the CROSS ASSIGNMENT section.
  • See also the MYNAVY ASSIGNMENT (MNA) section.
  • See also the NRRM (NAVY RESERVE READINESS MODULE) section.

S — “Sierra”

SAILOR’S CREED

(Last Update: Saturday, 11JAN2025)

  • Sailor's CreedSailor’s Creed Wikipedia – A code of ethics of the United States Navy, originally developed to promote personal excellence. While other regulations, codes, and standards may apply to the United States Armed Forces writ large, the Sailor’s Creed is specific to the Navy. It focuses on self-respect, respect for others, and the Navy’s core values of honor, courage, and commitment. Recited by units almost daily, the Sailor’s Creed reinforces that personnel are sailors first (i.e., before their rating) and seeks to build esprit de corps throughout the Navy.
  • VIDEO: The Sailor’s Creed
  • VIDEO: The Sailor’s Creed (18FEB2012)
  • VIDEO: Sailors Creed (01APR2013)
  • VIDEO: Navy Sailor’s Creed (1 hour) (Repetition) (28APR2020)

SALESFORCE

(Last Update: Thursday, 24APR2025) (POC LOCATION: N1 ADMIN OR RESPAY)

Navy Personnel Command > Support & Services > MyNavy Career Center > Pers Pay Support > TRIAD Resources > Salesforce Library

SANCTUARY

(Last Update: Saturday, 11JAN2025) (POC LOCATION: N1 ADMIN or CAREER COUNSELOR)

Navy Personnel Command > Career Management > Boards > General Board Info > Status Non Select

  • The “Sanctuary” program, as defined by Title 10 of the United States Code, is a federal program for protecting military service members from being forced to leave military service when they are close to attaining active-duty retirement eligibility. Once a member has accrued 18 years of active-duty military service, they are protected by the “Sanctuary” program until they reach 20 years of service and are eligible for retirement. While “Sanctuary” protections are automatic for active-duty members, reserve military members serving in an active status (such as mobilized Reserve and National Guard members) will need to specifically claim this status to ensure they remain on active duty once their current tour ends.
  • Policy and procedures for reserve component sailors’ service beyond 16 years of active duty service (OPNAV INSTRUCTION 1001.27A)
  • Sanctuary In The Reserves: Only On Active Duty (09MAR2023)
  • See also the CAREER COUNSELOR section.
  • See also the RETIREMENT section.

SEABEE

(Last Update: Saturday, 11JAN2025)

Navy Personnel Command > Career Management > Community Management > Officer > Reserve OCM > Selected Reservists > RC CEC

Navy Personnel Command > Career Management > Community Management > Enlisted > Seabees

SEA DUTY INCENTIVE PAY (SDIP)

(Last Update: Saturday, 11JAN2025)

Navy Personnel Command > References > Pay & Benefits > SDIP

  • Sea Duty Incentive Pay (SDIP) – Designed to incentivize Sailors to voluntarily fill gapped billets at sea by remaining on sea duty past their prescribed sea tour (PST) or curtailing their shore duty to return to sea early. For additional information on SDIP and eligibility requirements, see the attachments below or email MILL_SDIP@NAVY.MIL.
  • See also the MYPAY section.
  • See also the PAY section.

SEAL (SEA, AIR, AND LAND)

(Last Update: Saturday, 11JAN2025)

Navy Personnel Command > Career Management > Community Management > Enlisted > Special Warfare > SEAL

Navy Personnel Command > Career Management > Officer > Active OCM > Unrestricted Line > Special Warfare OCM

SECURITY CLEARANCE

(Last Update: Saturday, 11JAN2025) (POC LOCATION: SSO)

  • Security Clearance Wikipedia – A status granted to individuals allowing them access to classified information or restricted areas, after completion of a thorough background check.
    • Security eligibility is a formal determination by an approved adjudicative authority that a person meets the EO 12968 personnel security eligibility standards for access to classified information. There are three levels of clearance eligibility: Confidential, Secret, and Top Secret. Eligibility is established at the highest levels supportable by the prerequisite personnel security investigation.
  • e-QIP (Electronic Questionnaires for Investigations Processing) Wikipedia Note: Applicants can only access the e-QIP system if they have been invited to do so by an appropriate official at their sponsoring agency.
  • View your Security Information – It is located in NSIPS under the Personal Information link – Security.
  • Defense Information Security System (DISS) is the enterprise-wide solution for personnel security, suitability, and credentialing management for DoD military, civilian, and contractors. DISS replaced the Joint Personnel Adjudication System (JPAS) as the System of Record on March 31, 2021. An innovative, web-based application, the platform provides secure communications between adjudicators, security officers, and components, allowing users to request, record, document, and identify personnel security actions. DISS will be an integral step toward the National Background Investigation Services (NBIS) platform currently in development and full implementation of the government-wide policy to overhaul the personnel vetting process known as Trusted Workforce 2.0.
  • DoD Foreign Clearance Guide (FCG) – Outlines all the requirements you must complete before traveling.
  • VIDEO: Security Clearances and How to Get Them (27FEB2024)
  • VIDEO: What’s Checked in a Secret Investigation? (24JAN2021)
  • VIDEO: What May Delay, But Won’t Disqualify You From Obtaining a Security Clearance (05MAY2012)

SELECTED RESERVISTS (SELRES)

(Last Update: Saturday, 11JAN2025)

Navy Personnel Command > Career Management > Community Management > Enlisted > Selected Reserves

Navy Personnel Command > Career Management > Community Management > Officer > Reserve OCM > Selected Reservists

  • Selected Reserve Wikipedia – The members of a U.S. military Ready Reserve unit who are enrolled in the Ready Reserve program and the reserve unit to which they are attached. Selected Reserve members and units are considered to be in active status. When the term is applied to personnel, it is contrasted to the Full-time Reserve Unit Support (also called Full Time Support or FTS) members of the same reserve unit who are Active Duty. It is also contrasted to members of the Individual Ready Reserve who are not in active status (Picture).
    • Active Status
      Selected Reserve members are considered to be in Active status. They are required to complete a specified number of drill periods per year by reporting to their reserve unit and completing the prescribed training. They are also required to complete two weeks of job-specific training. Selected Reserve members receive pay and benefits and are issued the same DoD Geneva Conventions Identification Card that Active Duty service members receive. When deployed or in Initial Active Duty Training (IADT), they are temporarily placed in full Active Duty status for the duration of their deployment or training orders.

Your orders will have several units listed, and as a result, you will meet several leadership teams responsible for different aspects of your life as a Selected Reservist (Navy Reserve Composition Picture).
• Your Navy Reserve Center (NRC) leadership is responsible for your administrative readiness.
• Your Training Reserve Unit (TRUIC) is responsible for your mobilization readiness (similar to administrative readiness). It is a part of your administrative chain of command and works in conjunction with your NRC. You will perform regular drills (IDTs- Inactive Duty for Training) with this unit.
• Your Unit Mobilization Unit (UMUIC) is responsible for your warfighting readiness and the performance of your duties in line with your rate or designator. You might perform your Annual Training (AT) with this unit.
• A Unit’s Identification Code (UIC). TRUIC stands for Training Reserve Unit Identification Code. UMUIC stands for Unit Mobilization Unit Identification Code. These terms are associated with a number to identify a particular unit.
• A “Locally Assigned Sailor” is one who’s TRUIC and UMUIC are the same (Picture).
• Typically, a Sailor is “Non Locally Assigned.” This means your TRUIC does not match your UMUIC (Picture).

Example: Your UMUIC, Unit X, drills in San Diego, but you live in Los Angeles, Unit Y. Rather than going to San Diego every month, you complete drills at NRC LA with your TRUIC, Unit Y. In this case, Unit Y administers your IDT periods; Unit X administers/controls your AT.
If you have not yet been assigned a unit, then you are considered In the Assignment Process (IAP). Individuals in IAP status are required to actively pursue billets via JO Apply or My Navy Assignment (MNA). Failure to actively search for billets will result in direct manning of the billet assignment.

SELECTION BOARD

(Last Update: Saturday, 11JAN2025) (POC LOCATION: N1 ADMIN or CAREER COUNSELOR)

Navy Personnel Command > Career Management > Boards

SELECTIVE REENLISTMENT BONUSES (SRB)

(Last Update: Saturday, 11JAN2025) (POC LOCATION: N1 ADMIN or CAREER COUNSELOR)

Navy Personnel Command > Career Management > Enlisted Career Admin > SRB SDAP Enl Bonus

  • Selective Reenlistment Bonuses (SRB) – Financial incentives provided to sailors to reenlist to maintain desired manning levels in specific ratings and NECs, with award levels and new skillset additions effective immediately, and specific submission guidelines and exceptions outlined in the Navy’s regulations and training modules.
  • VIDEO: FY 25 Navy Reserve Enlistment Bonus’ (15SEP2024)
  • See also the ADVANCEMENT section.

SERVICEMEMBERS CIVIL RELIEF ACT (SCRA)

(Last Update: Saturday, 11JAN2025) (POC LOCATION: N1 ADMIN or CAREER COUNSELOR)

SERVICE RECORD

(Last Update: Saturday, 11JAN2025) (POC LOCATION: N1 ADMIN)

SEXUAL ASSAULT

(Last Update: Saturday, 11JAN2025) (POC LOCATION: SAPR)

Navy Personnel Command > Support & Services > Culture & Resilience > Sexual Assault

  • Sexual Assault – An act in which a person intentionally sexually touches another person without that person’s consent, or coerces or physically forces a person to engage in a sexual act against their will. It is a form of sexual violence that includes rape (forced vaginal, anal, or oral penetration or drug-facilitated sexual assault), groping, child sexual abuse, or the torture of the person in a sexual manner.
  • Safe Helpline 24/7 by calling 877-995-5247
  • Sexual Assault Prevention and Response (SAPR) – Our mission is to prevent and respond to sexual assault, eliminating it from our ranks through a balance of focused education, comprehensive response, compassionate advocacy, and just adjudication to promote professionalism, respect, and trust, while preserving Navy mission readiness.
  • VIDEO: U.S. Navy: Sexual Assault Prevention and Response (21JUL2020)
  • VIDEO: U.S. Navy SAPR-D Training Video (07AUG2013)
  • VIDEO: Navy SAPR GMT Video Supplements (30NOV2022)

SGLI (SERVICEMEMBERS’ GROUP LIFE INSURANCE)

(Last Update: Saturday, 11JAN2025) (POC LOCATION: N1 ADMIN)

Navy Personnel Command > Support & Services > Casualty > Benefits and Entitlements > SGLI

SHARP

(Last Update: Saturday, 11JAN2025) (POC LOCATION: AVIATION)

  • SHARP V7.0 – A state-of-the-art web-based application sponsored by the Commander, Naval Air Forces. The entire active fleet and FRSs use it, and reserve Navy aviation communities, including tactical, maritime, helicopter, and logistics, ashore and afloat.
  • VIDEO: Uploading Your Navy SHARP records (15JUL2024)

SHIP

(Last Update: Thursday, 09JAN2025)

  • Ship Wikipedia – A large vessel that travels the world’s oceans and other navigable waterways, carrying cargo or passengers, or in support of specialized missions, such as defense, research, and fishing. Ships are generally distinguished from boats based on size, shape, load capacity, and purpose. Ships have supported exploration, trade, warfare, migration, colonization, and science. Ship transport is responsible for the largest portion of world commerce.
  • Shipboard DirectionsList of ship directions Wikipedia – This list of ship directions provides succinct definitions for terms applying to spatial orientation in a marine environment or location on a vessel, such as fore, aft, astern, aboard, or topside.
  • VIDEO: The Evolution of the Warship – Heavy Metal | Naval History (Full Free Documentary) (06JAN2022)
  • See also the AIRCRAFT CARRIER section.
  • See also the DESTROYER section.
  • See also the CRUISER section.
  • See also the FRIGATE section.

SHIPBUILDING

(Last Update: Saturday, 11JAN2025)

SIPR (NON-CLASSIFIED INTERNET PROTOCOL)

(Last Update: Saturday, 11JAN2025)

SITREP (SITUATION REPORT)

(Last Update: Saturday, 11JAN2025)

  • Situation Report (SITREP) – A critical communication tool used to provide timely information on important situations, military operations, and events. It serves to keep decision-makers and relevant parties informed about current circumstances and actions taken or planned.
  • Key Components of a Navy SITREP:
    1. Incident Identification and Details: This section includes specific information about the event or situation being reported.
    2. Victim Information: For incidents involving personnel, non-personally identifiable information (non-PII) about the victim is provided.
    3. Alleged Offender Information: Details about the alleged offender, if applicable, are included.
    4. Actions Taken: A summary of actions completed to date related to the incident or situation.
    5. Planned Actions: Brief reporting of scheduled or planned actions for the period covered by the SITREP.
    6. Issues and Concerns: Description of known or expected issues that may arise before the next SITREP.
  • Submission and Format:
    Navy SITREPs are typically submitted using the OPREP-3 Navy Blue or OPREP-3 Navy Unit SITREP format. The report should be concise, clear, and focus on providing context and meaning in addition to facts. For certain situations, such as sexual assault incidents, a specific SAIRO (Sexual Assault Incident Response Oversight) 8-day Report is required within eight calendar days of the initial report.
    • Purpose and Importance:
      SITREPs are crucial for:
    • Providing a quick understanding of current situations to decision-makers
    • Ensuring timely communication of critical information up the chain of command
    • Facilitating appropriate responses and resource allocation
    • Maintaining situational awareness across relevant Navy units and commands
  • By following established SITREP protocols and best practices, Navy personnel can ensure effective and consistent communication during critical situations and operations.
  • Bottom line: It is a report of what is happening.
  • VIDEO: Navy SITREP Training (22NOV2019)
  • VIDEO: Navy SITREP Reporting (08JAN2020)
  • See also the COMMUNICATION section.
  • See also the EMAIL section.

SKILLBRIDGE

(Last Update: Thursday, 15MAY2025) (POC LOCATION: N1 ADMIN or CAREER COUNSELOR)

Navy Personnel Command > Career Management > Transition > SkillBridge

SOCIAL MEDIA

(Last Update: Wednesday, 29OCT2025) (POC LOCATION: MC or PAO)

SOP (STANDARD OPERATING PROCEDURES)

(Last Update: Saturday, 11JAN2025)

SPACE-A TRAVEL

(Last Update: Saturday, 11JAN2025) (POC LOCATION: AMC (Air Mobility Command) Passenger Terminal)

SPECIAL DUTY ASSIGNMENT PAY (SDAP)

(Last Update: Saturday, 11JAN2025)

Navy Personnel Command > References > Pay & Benefits > SDAP

Navy Personnel Command > Career Management > Enlisted Career Admin > SRB SDAP Enl Bonus

  • Special Duty Assignment Pay (SDAP) – A monthly incentive pay given to qualified personnel working in designated assignments to maintain adequate manning levels, with eligibility based on assignment to a valid billet and command officer authorization.
  • See also the ADVANCEMENT section.
  • See also the MYPAY section.
  • See also the PAY section.

SPECIAL NEEDS SUPPORT

(Last Update: Saturday, 11JAN2025)

Navy Personnel Command > Support & Services > Exceptional Family Member

SPOUSE

(Last Update: Saturday, 11JAN2025) (POC LOCATION: OMBUDSMAN)

SSP (SUBSPECIALTY) CODES

(Last Update: Saturday, 11JAN2025) (POC LOCATION: N1 ADMIN)

Navy Personnel Command > Career Management > Reserve Personnel Mgmt > Officers > NOBC AQD

  • SSP Codes – A manpower and personnel classification system that establishes the criteria and procedures for identifying officer (Unrestricted Line, Restricted Line, and Staff Corps) requirements for advanced education, training, and experience in a variety of disciplines, as well as identifying the officers who possess these skills and knowledge.
  • PART B – Subspecialty (SSP) Codes – Manual of Navy Officer Manpower and Personnel Classifications Major Code Structures NAVPERS 15839I (APR2023)
  • Decoder for US Navy app – android and ios it has the AMD, Enlisted Rating Codes (NEC), IMS Codes, MAS Codes, Navy Reserve Activity (NRA) Codes, NOBC Codes (Subspecialty Codes), Officer Billet Codes, Officer Designators, Officer Paygrade Codes, RBSC Billet Codes, Reserve Program Codes, Reserve Unit Identification Codes (UIC), RFAS Codes, RUAD, and other useful items.

STANDARD OF CONDUCT

(Last Update: Saturday, 11JAN2025)

STATUS OF NAVY

(Last Update: Saturday, 11JAN2025)

STRATEGIC SEALIFT OFFICER (SSO)

(Last Update: Saturday, 11JAN2025)

SUBMARINE (BOAT)

(Last Update: Saturday, 11JAN2025)

SUICIDE PREVENTION

(Last Update: Saturday, 11JAN2025)

SUPPLY

(Last Update: Saturday, 11JAN2025) (POC LOCATION: N4 LOGISTICS)


T — “Tango”

TAP (TRANSITION ASSISTANCE PROGRAM)

(Last Update: Sunday, 19JAN2025) (POC LOCATION: ACTIVE DUTY PROGRAM: CAREER COUNSELOR)

Navy Personnel Command > Career Management > Transition > Transition TAP

TAR (TRAINING AND ADMINISTRATION OF THE RESERVE)

(Last Update: Sunday, 19JAN2025) (POC LOCATION: N1 ADMIN)

Navy Personnel Command > Career Management > Community Management > Officer > Reserve OCM > TAR

TAX

(Last Update: Thursday, 24APR2025) (POC LOCATION: IRS or DFAS)

TELEWORK

(Last Update: Sunday, 19JAN2025)

TEMPORARY DUTY/RECALL

(Last Update: Sunday, 19JAN2025) (POC LOCATION: N7 TRAINING)

(IDT, AT, ADT, ADOS, PRC, RECALL, MOB) – Termination of DoD’s Flat Rate Per Diem Policy from FY2015. FY2019 NDAA allows members to get 100% per diem.

TEST PILOT SCHOOL

(Last Update: Sunday, 19JAN2025)

THINK TANK

(Last Update: Sunday, 27APR2025)

  • Think tanks Wikipedia – Are influential research organizations that provide policy analysis and strategic recommendations to support U.S. Navy operations and national security. They conduct studies on naval strategy, maritime security, and defense modernization, often funded by government contracts or defense contractors. Their work shapes military and policy decisions, though funding sources may influence their priorities and perspectives.
    • Atlantic Council Wikipedia
      • Overview: A nonpartisan think tank established in 1961, the Atlantic Council focuses on international affairs, defense, and transatlantic security cooperation. CHANNELABOUT
      • Relevance to U.S. Navy: Its Scowcroft Center for Strategy and Security conducts research on naval strategy, maritime alliances (e.g., NATO), and emerging technologies like autonomous naval systems. It also addresses maritime challenges in regions like the Arctic and Indo-Pacific.
      • Location: Washington, D.C.
    • Center for a New American Security (CNAS) Wikipedia
      • Overview: CNAS is a bipartisan think tank focusing on national security and defense policy, known for its pragmatic and principled approaches. CHANNEL
      • Relevance to U.S. Navy: CNAS conducts research on naval modernization, maritime irregular warfare, and the strategic role of the Navy in great power competition, particularly against China. Its reports often explore naval force structure and technology integration.
      • Location: Washington, D.C.
    • Center for Naval Analyses (CNA) Wikipedia
      • Overview: CNA is a federally funded research and development center (FFRDC) that directly supports the U.S. Navy and Marine Corps. It provides in-depth analysis on naval operations, strategy, and policy, making it one of the most Navy-focused think tanks. CHANNELHISTORY
      • Relevance to U.S. Navy: CNA conducts studies on naval warfare, force structure, readiness, and emerging threats, often working directly with Navy leadership to inform decision-making. For example, it has analyzed topics like shipbuilding programs and maritime security.
      • Location: Arlington, Virginia.
    • Center for Strategic and International Studies (CSIS) Wikipedia
      • Overview: CSIS is a bipartisan, nonprofit think tank specializing in defense, national security, and international affairs. It is recognized as a leading think tank in defense and national security research. CHANNEL
      • Relevance to U.S. Navy: CSIS researches maritime security, naval strategy, and Indo-Pacific defense issues, including U.S. Navy operations in contested regions like the South China Sea. Its reports often address naval force posture and modernization.
      • Location: Washington, D.C.
    • Hudson Institute Wikipedia
      • Overview: A conservative think tank, Hudson focuses on national security, defense, and foreign policy, with a strong emphasis on U.S. military strategy. CHANNELABOUT
      • Relevance to U.S. Navy: Hudson’s research includes maritime strategy, naval power projection, and countering threats from adversaries like China and Russia. It has influenced defense policy, particularly during Republican administrations.
      • Location: Washington, D.C.
    • RAND (Research and Analysis for Naval Defense) Wikipedia
      • Overview: RAND is a nonpartisan, nonprofit think tank established in 2025, dedicated to advancing research and analysis for naval defense, national security, and maritime strategy. It conducts rigorous, evidence-based studies to support U.S. Navy operations and broader defense policy, emphasizing innovation and strategic foresight. CHANNELVIDEO
      • Relevance to U.S. Navy: RAND provides in-depth analysis on naval warfare, force structure, maritime security, and emerging technologies, such as autonomous vessels and cyber defense at sea. It works closely with Navy leadership to inform decision-making on shipbuilding, readiness, and strategic competition in key regions like the Indo-Pacific and Arctic. RAND’s research also explores naval alliances and modernization to counter threats from adversaries like China and Russia.
      • Location: Washington, D.C.

THRIFT SAVINGS PLAN (TSP)

(Last Update: Sunday, 19JAN2025) (POC LOCATION: N1 ADMIN or CAREER COUNSELOR)

TMT (TASK MANAGEMENT TOOL) or ENTERPRISE TASK MANAGEMENT SYSTEM 2.0 (ETMS2)

(Last Update: Sunday, 19JAN2025)

TOPS

(Last Update: Saturday, 11JAN2025) (POC LOCATION: N1 ADMIN OR RESPAY)

  • Transaction Online Processing System (TOPS) – A key component of the U.S. Navy’s pay and personnel management system. It was the primary tool for submitting pay, personnel, and transportation transactions within the Navy. However, TOPS has been replaced by newer systems in recent years. In the summer of 2022, SalesForce replaced TOPS as the primary focal point for transaction management.
  • See also the SALESFORCE section.

TRAINING

(Last Update: Sunday, 19JAN2025) (POC LOCATION: CAREER COUNSELOR and N7 TRAINING)

TRAVEL

(Last Update: Sunday, 19JAN2025)

  • American Forces Travel – A DoD-sponsored website for leisure travel. It’s available to ACDU, Reserve, and Retirees. The site is Priceline-supported and offers deals on hotels, rental cars, airlines, cruises, and attraction/event tickets. Proceeds benefit Navy and Marine Corps MWR programs. To verify your eligibility, you will be prompted to input the last four digits of your SSN, your last name, and your full date of birth.
  • DoD Lodging.net – This is located on or near US military installations and is owned and operated by the Government. Travelers can book official travel lodging at Air Force Inns, Navy Gateway Inns & Suites, Navy Lodge, and Army Lodging directly in DTS.
  • MWR Wikipedia – Morale, Welfare, and Recreation (MWR) is a network of support and leisure services. Each branch of the United States Armed Forces has a branch. MWR provides free and discounted recreation to military personnel and their families (VIDEO).
  • Space-A.net (Space-Available) – DoD Military Space-Available Travel is a means by which uniformed members of US services, reservists and retirees, US DoD civilian personnel (under certain circumstances), and each of these groups’ dependents are permitted to travel on aircraft under the jurisdiction of the US DoD when excess capability allows.
  • VIDEO: Sea and Shore Tours | Navy Duty Rotations (10JUN2021)
  • VIDEO: BEST Navy Jobs To TRAVEL?…Not What You Will Expect?! (24SEP2020)
  • See also the DTS (DEFENSE TRAVEL SYSTEM) section.
  • See also the GOVERNMENT TRAVEL CHARGE CARD (GTCC) section.
  • See also the NROWS (NAVY ORDER WRITING SYSTEM) / TRAVEL section.
  • See also the SPACE-A TRAVEL section.

T-READY (TRAIN-READY)

(Last Update: Sunday, 19JAN2025)

  • T-Ready (2nd link)- A Navy Reserve web-based application that ensures Sailors are “Ready on Day One” for deployment by providing visibility into individual training and mobilization readiness, allowing leadership (RPDs and UMUIC COs) to identify, document, and address training requirements, ultimately fostering continuous warfighting readiness for effective performance in mobilization billets. Documents include Personnel Qualification Standard (PQS), Job Qualification Requirements (JQR), On-the-Job Training (OJT), certifications, licenses, and qualifications [Source].
  • REDDIT: T-Ready

TRIAD

(Last Update: Sunday, 19JAN2025)

TRICARE

(Last Update: Sunday, 19JAN2025) (POC LOCATION: MEDICAL)

  • TRICARE Wikipedia – A public website that provides information about TRICARE’s health care program serving Uniformed Service members, retirees, and their families worldwide. It is a health care program of the US DoD Military Health System.
  • TRICARE Patient Portal– A secure web portal offering online military hospital or clinic appointments, prescription refills, and new fills, and personal health data for eligible beneficiaries. In addition, it provides access to a Secure Messaging service that allows you to securely communicate non-urgent, non-emergency healthcare issues and concerns with your provider team.
  • VIDEO: Choosing Between TRICARE Prime and TRICARE Select (12DEC2023)
  • VIDEO: Navy Reserve Tricare and Mobilization (What Happens) (06JUN2020)
  • VIDEO: Military Healthcare | Tricare Reserve Select | National Guard and Reserve (NEW) (02SEP2020)
  • See also the MEDICAL section.

TWMS (TOTAL WORKFORCE MANAGEMENT SYSTEM)

(Last Update: Sunday, 19JAN2025) (POC LOCATION: N7 TRAINING)


U — “Uniform”

UIC (UNIT IDENTIFICATION CODE)

(Last Update: Sunday, 27APR2025) (POC LOCATION: N1 ADMIN or N7 TRAINING)

  • Unit Identification Code (UIC) – A five-character alphanumeric code assigned to all Navy activities. The UIC is a means of identifying activities, and it is necessary to conduct financial and manpower transactions.
  • Navy Organization Change Manual (OPNAVINST 5400.44A)
  • Search Options:
    • Excel Spreadsheet from Secretary of the Navy and Chief of Naval Operations Shore and Fleet Address Listings (25OCT2022) (Reference: Standard Navy Distribution List (SNDL) OPNAVINST 5400.45)
    • NRH select commands/ CNRFC/ N-Codes/ N1 Manning and Personnel
        • Located at – https://private.navyreserve.navy.mil/cnrfc/N-Codes/N1/Pages/default.aspx
        • Under the “N1 Hot Docs” tab in the middle of the screen
        • File Name – CNRFC N1 SELRES Manning Cube
      • Tab Name – Unit Triad Email
    • Search Google: (Unit Name) UIC
    • MNA has UICs/Commands/Contact info when in the apply phase and searching for billets
    • NROWS Planner access can look up UICs
    • NSIPS CPPA can look up UICs for you
    • Decoder for US Navy app – android and ios it has the AMD, Enlisted Rating Codes (NEC), IMS Codes, MAS Codes, Navy Reserve Activity (NRA) Codes, NOBC Codes (Subspecialty Codes), Officer Billet Codes, Officer Designators, Officer Paygrade Codes, RBSC Billet Codes, Reserve Program Codes, Reserve Unit Identification Codes (UIC), RFAS Codes, RUAD, and other useful items.

UNDERSEA

(Last Update: Saturday, 11JAN2025) (POC LOCATION: SUBMARINE WARFARE OFFICER OR SUBMARINE ENLISTED COMMUNITY)

UNIFORM

(Last Update: Saturday, 11JAN2025) (POC LOCATION: N4 LOGISTICS)

Navy Personnel Command > References > U.S. Navy Uniforms > Uniform Regulations

UNIFORM CODE OF MILITARY JUSTICE (UCMJ)

(Last Update: Saturday, 11JAN2025) (POC LOCATION: JAG or LN)

UNITED NATIONS CONVENTION ON THE LAW OF THE SEA

(Last Update: Saturday, 11JAN2025) (POC LOCATION: JAG or LN)

  • United Nations Convention on the Law of the Sea (UNCLOS) Wikipedia – An international treaty that provides a legal framework for maritime activities and has 169 state parties, including the EU, as of October 2024. Adopted in 1982 and effective since 1994, it replaced earlier high seas treaties and established bodies like the International Seabed Authority to oversee its implementation. In 2023, a High Seas Treaty was added to enhance ocean conservation with tools like Marine Protected Areas and environmental assessments.
    • Territorial sea: Up to 12 nautical miles (22 kilometers; 14 miles) from the baseline, the coastal state is free to set laws, regulate the use, and use any resource; in essence, the coastal State enjoys Sovereign rights and sovereign jurisdiction within its territorial sea.
    • Exclusive economic zones (EEZs) – Areas extending 200 nautical miles (370 km; 230 mi) from a coastal nation’s baseline, where the nation holds exclusive rights to exploit natural resources, including marine exploration and energy production from water and wind.
  • VIDEO: Introduction to UNCLOS and the sources of the law of the sea (21APR2020)
  • VIDEO: United Nations Convention on laws of the seas (09SEP2024)
  • VIDEO: The UN Convention on the Law of the Sea: origins and importance (14AUG2013)

UNITED SERVICES MILITARY APPRENTICESHIP PROGRAM (USMAP)

(Last Update: Monday, 26MAY2025) (POC LOCATION: CAREER COUNSELOR)

UNITED STATES NAVAL ACADEMY (USNA)

(Last Update: Saturday, 11JAN2025) (POC LOCATION: ACADEMY OFFICER (aka RING KNOCKER))

Navy Personnel Command > Career Management > Career Counseling > Commissioning Programs

  • Naval Academy Wikipedia – The United States Naval Academy (USNA, Annapolis, or simply Navy) is a federal service academy adjacent to Annapolis, Maryland. Established on 10 October 1845, it educates officers for commissioning primarily into the United States Navy and the United States Marine Corps. The entire campus (known to insiders as “the Yard”) is a National Historic Landmark and home to many historic sites, buildings, and monuments.
  • Admissions – Candidates for admission generally must apply directly to the academy and receive a nomination, usually from a member of Congress. Students are officers-in-training with the rank of midshipman. Tuition for midshipmen is fully funded by the Navy in exchange for an active duty service obligation upon graduation. Approximately 1,200 “plebes” (an abbreviation of the Ancient Roman word plebeian) enter the Academy each summer for the rigorous Plebe Summer. About 1,000 midshipmen graduate. Graduates are usually commissioned as ensigns in the Navy or second lieutenants in the Marine Corps, but a small number can also be cross-commissioned as officers in other U.S. services and the services of allied nations. The academic program grants a Bachelor of Science degree with a curriculum that grades midshipmen’s performance based on a comprehensive educational program, military leadership performance, and mandatory participation in competitive athletics.
  • VIDEO: What’s Inside The United States Naval Academy? (20NOV2024)
  • VIDEO: The Classroom Experience at the Naval Academy: Insight into USNA Academics in Annapolis, MD (07SEP2024)
  • VIDEO: United States Naval Academy Admissions Brief (19OCT2020)
  • VIDEO: The U.S. Naval Academy Yard: A Video History (04DEC2023)
  • VIDEO: How Much You Can Get Paid to Go to The Naval Academy!!! (13MAR2021)

    Navy reserve information resource

  • FootballArmy-Navy Game Wikipedia – The Army-Navy Game is an American college football rivalry game between the Army Black Knights of the United States Military Academy (USMA) at West Point, New York, and the Navy Midshipmen of the United States Naval Academy (USNA) at Annapolis, Maryland. The Army-Navy game is one of college football’s most traditional and enduring rivalries. It has been frequently attended by sitting U.S. presidents. The game marks the end of the college football regular season and the third and final game of the season’s Commander-in-Chief’s Trophy series. It is played on the second Saturday in December. [Spirit Spots: Big Deck, We Give a Ship and Helm Yeah]
  • VIDEO CHANNEL: U.S. Naval Academy
  • VIDEO: Don’t Stop Believing at the Army Navy Game (11DEC2022)
  • See also the EDUCATION / SCHOOL / TRAINING section.

UNITED STATES NAVAL INSTITUTE

(Last Update: Saturday, 11JAN2025)

UNITED STATES NAVY

(Last Update: Saturday, 11JAN2025)

  • United States Navy (USN) – The maritime service branch of the United States Armed Forces (aka Department of Navy (DON)) and one of the eight uniformed services of the United States. It is the largest and most powerful navy in the world, with the estimated tonnage of its active battle fleet alone exceeding the next 13 navies combined, including 11 allies or partner nations of the United States as of 2015. It has the highest combined battle fleet tonnage (4,635,628 tonnes as of 2019) and the world’s largest aircraft carrier fleet, with eleven in service, two new carriers under construction, and five other carriers planned. With 336,978 personnel on active duty and 101,583 in the Ready Reserve, the United States Navy is the third largest of the United States military service branches in terms of personnel. It has 290 deployable combat vessels and more than 2,623 operational aircraft as of June 2019.
  • Mission – Is to maintain, train, and equip combat-ready naval forces capable of winning wars, deterring aggression, and maintaining freedom of the seas.
  • VIDEO CHANNEL: U.S. Navy
  • VIDEO: America’s Navy: World Class and Worldwide by Defense Media Activity (12OCT2022)
  • VIDEO: “History of the U.S. Navy: 1775 – Today” – October 13th Navy Birthday Special (13OCT2021)
  • VIDEO: The History of the United States Navy (29AUG2019)

URINALYSIS

(Last Update: Saturday, 11JAN2025)

Navy Personnel Command > Support & Services > Culture & Resilience > Drug Alcohol Deterrence > Systems > iFTDTL

USO (UNITED SERVICE ORGANIZATIONS)

(Last Update: Saturday, 11JAN2025)

USS CONSTITUTION

(Last Update: Saturday, 11JAN2025)


V — “Victor”

VETERANS AFFAIRS

(Last Update: Saturday, 11JAN2025) (POC LOCATION: VA)

  • The United States Department of Veterans Affairs (VA) Wikipedia – A Cabinet-level executive branch department of the federal government charged with integrating life-long healthcare services to eligible military veterans at the 1700 VA medical centers and outpatient clinics located throughout the country. Non-healthcare benefits include disability compensation, vocational rehabilitation, education assistance, home loans, and life insurance, and provide burial and memorial benefits to eligible veterans and family members at 135 national cemeteries.
  • VA Customer Service: 800-698-2411
  • VA History Office
  • VIDEO CHANNEL: U.S. Dept. of Veterans Affairs

VETERANS DAY

(Last Update: Saturday, 11JAN2025)

VETERANS RESOURCES

(Last Update: Saturday, 11JAN2025)

VIETNAM VETERANS MEMORIAL

(Last Update: Saturday, 11JAN2025)

  • Vietnam Veterans Memorial (The Wall) Wikipedia – A U.S. national memorial in Washington, D.C. that honors service members of the U.S. armed forces who fought in the Vietnam War, service members who died in service in Vietnam/South East Asia, and those service members who were unaccounted for during the war.
  • The Virtual Wall Vietnam Veterans Memorial
  • VIDEO: Vietnam Veterans Memorial

VOLUNTARY TRAINING UNIT (VTU)

(Last Update: Saturday, 11JAN2025)

  • Voluntary Training Unit (VTU) – It consists of personnel, organized into units, who are eligible and willing to return to a pay status or personnel not eligible for further pay assignments but who voluntarily drill for retirement points. NRCs under the cognizance of COMNAVRESFORCOM are responsible for the continual screening and management of their attached VTUs. Supporting Directive: BUPERSINST 1001.39F CH-1 chapter 3 par. 301.2; RESPERSMAN 1300-010 CH-2

VOTE

(Last Update: Saturday, 11JAN2025)


W — “Whiskey”

Navy reserve information resourceWAR

(Last Update: Saturday, 11JAN2025)

WARFARE

(Last Update: Saturday, 11JAN2025) (POC LOCATION: CAREER COUNSELOR)

WARRANT OFFICER

(Last Update: Saturday, 11JAN2025)

Navy Personnel Command > Career Management > Community Management > Officer > Active OCM > LDO CWO

WATCH

(Last Update: Saturday, 11JAN2025)

WELCOME ABOARD PACKAGE

(Last Update: Saturday, 11JAN2025) (POC LOCATION: CAREER COUNSELOR)


X — “X-Ray”

XO (EXECUTIVE OFFICER)

(Last Update: Friday, 10JAN2025)

  • Executive officers (XO) – A person who is the direct representative of the commanding officer (CO) and shall be primarily responsible to the commanding officer for the organization, performance of duty, training, maintenance, and good order and discipline of the entire command. The executive officer executes the policies of the commanding officer, assisted by subordinates. His/her orders will have the same force and effect as if issued by the commanding officer. The executive officer assumes command, should the need arise, as defined by NAVREGS. (Source: OPNAVINST 3120.32D CH-1) (15MAY2017)
    • The executive officer, subject to the orders of the commanding officer, assisted by subordinates, will:
      1. Make frequent inspections in the company, when practicable, with the subordinates concerned; and correct
      defects.
      2. Supervise and coordinate the work, exercises, training, and education of the personnel in the command.
      3. Supervise and coordinate the operational plans and schedules of the command.
      4. Prepare and issue a daily schedule of employment and such other advance schedules as may aid subordinates in
      planning their work.
      5. Ensure that all prescribed or necessary security measures and safety precautions are understood and strictly
      observed.
      6. Evaluate the performance of officers and enlisted personnel and make recommendations to the commanding officer
      concerning their promotion and advancement.
      7. Regulate liberty and leave.
      8. Oversee all boards and committees unless otherwise identified.
      9. Supervise the organization and operation of the unit’s Maintenance and Material Management System (3M) Program.
  • Best Practices for the Surface Warfare XO (Source: U.S. Naval Institute Wikipedia Proceedings magazine, September 2003)
  • TRIAD Resources
  • TOOL: EUCFR Guide

Y — “Yankee”

YELLOW RIBBON REINTEGRATION PROGRAM (YRRP)

(Last Update: Friday, 10JAN2025)

YEOMAN (YN)

(Last Update: Friday, 10JAN2025) (POC LOCATION: N1 ADMIN)

  • YN – Yeoman Wikipedia – A yeoman is an enlisted person within the United States Navy who performs administrative and clerical work.
  • VIDEO: Yeoman

Z — “Zulu”

ZIPSERVE

(Last Update: Thursday, 09JAN2025) (POC LOCATION: N7 TRAINING)

ZULU TIME

(Last Update: Thursday, 09JAN2025)

  • ZULU Time – Coordinated Universal Time (UTC) is the world’s primary time standard regulating clocks and time. It is effectively a successor to Greenwich Mean Time (GMT). UTC is sometimes known as “Zulu time”. This is especially true in aviation, where “Zulu” is the universal standard. This ensures that all pilots, regardless of their location, use the same 24-hour clock, thereby avoiding confusion when flying between time zones.
  • VIDEO: Zulu Time

© 2001-2026 KellyBeamsley.com All rights reserved. Privacy Policy. Terms of Service.